Integrated TV panels look simple on a rendering: a screen set into a clean run of joinery, cables hidden, everything flush. They are one of the easiest items in a project to get wrong, because the panel, the wall behind it and the services inside that wall all have to agree before anything is manufactured. The notes below follow how our Built-in Furniture work is actually run — drawing stage, production stage, delivery and on-site installation — so the media wall arrives on site matching what the drawings show.
In short: an integrated TV panel is a made-to-measure product. Finish, layout and dimensions are specified per project, so the drawing pack and the site survey have to be closed out before production starts. Confirm screen model, mounting method, ventilation route and service positions with us at the design stage rather than after ordering.
What the product actually is, and what that means for coordination
Our Santerson Integrated TV Panels sit in the Media & TV Walls collection alongside Sliding Panel TV Systems, Full Height Media Walls and Backlit Feature Walls. The published listings describe these as configurable systems for residential wall projects: finish, layout and dimensions are set to suit each space. That wording matters when you read a drawing — the panel is not a fixed catalogue size that the wall adapts to. The wall condition, the screen you have chosen and the storage layout around it define the panel.
Two consequences follow immediately:
- Anything fixed and built-in has to be dimensionally confirmed before manufacturing begins. A 10 mm error in a recess is recoverable on site; it is not recoverable once a made-to-measure panel has been machined and finished.
- The panel carries services. Power, screen signal, network cabling and any integrated lighting are decisions that sit between the joinery detail and the electrical detail, and both drawings have to show the same positions.
The drawing stage: what we need from your design pack
Our interior design service covers space layout planning, concept design, furniture layouts and 3D visual renderings, and project design coordination that spans drawings, production coordination and on-site guidance. For a media wall, the useful input is not an inspirational image — it is a set of coordinated sheets. Before we price and produce, please send:
| Drawing / information | What we check against it |
| Elevation of the wall, with finished floor level and ceiling line | Overall panel height and width, whether the run is floor-fixed or wall-hung, skirting and reveal treatment |
| Screen schedule: make, model, screen size, mounting method | Recess opening, bracket type, load path, clearance for the bracket arms |
| Electrical setting-out drawing | Socket, data and switch positions relative to the recess; where integrated lighting circuits terminate |
| Finish schedule with sample references | Panel material and finish, edge treatment, how the media wall meets adjacent Custom Niche Paneling or wall panelling |
| Storage layout and internal fit-out | Shelf spans, drawer heights, door swing direction, whether equipment needs ventilation |
| Structural note on the substrate | Whether the wall is masonry, framed studwork or a timber battened backing — this decides fixing method and bracket support |
Where the media wall continues into other built-in elements — Integrated Media Storage in an adjacent bedroom, or a full-height run in a living room — send the elevations together rather than one at a time. Splitting them across separate enquiries is the most common cause of finish and level mismatches between rooms.
The site survey: measurements that change after the drawing is signed
A design dimension and an as-built dimension are rarely identical, especially in renovation work. Before production dimensions are locked, we ask for a site check of:
- Floor level and wall plumb. A run of panels that is 20 mm out of level along its length needs either a scribed shadow gap or a packed substrate. Decide which, and show it on the drawing.
- Finished floor build-up. If screed, underfloor heating or a new floor finish is still to go in, the panel height must be dimensioned from the finished level, not the slab.
- Position of existing studs, beams and services. Screen brackets and heavy fixed units need solid support. Where the recess cuts through a stud, the builder's strengthening works should be shown on the setting-out drawing and confirmed as complete before installation.
- Door and window openings, and room access. Panel lengths are limited by what fits through stairwells, lifts and doorways on delivery day. This is a logistics question that has to be answered at the design stage, not when the crates arrive.
- Ceiling detail. A flush top reveal against a plasterboard ceiling behaves differently from a panel that stops below a shadow gap. Both are workable; they need different site preparation.
For villa and apartment projects we handle, the practical sequence is: builder completes first-fix electrics and any structural strengthening, we confirm as-built dimensions against your drawings, then production is released. If your team cannot provide a surveyor on site, tell us at quotation stage and we will work from your drawings plus photographs and a marked-up measurement sheet — with the caveat that critical dimensions stay with your builder.
Services behind the panel: power, signal, ventilation and lighting
The screen recess is where three trades meet. Left to separate drawings, they clash. Three items are worth closing out in writing:
- Sockets and data behind the screen. Position them clear of the bracket zone and inside any service void, so the screen can sit close to the wall. Confirm how many sockets and whether a separate spur is required — that decision belongs to your electrician, not to the joinery drawing.
- Ventilation for equipment in closed compartments. If consoles, players or a receiver sit behind doors, the compartment needs a ventilation route decided before the doors are made. Where integrated lighting is specified, as in Integrated LED Media Units, confirm driver location and access for replacement.
- Cable management path. A recess with no route to the equipment compartment means surface-trunked cables on day one. Cut the opening in the panel, not in the finished wall afterwards.
Our listings for these configurable systems carry the same instruction: selected dimensions, materials, hardware and electrical options are confirmed per project. We do not assume a screen model or an electrical arrangement on your behalf — we need your specification to detail around it.
Production, customisation and tolerances
Our custom and OEM service covers bespoke furniture design and prototyping, bespoke material finishes and textures, flexible minimum order quantities, and brand customisation. For a media wall this is where the practical choices get made: veneer, lacquer, melamine or glass front panels; handleless or profile-pull drawer fronts; whether doors are hinged, sliding or lift-up. Our Custom & OEM page mentions material families such as wood, metals, engineered stone and laminates, so a media wall can be matched to the kitchen and wardrobe package in the same project rather than ordered separately.
Two coordination points during production:
- Finish matching across packages. If the media wall, Floating TV Units and cabinetry come from different batches or different suppliers, expect visible differences in wood grain and sheen. Ordering them as one package with a single finish reference removes that argument.
- Component lead times. Glass fronts, hardware and integrated lighting can run on schedules that differ from the carcass work. Tell us your site programme at quotation stage and we sequence production against it, so nothing arrives long before the wall is ready for it.
Delivery to site: packaging, access and what the receiving team needs to know
Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, with documents such as commercial invoices, packing lists and certificates of origin. For a media wall order the site team should receive, in advance:
- The crate list and piece weights, so access routes and lifting arrangements are planned rather than improvised.
- Storage instructions — panels stay flat, dry and unopened until the room is closed in and wet trades have finished.
- A named receiving contact. Panels damaged in an unplanned on-site move are avoidable, and the packing sequence tells you which crate to open first.
Import terms, duties, Incoterms, insurance and transit arrangements for Australian projects are confirmed case by case with your project team; we do not publish a single blanket service level for every destination.
Installation sequence and handover checks
Our installation and after-sales service covers on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. The order of work below is the sequence we ask site teams to follow:
- Confirm as-built dimensions against the production drawings before any crate is opened.
- Check the substrate: fixing zones, strengthening works behind the screen recess, and that electrics are tested and energised.
- Install support framing or battens where the design calls for them, levelled to the finished line rather than to the existing wall.
- Fit carcasses and panels, set door alignment, then hang the screen on the agreed bracket.
- Connect and test equipment, check ventilation paths are clear, and record snags with your site supervisor.
The handover record agreed with the client covers panel alignment, door and drawer operation, hardware function, lighting circuits, and confirmation that the recess matches the approved drawing. Keep it with your project documentation — it is what later maintenance or spare-part requests are referenced against.
Common coordination failures, and how to avoid them
- Screen chosen after the panel is made. Recess size, bracket support and ventilation all depend on the screen. Lock the model before production release.
- Electrics set out from a design dimension instead of an as-built one. Sockets land behind the bracket or outside the service void.
- Media wall ordered separately from other joinery. Finish and level mismatches between rooms follow.
- No ventilation decision for closed equipment compartments. Retrofitting air paths into a finished panel is visible work.
- Access not checked before shipping. Long panels that cannot reach the room become a site problem nobody can solve with a saw.
A short pre-production checklist
- Elevation and section of the media wall, dimensioned from finished floor level
- Screen make, model and mounting method confirmed in writing
- Electrical setting-out drawing with socket, data and lighting positions
- Substrate and strengthening note signed off by the builder
- Finish schedule with sample reference matched to the wider joinery package
- As-built site measurement recorded against the drawings
- Delivery access route, crate list and receiving contact confirmed
- Ventilation route and driver/hardware access agreed for closed compartments
Questions we are asked most often
Can you supply the media wall together with the rest of the built-in joinery?
Yes. Media walls, storage walls and cabinetry can be ordered as one package so that finishes, levels and hardware are consistent across rooms. Send all relevant elevations at quotation stage.
Do you supply the screen and electrical work?
No. We detail the panel around the screen and services your team specifies, and we confirm recess, bracket support, cable routes and ventilation against your drawings. Supply and connection of the screen and electrical installation stay with your supplier and electrician.
What if the site dimensions differ from our drawings?
Tell us before production release. Made-to-measure panels can be adjusted at that point; once machining has started, changes become rework. Where the difference is discovered on delivery, installation resolves it on site where possible, and we record what was changed.
If you have drawings for a media wall or an integrated TV panel and want them checked against our production requirements before ordering, send the elevation, the screen schedule and the electrical setting-out to us through the contact page and we will come back with the coordination points that need closing out.