A stacked laundry unit looks like a small item on a fixture schedule, yet it touches cabinet dimensions, appliance selection, services, ventilation and finishing trades. When the design team and the buying team specify it from different drawings, that is where variations, site rework and delayed handovers begin. This guide sets out what both sides should agree on before an order for stacked laundry units is placed.

Why the Stacked Laundry Unit Deserves a Joint Review

In residential and mixed-use bathroom work, the laundry area is usually one of the last zones to be resolved. The architect has fixed the room, the plumber has routed the standpipes, and the joiner is asked to make something fit. A stacked unit sits at that intersection: it carries appliances, it forms part of the visible cabinetry line, and it often shares a wall with a bathroom or a corridor where noise and access matter.

Our Laundry Integration range — including Stacked Laundry Units, WasherDryer Cabinets and Compact Laundry Solutions — is made to measure for each project, with material, finish and layout chosen per space. That flexibility only pays off when the designer and the buyer confirm the same information at the same time. Below are the six points we ask both parties to sign off together.

1. The Dimension Set: Who Owns Which Number

The most common disagreement is over which dimensions are fixed and which can move. A designer's elevation usually shows a neat cabinet face; a buyer's quotation often lists an appliance envelope. Those two numbers rarely match, because the cabinet has to absorb wall tolerances, skirting, door swings and clearance for doors and drawers to open fully.

Before production, both sides should confirm one coordinated set:

  • Finished internal dimensions of the recess, taken on site after wall finishes, not from the structural drawing alone
  • The appliance footprint and door-swing direction that will actually be installed
  • Total height available, including any adjustable feet, bench top or overhead cupboard above the unit
  • Depth allowance for hoses, vents and the service gap behind the appliances
  • Whether the unit is framed into a recess, standing free, or aligned with adjacent cabinetry runs

Our workshop builds to made-to-measure sizing, so we work from the coordinated set rather than a nominal module. If the designer and buyer send different numbers, we stop and ask — that pause costs a day, while a wrong panel costs a site visit.

2. Appliance Selection Before Cabinetry Detailing

Stacked units are built around appliances, not the other way round. A change of washer or dryer model after the cabinet has been detailed can affect the cut-out, the shelf bearing, the position of the power outlet and whether a door can open past the frame.

What we need from the buying side, and what the design side should show on the drawing:

Item to confirmDesign team responsibilityBuying team responsibility
Appliance model and dimensionsShow the appliance type and orientation in the layoutConfirm the exact models, or leave a generic envelope agreed by both
Ventilation routeLocate the vent path and any required clearance on the services drawingConfirm whether the dryer is vented or condenser type
Power and water pointsSet outlet and stop-cock positions relative to the cabinetConfirm appliance cable and hose lengths if known
Loading heightCheck that the stacked configuration suits the users of the dwellingFlag any accessibility requirement in the unit mix

If appliances have not been chosen yet, say so on the drawing and specify a generic envelope. A cabinet made to an assumed appliance is the single largest source of variation orders in this category.

3. Finish, Material and How the Unit Reads in the Space

In villas and apartment projects the laundry is frequently visible from a hallway, an entry or an open-plan area. Designers should state whether the unit is meant to blend with adjacent joinery or read as a separate piece. Buyers then need to know which finish code they are pricing, because "matching the bathroom vanity" is not a specification.

Points to align on:

  • Door style and profile — flat, handled or handleless — consistent with the rest of the cabinetry package
  • Colour or veneer reference, taken from an approved sample rather than a screen image
  • Interior finish: whether cabinet interiors are exposed when doors stand open in a shared area
  • Hardware quality and opening action for a high-frequency family or rental use
  • Edge and surface suitability for a damp room, stated explicitly in the specification

Where the laundry shares a wall with bathroom joinery, we can carry the same material and finish across both. Coordinating that at quotation stage avoids a second small order later, which is always more expensive per unit than the main package.

4. Layout Logic: Storage Around the Machines

A stacked unit is rarely useful on its own. The value comes from what surrounds it: hanging rail for line drying, a fold-out bench for sorting, hampers below, and shelving for detergents at a safe height. Designers should specify the storage logic; buyers should confirm what the end users of the dwelling actually need.

For tighter layouts we work from the same collection: Compact Laundry Solutions for narrow bathrooms, and Laundry & Storage Combo where the machines and household storage have to share one run. Where a full-height store is possible, Multi Function Tall Cabinets keep bulky items out of the low cupboards.

Detail worth agreeing early: pull-out elements such as Pull Out Laundry Hampers need runner clearance and a floor line that is level. That decision affects the tiler's setting-out, so it should be on the drawing before the floor is laid.

5. Tolerances, Sequencing and Site Conditions

Made-to-measure cabinetry only performs when site conditions are known at the right moment. Both teams should agree who confirms these items and by when:

  • Final floor and wall finish levels, so heights are measured off the finished surface
  • Which trade sets the appliances and connects services — the cabinet maker, the plumber or the fitter
  • Whether the unit is delivered before or after the appliances arrive on site
  • Access route for delivery: stairwells, lifts and door widths in apartments can limit panel sizes
  • Protection arrangements if the laundry is used as a site facility during construction

We would rather receive one combined instruction covering these points than two partial ones. Where a project uses our design coordination service, drawings and production information travel together with on-site guidance, which reduces the number of questions reaching the trades.

6. What Changes When Several Units Repeat Across a Project

In an apartment or villa-group project, one approved type can repeat across many dwellings, sometimes with mirrored layouts. Here the alignment task shifts from single-unit detail to type control:

  • One approved reference sample per finish, signed by the designer and recorded by the buyer
  • A clear list of permitted variants — left-hand and right-hand versions, alternative bench heights — rather than bespoke detailing per dwelling
  • Consistent appliance envelope across the unit mix, so one cabinet type serves several layouts
  • A stated batching and delivery order that matches the construction sequence

Where minimum order quantities matter, this is also the point at which flexible ordering should be raised, because a late variant added to an approved type is usually priced differently from the original run.

A Short Pre-Order Checklist for Both Sides

Before we release a stacked laundry unit to production, we ask for confirmation of the following. If the designer and buyer can tick these together in one meeting, most of the variation risk disappears:

  • On-site measured opening dimensions, after finishes
  • Appliance models or an agreed generic envelope, with venting method
  • Approved finish reference and door style matching adjacent joinery
  • Storage layout: hanging, bench, hamper and shelving positions
  • Services set-out for power, water and drainage relative to the cabinet
  • Delivery route, batching and installation responsibility

The pattern we see on well-run projects: one combined specification sheet covering the cabinet and the appliance, issued once and signed by both sides. One page of alignment saves a site visit.

Next Steps

If you are detailing a bathroom or laundry package and want the stacked unit confirmed against drawings rather than nominal modules, send us the layout, the finish reference and the appliance information. We will confirm what can be built, where tolerances need holding, and what has to be fixed on site before measurement.

Send us your laundry layout for a made-to-measure review

SANTERSON manufactures custom cabinetry and bathroom fixtures for villa, residential and hospitality projects, with design coordination, production and door-to-door delivery handled as one package. Share drawings and finish references and we will return a buildable specification for your stacked laundry units.