A storage and display combination looks simple on a drawing — open niches, closed cabinets, a recess for the screen. The quotation is where that simplicity disappears. What you send in the request for quote decides whether the price you get back covers the wall you actually picture, or a bare set of boxes with everything interesting priced later.

SANTERSON manufactures these systems as made-to-measure built-ins. The Santerson Storage & Display Combo sits in the Media & TV Walls collection, and its finish, layout and dimensions are specified per project rather than chosen from a fixed size range. That one fact drives everything below: an RFQ for this product is really a request that someone price your design, so the more of the design you hand over, the closer the number will stay once production starts.

Start with the wall, not the product name

Quoting a collection title alone tells the factory nothing about the opening it has to fit. Send the room first.

  • The finished width and height of the wall run, plus floor-to-ceiling height if the design climbs that far — full-height work is built differently from a low sideboard with open shelving above it.
  • Depth, stated twice: overall carcass depth and clear depth behind any recessed panel or niche.
  • Where the wall stops — skirting, cornice, an adjacent doorway lining, a radiator recess, a switch plate that cannot move.
  • A site photo from each end of the run, and a sketch with dimensions written on it. A floor plan alone rarely shows what is happening vertically.
  • Whether the wall is straight or returns around a corner, and whether services run inside the build.

If your project also includes matching full height storage walls or a separate bedroom wall, send those elevations in the same enquiry. Repeat elements are where a single manufacturer earns their keep: one panel specification, one finish batch, one shipment.

Specify the layout bay by bay

A storage and display combination mixes open and closed bays. Decide what each bay holds, then write it down. Loose language such as "some open shelving" invites an assumption, and assumptions get re-drawn.

  • Number of open niches, their clear width and height, and the shelf depth you want displayed items to sit at.
  • Fixed versus adjustable shelving, and how much movement you expect over the life of the unit.
  • Closed cabinets: door type (hinged, sliding, lift-up), the direction each door travels, and whether handles are acceptable or you want a handleless, pull-free front.
  • Drawers — quantity, internal depth, and what goes in them. A drawer for glassware is specified differently from a drawer for blankets.
  • The screen recess: the display model or its mounting pattern and weight, plus how far the screen should sit back from the finished face of the panel.

Name the materials and finishes you expect

Panel substrate, edge treatment and surface finish are three separate decisions, and each one moves the price. The company's custom service covers bespoke material finishes and textures across woods, metals, engineered stone and laminates, so treat this as a genuine choice rather than a fixed palette.

  • Carcass material versus door or panel material — they do not have to match, and often should not.
  • Surface finish: veneer, lacquer, melamine, acrylic, or a wood-grain decorative panel carried across from the surrounding wall cladding.
  • Colour reference. Give an actual sample number or send a physical swatch, never a colour name alone.
  • Edge detail on visible shelves — a square edge and a wrapped or eased edge are different fabrications.
  • Any stone, sintered surface or marble used as a countertop or feature block, with its thickness and whether the direction of the veining matters to you.

Settle the screen and the electrics early

Electrical work is the most common source of late change on media walls. Decide before the quotation, not after.

  • Where power, data and aerial connections land, measured from a fixed corner — and whether they must stay reachable after installation.
  • Cable routes and cut-outs, including what hides the wiring for the screen, soundbar and any devices kept in closed bays.
  • Integrated lighting: which niches are lit, whether the source is concealed behind a profile or visible, and where the driver sits. Compare integrated LED media units with backlit feature walls if the glow is meant to be the design rather than a detail.
  • Ventilation for anything that gives off heat inside a closed bay.
  • Who supplies and connects the lighting on site, and which voltage standard applies at the destination.

Say how it will be installed

A made-to-measure wall system arrives as panels and carcasses. How they travel from a container to a finished wall changes what has to be engineered into them.

  • Country and delivery address, and whether the site takes a full container or needs smaller parcels.
  • Lift access, stair width, and any limit on panel length — a full-height panel that will not turn a landing is a different design.
  • Whether you want the manufacturer's installation and after-sales support, which the company lists as part of its project service, or whether a local contractor fits it. Say so plainly; packaging, fixing details and the drawing set all follow from that answer.
  • The substrate behind the wall. Plasterboard, masonry and timber stud take different fixings and different blocking.

What to attach to the enquiry

DocumentWhy it changes the price
Measured elevations of the wall, both directionsSets panel sizes and where visible joints fall
Plan showing depth, returns and obstructionsPrevents a carcass clashing with doors, switches or skirting
A schedule per bay — open, closed, drawer, nicheRemoves guesswork from shelf counts and ironmongery
Finish references and sample codesKeeps colour off the variation list later
Screen and device schedule with weights and mounting detailsDetermines backing structure, ventilation and cut-outs
Electrical layout showing sockets, data points and lightingCut-outs and drivers are fabricated in, not drilled on site
Delivery terms and who installsPackaging, bracing and fixing details depend on it

How the enquiry is handled

SANTERSON works from a design brief and a quotation with detail confirmation, then moves to production, shipment and follow-up; custom/OEM work, door-to-door logistics, installation and after-sales support are listed as part of that service. As a China-based manufacturer of built-in furniture and building materials supplied on international projects, they produce this category alongside cabinetry, wall panelling, doors, flooring and lighting — which is why related items are worth putting in one enquiry rather than three.

Send the project scope together with the room drawings through the contact page, and state the date you want the wall installed. A site date is what lets a factory work backwards through production, freight and customs instead of quoting lead time in the abstract.

Before you send: confirm that every number in the enquiry is a finished dimension rather than a structural opening, that each bay has a stated purpose, and that someone on your side owns the electrical layout. Those three checks remove most of the variation orders that follow a media wall quotation.

Dimensions, material selections, hardware, electrical specifications and delivery arrangements are confirmed for each project during the design and detail-confirmation stage; a figure agreed for one wall does not carry across to another.