A quotation for glass hinged wardrobes usually arrives as a spreadsheet of dimensions, board codes and hardware lines. Two proposals that look almost identical on paper can behave very differently once the doors go on site. The gap sits in what the document leaves out. The review sequence below follows the order in which those details actually matter on a residential wardrobe package: drawings first, then specification, then commercial terms.
1. Read the Drawings Before You Read the Price
Glass hinged wardrobes are made to measure, with sizing, layout and finish set against each space rather than picked from fixed catalogue widths. If a proposal carries only overall width, height and depth, there is not enough information to compare it with anything else. Ask for elevations of every wardrobe run, a plan showing door swing arcs against beds, side tables and skirting, and a section showing how the top of the unit meets the ceiling line.
Three drawing details reveal more about the manufacturer behind a proposal than the price does:
- Clear opening width per door. Hinged doors need an unobstructed arc. A layout that reads well in elevation can fail once a handle, arch or cornice is fixed in place.
- Floor levels marked against the finished floor. Glass-fronted doors are set with a consistent gap to the completed floor. If the drawing assumes a structural slab level instead, every door in the package needs re-adjusting after the flooring trade has finished.
- Interior layout drawn, not described. Shelf heights, hanging zones, drawer positions and any internal lighting should appear on the drawing with dimensions. A note reading "internal layout to standard" is an open item, not a specification.
2. Check That the Glass Specification Is Written Out
"Glass door" is a category, not a specification. A proposal you can actually assess states what the glass is, how it is edged and how it is mounted. Look for these items as separate lines:
| Item | What should be stated | Why it matters |
|---|---|---|
| Glass type and colour | Clear, frosted, bronze or smoked, plus the finish of any frame | Tinted and textured glass respond to light very differently; a sample on a data sheet is not the same as your bedroom lighting |
| Glass make-up | Whether each leaf is toughened, laminated or a combined build, with the configuration written out | Determines handling, edge work and where handles and hinges can be cut |
| Edge treatment | Polished edges, arris condition, and whether any edge is left unworked | On glass-fronted doors the edges are a visible finish item, not just a production detail |
| Mounting method | Hinge type, how it fixes into the leaf, and the revealed or overlapped gap at the carcass | The fixing detail decides whether a damaged leaf can be replaced without taking the whole door off site |
| Cut-out and handle positions | Handles, hinge positions and any internal light switch marked on the elevation | Glass that is cut and then toughened to a drawing cannot be reworked afterwards |
Where a package mixes glass types across rooms, ask for each variant as its own priced line. Frosted glass wardrobes in a bedroom and bronze glass wardrobes in a dressing room are separate production items, and one combined price hides that.
3. Compare Hardware by Name, Not by Quantity
Hinges, handles and stays are where a low quotation quietly becomes an expensive one. A line reading "hinges, 12 nos" cannot be compared with one that names the hinge series, states the load rating per leaf, gives the number of hinges assumed per door and says whether soft-close is included.
- Hinge loading per leaf. Glass leaves are heavier than a panel of similar thickness. Confirm the rated load per hinge and how many hinges are allowed for each door height.
- Hardware fixed into glass versus into frame. An aluminium frame glass wardrobe carries its hardware in the extrusion; a frameless leaf carries it directly. The two conditions have different adjustment and replacement logic.
- Spare parts after handover. Ask which hardware items can be bought locally later and which have to come from the manufacturer. For an overseas buyer this is the most useful sentence in the whole proposal.
4. Read the Carcass Specification as Carefully as the Doors
The doors attract the attention; the carcass decides whether the run stays square and flat years later. Check board type and thickness, edge banding material, how back panels are fixed, and whether adjustable shelving sits on metal pegs or plastic ones. Confirm the finish of internal faces too — a glass-fronted wardrobe is looked at with its doors open and light inside.
Then check how the proposal handles site conditions: scribe or filler panels against out-of-plumb walls, allowance for skirting, an integrated cornice or a shadow gap at the ceiling, and the method for joining adjacent runs. If your joinery schedule covers other built-in work, ask whether the carcass finish and edge detail match it.
5. Test Every Proposal Against the Same Room Data
Before you treat two quotations as comparable, give each manufacturer the same three inputs and see what comes back:
- Finished-floor level for each room, plus floor-to-ceiling heights taken at several points along the wall.
- A list of obstructions: air-conditioning outlets, downlights, arches, skirting depth, radiators and the door furniture on adjacent doors.
- Your storage programme — long hanging, double hanging, drawer counts, shelf quantities — written as requirements rather than left to the supplier's standard layout.
A manufacturer who can work from that information returns revised drawings with a price. One who cannot returns the same price with a note that site verification will follow later. That difference shows up in the programme, not in the margin.
6. Commercial Terms Worth Reading Line by Line
- What the price covers. Packaging to container standard, delivery terms, installation, and whether site protection is inside or outside the scope.
- Measurement responsibility. Who measured, when, and what happens if a wall moves after the order is placed. Cross-border packages need this settled before production, not at handover.
- Variation rates. A priced rate for changed internal layouts beats a promise to discuss changes later.
- Damage in transit. Glass-fronted doors are the highest-risk item in any furniture shipment. Confirm how breakages are documented on arrival and what replacement lead time applies.
- Payment against milestones. Drawing approval, sample or first-article sign-off, pre-shipment inspection, delivery.
Warranty periods, response times and installer arrangements differ by project and destination. Treat figures you read in marketing material as the opening position for a written agreement, not as confirmed commitments.
Seven Questions to Send Back to the Manufacturer
- Which drawing revision is this price based on, and what is its date?
- What is the glass make-up, colour and edge treatment for each door type?
- Which hinge is specified, rated to what load per leaf, and how many per door?
- Are internal layouts dimensioned, and are they inside the quoted price?
- Who verifies finished-floor levels and wall plumb before production?
- What is the replacement route and lead time for a damaged glass leaf after delivery?
- Which hardware items stay available locally after handover?
Collecting those answers costs a day and removes most disputes before they reach the site.
Where One Manufacturer Makes the Comparison Easier
Most wardrobe packages do not travel alone. They sit alongside kitchen cabinetry, vanities, media walls, doors and wall panelling, and each separate supplier adds an interface to manage — levels, finishes, delivery windows and who answers for a snag. Coordinating the joinery with one manufacturer shortens that list.
Our wardrobes are produced per project: dimensions, internal layout, glass type and finish are specified against your drawings rather than chosen from standard widths. The same approach runs across hinged, sliding, corner and walk-in wardrobe ranges, so a bedroom in glass hinged wardrobes and a dressing room in glass walk-in wardrobes share one carcass detail and one finish schedule. Design coordination, production, packing and container loading, door-to-door delivery and installation guidance run through a single project contact — which is what clients furnishing from overseas tell us matters most when joinery arrives in stages.
Send us your wardrobe drawings
Share room dimensions, finished-floor levels and your storage programme. We will return elevations with an itemised specification — glass make-up, named hardware and dimensioned internal layout included — so that every proposal you hold can be compared on the same basis.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiry page