An integrated basin looks simple on a drawing: one slab, one sink, no seam. That is exactly why quotations go wrong. When the basin and countertop are made as a single piece, almost every decision — depth, overflow, tap position, waste size — has already been locked in before the unit leaves the factory. A supplier quote for an integrated basin is therefore not a price list; it is the record of those decisions. Read it carefully and you avoid re-cuts, wrong wastes and site delays.

1. Dimensions stated as a full set, not one number

Our Integrated Basin is made to measure for each project, so the quote should list width, depth and slab thickness separately, plus the internal basin dimensions and the position of the bowl relative to the counter edge. A line that only says "1200 mm vanity" tells you nothing about whether the bowl sits where your tap and mirror already do.

  • Overall counter width and projection, with the tolerance band stated
  • Basin internal length, width and bowl depth
  • Slab thickness at the rim and at the fall to the waste
  • Set-back from wall to basin centre, and from counter edge to tap holes

2. Material and finish named precisely

"Stone-look" is not a specification. Ask the quote to name the material system and the finish for both the deck and the bowl, since these are often quoted as one item but produced differently. Where the design calls for a stone or marble deck, check whether the same material carries through into the basin or stops at the rim. For matching decks and surfaces, see Santerson Stone & Marble Surfaces.

  • Material type and surface finish for deck and bowl, listed as separate items
  • Edge profile and whether the front edge is polished on all visible faces
  • Whether colour and veining are matched or selected from a batch

3. Waste, overflow and tap details

These three items cause the most rework because they sit behind the counter and are impossible to change later. The quote should state the waste outlet diameter, whether a slotted or unslotted waste is required, whether an overflow is included, and how many tap holes are drilled and at what spacing. If you intend wall-mounted or deck-mounted taps, that choice belongs in the written quotation, not in a site conversation.

4. How the unit fixes and where it can be cut

Ask which fixing method is supplied, what clearance is needed under the counter for the waste assembly, and whether the counter can be trimmed on site at all. Some integrated units allow a small scribe cut at the wall side; others must be produced to exact size because the finished edge cannot be re-cut in the field. A good quotation states this limitation in writing so your installer knows before the crate arrives.

5. Comparison with other basin types on the same counter

If cost or lead time is driving the decision, ask for an alternative priced on the same sheet. An undermount bowl lets you change the basin without replacing the deck, and a vessel unit sits above the counter so the slab stays standard. Comparing options side by side is fairer than judging one number in isolation.

Basin typeWhat the quote must fixWhere it gives you flexibility
Integrated basinBowl shape and depth, tap holes, waste and overflow — all settled at productionFull design freedom; seamless deck is easy to wipe down
Santerson Undermount BasinCut-out size and countertop compatibilityBowl can be swapped without re-making the deck
Santerson Vessel Basin (Above Counter)Tap height and reach above the rimStandard slab; simplest access to waste pipework
Santerson Double Basin CountertopBasin spacing and the shared waste runTwo users; one production run instead of two orders

6. What is included in the price, and what is not

Line-by-line clarity protects both sides. Confirm whether the waste set, seals, fixings, protective crating and any sample of the finish are inside the quoted amount or charged separately. For multi-room orders, ask whether all basins ship together or in stages that match your site programme.

  • Unit price per piece, plus packaging and handling
  • Freight mode, delivery address and who clears customs at destination
  • Packaging standard for stone-look slabs on long sea legs
  • Who signs off the shop drawing, and by when

7. Approval drawings and the change window

Because an integrated basin is produced to your dimensions, a marked-up drawing should come back before production starts. Check that the quotation names the approval step and the date after which changes attract a charge. Our Custom & OEM Service covers bespoke sizing, finishes and prototyping, so the drawing stage is where last adjustments belong — after sign-off, the cut is fixed.

8. Lead time, delivery scope and support after arrival

Ask for production time and transit time as separate figures, since a quoted "delivery date" that blends the two hides where risk sits. Our Logistics & Door-to-Door Delivery service arranges freight forwarding and paperwork through to the site address, and Installation & After-sales Support covers inspection and snagging once goods land. Confirm for your project which of these are included, and what the quotation says about replacement parts for wastes and seals.

Quick pre-order check: full dimensions with tolerances · material and finish named for deck and bowl · waste type, overflow and tap holes stated · fixing method and on-site trimming limits · packaging and freight scope · signed shop drawing before production · separate production and transit times. If any of these are missing, ask before you sign — that is cheaper than a re-made counter.

Send us your bathroom layout and the number of basins required, and we will return a quotation written to this checklist, with an approval drawing before production begins. Browse the wider range in Interior Fixtures or contact our team to start a specification.