Slim-frame French doors look simple on a drawing: two leaves, a run of glass, a narrow sightline. They are one of the quickest ways to bring daylight between a living room and a terrace, or between a master suite and a dressing area. The specification behind them is not simple. A single missing input, such as a floor finish that has not gone in yet or an out-of-square reveal, turns a made-to-order joinery item into a site problem.
Santerson Modern Slim Frame French Doors are made to measure, with material and finish options selected per project, so the completeness of your enquiry determines how accurate the quotation is and how cleanly the door fits. This guide sets out the measurements and project inputs we ask for, so that the opening, the door and the surrounding finishes all arrive at the same conclusion.
What the product actually is
This model sits in our Santerson Modern Slim Frame French Doors collection, within the wider Windows & Doors range. The product record describes it as designed for residential door projects, with finish, layout and dimensions specified to suit each space. Configuration includes made-to-measure sizing and material and finish options.
That wording changes how you should read the checklist below. Because the size is not fixed to a stock module, we are not testing whether your opening matches a catalogue number; we are building the leaf and frame around the opening you send us. Dimensions and selected specifications need confirming for each project before production starts.
The measurements that decide the job
Send the structural opening first, then the finish levels. The structural opening is the rough aperture in the wall: width, height and wall thickness, each taken at three points across the dimension (top, middle and bottom for width; left, centre and right for height). Three readings rather than one tell us whether the opening is square and whether the wall thickness is consistent, both of which affect how the frame is built and packed.
| Input | What we need from you | Why it changes the outcome |
|---|---|---|
| Structural opening | Width, height and wall thickness, each measured at three points | Exposes out-of-square openings and varying wall depths before they become site adjustments |
| Finished floor level | Whether the specified floor covering is already installed, and the build-up depth still to come | Sets the leaf height and whether a threshold or sill detail is required |
| Headroom above the opening | Clear distance from the finished ceiling to the head of the opening | Affects architrave, casing and any concealed frame detail |
| Leaf count and split | Two leaves, or one leaf plus a fixed panel, and which side carries the active leaf | Sets the meeting-stile detail, hinge positions and hardware set |
| Swing direction | Which way each leaf opens, and whether it must clear furniture, a stair nosing or a wall return | A wrong-hand leaf cannot be corrected once production has begun |
| Adjacent finishes | Skirting profile, wall covering, tile set-out and reveal depth on both faces | Decides how the frame lining is trimmed and where the architrave lands |
A practical note on floor finishes
The correction we see most often in enquiries is a height quoted from a bare slab. If screed, adhesive and a timber or stone finish still sit above that slab, a door ordered to the bare-slab height arrives too tall for the finished level. Where the finish level is not yet fixed, say so: we can show you the frame detail at two heights instead of committing to one.
The project inputs beyond dimensions
Dimensions get the door into the opening. These inputs decide whether it reads correctly against the rest of the interior:
- Finish and material selection. Veneer, lacquer, laminate and painted options behave differently under light and wear. Send the finish reference from the joinery package rather than a colour name, because the same word means different things between suppliers.
- Glazing intention. Clear, frosted or reeded glass changes privacy, how much daylight passes through, and the visual weight of the elevation. If the doors separate a hallway from a study, that is a functional decision and not only an aesthetic one.
- Hardware set. Handles, hinges and any closer should be chosen with leaf weight and required action in mind, and coordinated with the ironmongery scheduled elsewhere in the project.
- Interface with neighbouring joinery. Where the doors sit beside Santerson Decorative Interior Doors, matching reveal depth, architrave profile and finish across both items is what stops a run of openings looking like three different trades.
- Alternative door types in the same schedule. Openings that cannot carry a swing are usually solved with Santerson Wooden Sliding Doors or a pocket arrangement. Flag these early so one schedule covers every opening in the project.
How your information moves through our process
Our cooperation steps run from project brief and design proposal, to quotation and detail confirmation, then production, shipment and follow-up. Your measurements and inputs are used in that second step, where drawings are checked against the opening before anything is cut. Where a project needs it, our interior design service covers space layout planning, material selection and product specification, plus design coordination with drawings, production coordination and on-site guidance.
Doors travel with the rest of the package under our logistics and door-to-door delivery service: freight forwarding by sea, air or rail, packaging and container loading, customs paperwork and shipment tracking. For villa and hospitality projects ordering doors alongside cabinetry, wardrobes, flooring and lighting, consolidating them in one production and shipping cycle removes the coordination overhead of chasing several suppliers against a single programme.
Specifications here follow the product record: made-to-measure sizing with material and finish options, confirmed per project. We do not publish fixed dimensions, glass thickness or performance ratings for this model, because those values are set by your opening and your selection. Request them as part of the quotation.
An enquiry template you can copy
Send the following in one message and we can return drawings rather than more questions:
- Project location, building type, and the room each set of doors serves
- Number of sets, with a marked-up plan or elevation for each opening
- Three-point structural dimensions plus wall thickness for every opening
- Finished floor level status, and the build-up depth still to be installed
- Leaf split, swing direction, and hardware preference
- Finish reference and glazing choice, with any matching joinery item named
- Delivery location, and how the goods will be received on site
Browse the full Windows and Doors range to see how slim-frame French doors sit alongside hinged, sliding, folding and concealed options, then send your openings across for a made-to-measure proposal.
Preparing a door schedule for a villa or hospitality fit-out? Send the marked-up drawings and three-point dimensions, and we will confirm the specification for Santerson Modern Slim Frame French Doors against each opening before production.