Metallic lacquer cabinet doors are the part of a kitchen order that shows every handling mistake. A dent in a particleboard side panel can be trimmed and hidden inside a carcass; a scratch or pressure mark across a metallic lacquer front is visible from across the room the moment the crate is opened on site.

Before you release a cabinet order, ask your supplier to put the packaging plan in writing: how each door is protected, how panels are packed and separated, how the load is arranged inside the container, what the cartons are marked with, and what happens if damage appears on arrival. The five sections below set out exactly what to confirm and what to ask for.

Why metallic lacquer fronts need a different packing plan

A lacquered door is a substrate plus a multi-layer coating that has been sprayed, cured and polished. Two properties drive the packing requirements:

  • The finish cures hard but is not impact-resistant. A hard coating resists everyday cleaning and normal use, yet a point load — a bolt head, a corner of another panel, a strap biting into a stack — leaves a mark that cannot be blended out on site. Touch-up pens level the colour, not the sheen.
  • A metallic sheen reveals surface marks more readily than a flat colour. Metallic and high-gloss surfaces reflect light in a way that exposes fine scratches, swirl marks and pressure bruising. The same handling that is acceptable on a textured matte melamine front can be visibly wrong on a metallic lacquer front of the same size.

There is also a colour issue worth settling at order stage. On our site you will find Metallic Lacquer Cabinets listed under the lacquer kitchen collection and Metallic High Gloss Cabinets under the high gloss collection, alongside matte, textured and two-tone lacquer variants. The naming groups the product by its door style and sheen rather than by a fixed paint formula, so treat the written specification you approve — substrate, construction, colour reference and sheen level — as the thing being manufactured and packed, not the page title.

Confirm 1: how each door is protected

Ask for a description of the face protection, not a promise that goods are "well packed". Useful specifics:

  • Interleaving or edge protection on the decorated faces, with the protective layer specified by material and thickness.
  • Whether doors travel face-to-face with protection between them, or flat and separated. Face-to-face without a barrier is how transfer scratches happen.
  • Corner and edge protection on tall doors, where the weakest point is the vertical edge rather than the field.
  • Whether the protection is compatible with the sheen being shipped — some films leave residue or shine marks on high-gloss surfaces and must be removed within a stated window.

Because these cabinets are made to measure, door sizes vary from project to project. A packing standard written for one panel size does not automatically cover a full-height pantry door or an oversized island panel, so ask the supplier to confirm protection at your largest and smallest dimensions.

Confirm 2: how carcasses and panels are packed

Kitchens travel as flat packs, and the packing unit matters as much as the outer carton. Confirm:

  • Panel thickness and construction of the carton or crate, and whether the packaging is designed for ocean transit rather than a domestic leg.
  • How panels are separated inside the bundle — separators, corner blocks, edge protection — and whether heavy hardware travels loose or is fixed so it cannot shift against a decorated face.
  • Whether bundles are strapped in a way that spreads load, since a narrow strap across a stack concentrates pressure on a small area of the top panel.
  • Moisture protection for board-based components on a sea leg, and whether the packing list states bundle weights so your site team can plan unloading.

Our logistics service covers packaging and container loading as part of the shipment arrangement, which means the loading sequence is decided at our end. That is an advantage only if your requirements — site access, unloading method, delivery order — are given before the container is packed.

Confirm 3: how the container is loaded and sequenced

For a whole-apartment or villa fit-out, cabinets rarely travel alone. They share the container with interior fixtures, wall panels, flooring, lighting and loose furniture. Loading order decides what you open first and what gets moved twice.

Item to confirmWhy it matters
Loading sequence against your delivery orderCabinets unloaded last get handled through an already busy site. Sequence the load to match how you will actually work on site.
Which goods share a containerHeavy joinery stacked against a lacquered door bundle is where damage transfers between unrelated line items.
Blocking, bracing and dunnageA container that shifts at sea arrives with crushed carton corners. Ask what bracing is used and whether voids are filled.
Container type and fill levelPart-filled containers need more bracing than a full one. Confirm the plan rather than assuming the load will hold itself.

Confirm 4: carton marking, packing list and identification

Most "packaging failures" on site are actually labelling failures. A bundle that simply reads "Kitchen – 1 of 6" cannot be routed to the right apartment without opening it.

  • Ask for markings that carry room or unit codes, bundle numbers within a count, and gross weight — matched line by line to the packing list you receive before dispatch.
  • Agree who produces the labels. If your project uses its own room schedule, ask for the supplier's cartons to carry your codes so site teams never decode two numbering systems at once.
  • Request photographs of the packed bundles and of the container as it is loaded. They are the reference point if a claim follows, and they cost nothing at dispatch stage.
  • Confirm the customs paperwork — commercial invoice, packing list, certificate of origin — reflects the same bundle counts as the physical cartons. Mismatched counts stall clearance and extend the time goods sit in transit.

Confirm 5: inspection, claims and replacement

Settle this before dispatch, while there is still something to change:

  • What the supplier will accept as evidence — photographs of unopened cartons, opened cartons, and the damaged panel against a plain background.
  • The window in which damage must be reported after discharge, and who inspects on site.
  • How replacement doors are handled: whether only the affected fronts are remade, how they travel, and how the replacement is packed differently from the original shipment if the cause was packing itself.
  • Whether installation support covers the snag list. Our installation and after-sales service includes on-site installation, inspection and snags, plus spare parts and replacement; the applicable terms are confirmed per project rather than assumed.

Cargo insurance is available as an option in our shipping arrangements. Cover limits, Incoterms and who bears risk at each leg should be written into your order confirmation — marketing descriptions of a service are not a substitute for the agreed terms.

A short packaging checklist to attach to your enquiry

  • Face protection material and thickness for metallic lacquer and high gloss doors — stated, not assumed.
  • Protection confirmed at your largest and smallest door dimensions.
  • Carton or crate specification suitable for ocean transit; bundle weights on the packing list.
  • Loading sequence agreed against your delivery order and site access.
  • Carton marking in your room or unit codes, matching the packing list line by line.
  • Photographs of packed bundles and of container loading sent before dispatch.
  • Damage reporting window, evidence standard and replacement route agreed in writing.

As a one-stop furniture and building materials supplier, we manufacture cabinetry to project dimensions and ship it alongside the rest of the fit-out, so the packing plan is something we can adjust to your site rather than apply as a fixed standard. Send us the drawings, your room schedule and your delivery sequence, and the packaging and loading plan should be reviewed with them — not after the container has been packed.

Confirm the packing plan before production

Send your cabinet schedule, room codes and site access notes to our team. We will confirm door protection, carton specification, loading sequence and marking with your quotation, so nothing about how the cabinets travel is left to assumption.