An arched wardrobe is one of the few storage pieces where the drawing matters more than the catalogue number. Before you send an enquiry, collect six things: a wall that has been measured, a layout that reflects how you actually store clothes, a finish direction, door and clearance details, a delivery route, and a list of questions about tolerance and installation. With those in hand, a quotation round becomes a comparison instead of a guessing game.
Why Arched Paneled Wardrobes Are Harder to Specify Than Flat-Front Ones
A flat-front wardrobe can usually be described in three numbers. An arched paneled unit adds geometry that changes how the carcass is built and how the doors sit. The curve of the arch has a radius, and that radius determines whether the panel mouldings can be pressed or must be bent and finished by hand. The crown line where the arch meets the wall is rarely straight in an existing room, so the top of the unit needs to follow whatever the building actually gives you.
Panel style also drives price more than most buyers expect. Our Arched Paneled Wardrobes sit within the Classic Paneled Wardrobes family, alongside raised, recessed and decorative moulded panel doors. A shallow recessed panel and a deep decorative moulding can use different amounts of hand finishing on the same carcass. When you enquire, name the panel style you want rather than saying "classic style", because that phrase means something different to every workshop.
1. Wall Dimensions Taken the Right Way
Send more than a width and a height. For each wall, provide:
- Width at floor level, at mid-height and at ceiling level — old buildings are rarely square.
- Floor-to-ceiling height at both ends and in the middle, plus the height of any skirting, cornice or architrave you want the unit to pass through or sit against.
- Depth available, measured from the finished wall face, including anything that projects: radiators, switches, door handles, light switches on the return.
- Position and depth of recesses, columns, beams, box gutters and services such as air-conditioning returns.
- Photographs of the wall from straight on and from both sides, with a tape measure visible in at least one shot.
If the room is still under construction, say so. A unit set out to a bare-concrete dimension will not fit after plasterboard and flooring are installed. Give us the finish line, not the structural line.
2. A Storage Layout Based on How You Live in the Room
Tell us what goes in the wardrobe before we tell you what fits. Long hanging for coats and dresses, double hanging rails for shirts, drawers for knitwear, open shelves for folded linen, a section for luggage, space for an ironing board. Note anything unusual: a safe, a trouser pull, jewellery trays, a mirror on the door interior, lighting inside the carcass.
Then tell us who uses it. A shared bedroom needs two hanging zones and separate drawer banks. A guest room can be simpler and cheaper. Where you want open display next to closed storage — niches with lighting, for instance — mention it now, because an arched niche and an arched wardrobe door should share one radius to look deliberate.
3. Finish Direction, With Samples if the Colour Matters
Choose a direction before the first quotation: painted panel doors in a solid colour, wood-grain veneer, melamine laminate, or a two-tone combination of a timber body with painted doors. Each behaves differently under an arched moulding — a painted finish shows the profile of the moulding best, while a figured veneer can lose its pattern across a curve.
If the wardrobe must match existing joinery, send a physical sample or the make and code of the existing finish, and say which room it is in and how much daylight that room gets. Screens lie about warm neutrals. Where an exact match matters, ask for a finish sample before production rather than agreeing to a colour name in an email.
4. Doors, Hardware and the Clearance They Need
| Question | Why it changes the quotation |
|---|---|
| Hinged or sliding? | Hinged doors need swing clearance in front of the unit; sliding doors need a track and lose a few centimetres of opening on each bay. |
| How many bays, and how wide is each door? | Very wide panel doors sag over time and need different hinges and support. |
| Handle style or push-open? | Handles project into the room; a handleless front changes the reveal between panels. |
| Full-height to the ceiling, or a topped-off box with a filler? | Ceiling-height units in an older building need scribed fillers where the arch meets an uneven line. |
| Interior lighting? | Requires a driver position, a cable route and a switch or sensor decided before the carcass is drilled. |
5. Delivery Route and Site Conditions
Built-in wardrobes are made to measure, which means the components have to get through the door they are destined for. Before we quote, confirm:
- The largest panel size that will fit the lift, stairwell or corridor on site.
- Whether the unit arrives as full-height panels or as a knock-down package assembled on site.
- Who installs it: your builder, your own fitter, or our team. Our one-stop service covers installation and after-sales support alongside production, so tell us early which parts of that you want.
- Your target on-site date, working backwards from it. Production is made-to-order, so the practical sequence is measurement, drawing approval, then production.
For an overseas project, add the delivery terms you intend to buy — door-to-door or port-only — and the access conditions at the receiving address. Our logistics and door-to-door delivery service handles freight documentation and container loading, but the last few metres are decided by your site.
6. The Questions Worth Asking Us Directly
- What radius will the arch actually be at the size you have quoted me, and can I see a photograph of a unit already built to it?
- Which board and moulding construction do you use for the arched door, and how is the curve finished — pressed, bent, or solid timber?
- What tolerance do you build in for an out-of-square wall, and who supplies the scribe on site?
- Is the price quoted per linear metre, per unit, or per component line, and what is excluded?
- What is included in packing, and how are glass or mirrored panels protected?
- If a panel arrives damaged, what is the replacement route and who covers freight on the replacement?
A Simple Enquiry Checklist
Photographs of the wall; three-point measurements for width, height and depth; a note of obstructions and finish lines; the storage layout you want, roomed by room; the panel style and finish direction; door type and hardware preference; who installs; target site date; delivery terms. Attach a floor plan if you have one.
Send all of that in one message and you will normally receive a drawing and an itemised quotation rather than a string of follow-up questions.
What Happens After You Send the Information
SANTERSON has manufactured furniture and building materials for project work since 2008, including villa and hospitality fit-outs where joinery has to match across several rooms. For a wardrobe enquiry we work from your measurements to a layout drawing, confirm the panel style, finish and interior specification with you, then release the unit to production once the drawing is approved. That approval step is the moment to fix the arch radius and every drawer height — changes after it cost both time and money.
The same approach covers the rest of the room. Arched wardrobes often sit beside arched niches, integrated vanities and wall panelling, and those elements share materials and profiles; our arched niche and full-house custom wall cabinet project shows how one radius can carry through display shelving, a full-height wardrobe and a vanity. Specifying them together keeps the curves consistent and usually simplifies the delivery.
Dimensions, panel profiles, finishes and interior fittings are made to order and confirmed per project. Prices and lead times are quoted after drawings are received.