Wall panels are deceptively difficult to ship. They arrive in sets, they are made to a specific size, and one damaged panel can stall the joinery sequence on site well beyond the day it was meant to take. If your project is specifying Santerson Glass & Glossy Panels for a villa, apartment or hospitality fit-out overseas, the order itself is only half the work. This guide walks through what to lock down before production starts, so the panels reach your site complete, undamaged and ready to install.

Start with the panel schedule, not the container

Glass and glossy panels in this range are configurable: finish, layout and dimensions can be specified for each space, and sizing is made to measure. That flexibility is the reason delivery planning has to begin on paper. Before any freight question is answered, your panel schedule should record, for every wall run:

  • The room and wall reference, matching the drawing set your installer is working from
  • Panel width, height and thickness as confirmed on the approved shop drawing
  • Finish and material selection, including any gloss or lacquer surface being compared against a sample
  • Edge, joint and trim details where panels meet doors, cabinetry or reveal trims
  • A panel mark number printed on both the drawing and the carton label

A schedule like this is what turns "a container of panels" into a deliverable that can be checked one wall at a time. It is also the document you will share when dimensions or specifications need to be re-confirmed for the project, and the reference your installer works from on site.

Confirm the specification before production opens

Once glass and high-gloss panels are cut, changes become expensive. Treat the pre-production sign-off as a hard gate, not a formality. At that point you should have:

  • Final room-by-room dimensions signed by the site team, not the design team alone
  • A physical or photographic finish reference both sides hold, so glossy surfaces are judged under comparable light
  • Written agreement on which openings, skirtings and reveals the panels butt up against
  • The order split decided: full set in one shipment, or phased by floor or building zone

If your project also includes cabinetry or wardrobe fronts in a similar surface, group those items on the same purchase order. SANTERSON works as a one-stop furniture and building materials supplier, so panels, joinery and fixtures can be coordinated against one drawing set and one delivery sequence instead of three separate suppliers working to their own timetables.

Choose the freight mode around your site programme

International freight for these orders moves by sea, air or rail. The practical decision usually comes down to what your site can receive and when:

Situation on siteWhat it usually means for the order
Full fit-out, panels needed together with joinery and fixturesConsolidated sea shipment, staged so wall finishes arrive after floors are protected but before the joinery sequence closes
Multi-storey or multi-building projectPhased containers released by zone, each with its own panel schedule and carton marks
Replacement or missing panels after installation has begunAir freight for a small set, planned against the production lead time rather than the shipping speed alone
Tight storage at the site or portSmaller, more frequent deliveries; confirm unloading access and lifting equipment in advance

Ask your supplier's logistics coordinator to map two or three delivery scenarios against your programme before you commit. A slightly slower sea routing that lands the panels in the right sequence is usually cheaper than an express shipment that arrives into a site that cannot receive it.

Specify the packaging and container loading, do not leave it to chance

Glass faces and glossy surfaces get damaged in two ways: impact at the edges, and surface marking where panels slide against each other. When you confirm the order, ask specifically for:

  • Edge protection on every panel, with corner boards on glass items
  • Interleaving and face-to-face packing so gloss surfaces do not rub in transit
  • Vertical racking or upright packing where the panel format suits it, rather than flat stacking under load
  • Carton marks that match your schedule numbers, with fragile and orientation markings on the outside
  • A packing list organised by room or zone, not just by carton number

The container loading plan matters as much as the packing. Panels are best loaded last and discharged first at the destination, kept clear of anything that can shift in transit. Confirm this in writing with whoever is doing the loading.

Get the shipping documents right the first time

Customs delays cost more than freight delays, because the container sits while someone chases a document. The shipment normally travels with commercial invoices, packing lists, certificates of origin and any import permits your country requires for the materials involved. Duty rates, Incoterms and clearance requirements differ by destination and change over time, so confirm the terms and duties for your specific order and port with your customs broker rather than relying on general guidance.

Two checks before the container sails save days later: that the packing list quantities reconcile exactly with the panel schedule, and that the Incoterm you agreed matches who is actually paying for inland delivery to site. If panels arrive short, a replacement set has to be re-manufactured to measure, so accuracy at this stage protects both your budget and your handover date.

Plan the receiving and installation sequence together

Panels should not be the first trade into a room or the last thing stacked in a corridor. Before discharge, agree:

  • A dry, covered storage area large enough to hold panels upright, with space to open cartons without blocking access
  • A receiving routine: count against the packing list by zone, inspect faces and edges while the packaging is still on, photograph any damage before signing
  • The installation order by room, so the first panels opened are the ones needed first
  • Who carries the panels to each floor and who clears offcuts and packaging

SANTERSON's service scope runs from design and production through logistics and door-to-door delivery to installation and after-sales support, with shipment tracking along the way. On a project order that continuity is useful: the team holding the drawing set also knows which cartons belong to which wall, which is what makes handover at site orderly.

Pre-shipment checklist

  • Panel schedule complete, with mark numbers and confirmed dimensions
  • Finish references approved and recorded on the order
  • Packaging specification agreed in writing, including interleaving and edge protection
  • Delivery phasing agreed against the site programme
  • Incoterms, duties and clearance documents confirmed with your broker for the destination port
  • Storage area, offloading equipment and installation sequence booked before discharge

Frequently asked questions

Can one shipment be split across several sites on the same project?

Yes, if the panel schedule is prepared by zone from the outset. Splitting happens at packing, so each carton set needs its own marks and its own line in the packing list. Decide this before production: retrofitting a split onto one batch of panels creates counting errors that only surface at handover.

What if a panel is damaged on arrival?

Record it while unpacking, with photographs against the original packaging, and reference the carton mark from your schedule. Because these panels are made to measure, a replacement goes back into production rather than coming off a shelf, so the practical question is how much float your programme allows. Ordering a few spare panels for high-traffic walls reduces that risk.

Should glass and glossy panels ship with the rest of the fit-out?

Usually, but not necessarily in the same container or the same release. Ordering together keeps drawings, finishes and delivery windows on one schedule; loading separately protects fragile faces from being packed against cabinetry and hardware.

Panel dimensions, finishes and technical performance depend on the configuration selected for each project — confirm these specifications with the SANTERSON project team before production. Import terms, duties and clearance requirements vary by destination and should be verified for your specific order.

Ready to plan the production and delivery sequence for your panels? Send your drawings and panel schedule to the SANTERSON project team, and we will map manufacturing, packaging and freight against your site programme.