A wardrobe quotation is only as accurate as the information behind it. Two rooms with the same floor plan can produce very different prices once the wall construction, ceiling height and internal layout are fixed. This guide sets out what a manufacturer needs from you to price Hanging Modular Wardrobes properly, and what usually causes a quote to change after the first draft.

Why hanging modular wardrobes are quoted differently from freestanding ones

A hanging (wall-mounted) modular wardrobe carries its load on the wall rather than on a floor cabinet or plinth. That single decision changes several cost drivers at once:

  • The supporting wall must be able to take the weight of the carcass, doors and contents, so the wall build-up matters as much as the wardrobe itself.
  • Modules are set out to suit the actual run, including corners, skirting, architraves, switches and services that a standard size cannot absorb.
  • Doors, drawer banks and open bays are specified module by module, so an internal layout changes the price even when the external size does not.
  • Site levels and floor heights vary along a run, which is why made-to-measure sizing rather than a fixed catalogue width is the normal route for project work.

SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, and our Modular Wardrobes collection is specified with project-specific dimensions, finishes and layouts. Send the details below and a quotation can be issued against real conditions instead of assumptions.

1. Room dimensions and wall conditions

Send measured drawings or a dimensioned sketch, not just a floor area. For a hanging system we need:

  • Total run length at the top and bottom of the wall, plus the height to be filled — full ceiling height or a set-down for cornice, skirting or services.
  • The construction material of the supporting wall (masonry, stud partition, concrete, timber frame) and whether it can carry a wall-hung unit. Where a partition cannot, we tell you before pricing reinforcement or a floor-supported alternative.
  • Positions of doors, windows, radiators, sockets, switches, air-conditioning outlets, downlights and any pipes or trunking that the carcass has to avoid or scribe around.
  • Floor finish and its thickness, since a floating floor, tile bed or screed changes the setting-out line.
  • Room squareness. Out-of-plumb walls are common in refurbished villas and older apartments; we need to know whether scribing, a filler panel or a set-back is required.
Practical tip: measure each wall at three points — left, centre, right — and give us the smallest and largest figures. A 10 mm difference across a run is normal in site conditions and decides whether panels are cut on site or finished in the factory.

2. Internal layout: what each module has to hold

Internal fittings are quoted per item, so describe how the wardrobe will actually be used rather than asking for "standard internals". Tell us the mix of:

  • Single and double hanging rails, and the number of tiers on each.
  • Adjustable shelving for folded clothes, bags and boxes, with shelf spacing where you have a preference.
  • Drawer Focused Modular Wardrobes arrangements — drawer count, whether shallow sock and accessory trays or deep linen drawers are needed, and any soft-close requirement.
  • Open display bays and lit niches for frequently used items, as in Open Modular Wardrobes.
  • Specialist items: trouser pull-outs, tie and jewellery trays, ironing stations, laundry hampers, safe boxes, mirror panels or a vanity end.
  • Long-item zones for coats and dresses, and whether the rail should sit at full height or drop down.

Where one room needs several arrangements — closed carcasses at one end, open bays in the middle — Combination Modular Wardrobes let us price each block separately, which makes it easier to trim a budget without losing the design.

3. Doors, fronts and hardware

Door type is often the largest single line in the quotation, so confirm it early:

  • Hinged, sliding or bi-fold doors, and the clearance each needs to operate. Sliding fronts need track depth and headroom; hinged doors need swing clearance from the bed or opposite wall.
  • Front material and finish: matte or high-gloss lacquer, acrylic, melamine, wood veneer, glass (clear, frosted, bronze, smoked or ribbed), mirror, or an aluminium-framed combination.
  • Edge and profile detail — handleless routed groove, integrated profile handle, or visible knobs and pulls.
  • Glass specification where used: thickness, toughening, tint and whether the panel is framed or rebated.
  • Hinge and runner brand or grade if your project has a specified hardware schedule.

4. Materials, finish standards and visual references

Give us the finish by name where you have it, and attach photographs, a mood board or a sample reference when you do not. Useful details are:

  • Carcass board type and thickness, plus edge banding colour and whether edges are visible.
  • Front finish with sheen level, since "white gloss" and "matte white" read very differently on site.
  • Colour system reference (RAL, Pantone or a manufacturer's sample code) for anything other than a standard stock colour.
  • Grain direction and matching requirements where wardrobes sit next to doors, wall panelling or vanity units from the same order.
  • Any wear expectation, for example a shared rental apartment, a hotel guest room or a family villa, which affects the finish we recommend.

Our Custom & OEM Service covers bespoke finishes and textures, so a specified colour or veneer can be matched rather than substituted. Confirm the exact option for your project before production starts.

5. Quantities, rooms and site programme

Pricing moves with volume and with how many different layouts are involved. Please state:

Detail to provideWhy the supplier needs it
Number of wardrobe runs and the rooms they sit inRepeated identical layouts cost less than one-off sizes for every room.
Unit type: villa, apartment, serviced apartment, hotel guest roomDuty level, hardware grade and finish durability are specified accordingly.
Required delivery date on site and the installation windowProduction slots and freight mode are planned backwards from these dates.
Whether other joinery is in the same order (vanities, wardrobes, panelling, doors)Combined orders simplify finish matching and shipment planning.
Order value preference: ex-works, FOB or deliveredDetermines what we price for packing and freight arrangements.

6. Documentation that shortens the process

The faster route to a firm price is to send everything in one enquiry:

  • Room elevations or CAD/PDF drawings with dimensions, plus the floor plan for context.
  • Photographs of each wall, taken square-on and from both ends, showing skirting, cornice and any services.
  • A finish schedule or sample references, including the colours used elsewhere in the room.
  • An internal fitting list per wardrobe, marked with drawer counts and rail lengths.
  • The project address, delivery access notes (lift size, stair width, parking restrictions) and the receiving party.

If drawings are not ready, our Interior Design Services team can work from measurements and photographs to produce layout proposals and 3D renderings before the quotation is finalised. That step usually removes the change orders that appear when a quote is issued against guesswork.

What a complete quotation should show you

Before you compare prices, check that each supplier has itemised the same scope. A usable quotation lists:

  • Module-by-module sizes and contents, not one lump sum for "wardrobe".
  • Carcass and front materials, edge treatment and finish references.
  • Hardware schedule: hinges, runners, handles, hanging rail fittings, any lighting.
  • Non-standard works: scribing panels, corner units, cut-outs for services, reinforcement of a partition.
  • Packing specification, freight basis and the documents supplied with the shipment.
  • What is included on site — installation, snagging and spare parts — and what is not.

SANTERSON handles production through Logistics & Door-to-Door Delivery and Installation & After-sales Support, so the same quotation can cover the wardrobes, their shipment and the fitting stage. Confirm the scope, lead time and warranty terms applicable to your project in writing before you place the order.

Send us your wardrobe enquiry

Include elevations or measurements, wall construction, door type, finish references, drawer and rail counts, quantities and your required site date. We will confirm feasibility for a hanging installation and return an itemised quotation against those details.

Contact: SANTERSON — phone / WhatsApp +86-13928214007 · Email santerson@qq.com · Enquiry form