Stone and marble wall panels are among the heaviest, most fragile and most specification-sensitive items on a project bill of materials. This guide walks through how a project order for Santerson Stone & Marble Panels moves from a set of shop drawings to a delivered crate on site — what you need to confirm before production starts, how the panels are prepared for export, which documents travel with the shipment, and how to plan the receiving side so the panels arrive ready to install.

Why Stone and Marble Panels Need Their Own Delivery Plan

Santerson Stone & Marble Panels are made to measure: sizing, material and finish are specified per project, and the layout is tailored to each space. That flexibility is exactly what makes the logistics different from shipping standard furniture.

Three characteristics drive the delivery plan:

  • Weight and brittleness. Stone and marble slabs are heavy in relation to their area, and they fail at the edges and corners. Handling sequence matters more than distance.
  • Project-specific sizing. A made-to-measure panel that arrives damaged cannot be swapped from stock — it has to be re-manufactured and re-shipped, which is why protection and inspection are planned before the panels leave the factory.
  • Layout dependency. Because the layout is designed for a specific space, missing or damaged pieces stall the whole wall cladding installation rather than one room of it.

For these reasons we treat stone and marble panel orders as their own shipment line in the project schedule, separate from cabinetry, loose furniture and other lighter categories that can share a container without the same handling requirements.

Before Production: What We Confirm With Your Team

International delivery planning starts at the specification stage, not at the packing stage. The following confirmations are made and signed off before panel production is released:

  • Final dimensions and setting-out drawings. Panel sizes are taken from approved site measurements for each wall, including openings, corners and any transitions to wall panel systems, doors or joinery. Confirm dimensions and the selected specification for every project before cutting.
  • Material and finish selection. The chosen stone or marble type, surface finish and edge detail are fixed at order confirmation, since re-orders follow the same specification.
  • Piece-by-piece numbering. Every panel is marked to match a numbered setting-out drawing, so the installation team knows which crate and which position each piece belongs to. This is the single most useful thing you can do to keep an import site moving.
  • Panel thickness and substrate build-up. Thickness affects both total weight per square metre and how the panels are crated and supported in transit, so it is settled at specification stage.
  • Site access at destination. Floor level, lift dimensions, stair widths, turning radii and whether a crane or hoist is available all determine crate sizes. A panel that fits the wall may not fit the service lift.
If your project also includes stone or marble countertops and basins from the Stone & Marble Surfaces range, tell us at the same time. Similar material, similar protection standards — but very different crate geometry — so batching them on one shipment is possible while packing them identically is not.

Choosing a Shipping Route and Incoterms

Santerson arranges global freight forwarding by sea, air and rail, with door-to-door delivery as part of our logistics service. For stone and marble panels the practical choice is almost always sea freight in a container, because weight and volume make air freight uneconomic for full wall areas.

Points to settle with your procurement or logistics contact:

  • Container type and loading method. Panels are loaded on end A-frames or flat on dunnage depending on size and thickness, then blocked, braced and damped so nothing shifts in transit. Sharing a container with loose furniture is possible only when the stowage plan protects the panels first.
  • Incoterms. Decide whether you want door-to-door delivery to site or delivery to port, which determines who books inland haulage and who carries the risk at each handover.
  • Cargo insurance. Insurance options are available for project shipments. Confirm the declared value basis and what breakage is covered before the container is loaded.
  • Shipment sequencing. If the wall cladding must be installed before flooring or final finishes, the panel shipment needs to sail earlier than the rest of the fit-out package.

Export Packing for Stone and Marble Panels

Our packing and container loading service covers the export-grade preparation these panels require. In practice that means:

  • Crating. Timber cases and A-frame stands built for the panel sizes on the setting-out drawing, with faces separated and cushioned so slabs do not contact each other.
  • Edge and corner protection. The most common damage points are protected individually rather than relying on the case alone.
  • Moisture control. Desiccant and moisture-barrier lining for long sea passages, which matters for some stone types and for any bonded or laminated construction.
  • Crate labelling. Crate numbers keyed to the numbered setting-out drawings, plus handling orientation and weight markings for the receiving crew.
  • Loading plan. Panels are loaded so they are not crushed by lighter goods stacked against them, with bracing checked before the doors close.

Documentation That Travels With the Shipment

We handle the export paperwork and support you on the import side. A stone and marble panel shipment normally moves with:

DocumentWhat it covers
Commercial invoiceDeclared values and product descriptions for customs valuation.
Packing listCrate-by-crate contents, weights and dimensions, matched to the panel numbering.
Bill of ladingCarrier receipt and title to the goods; states container and seal numbers.
Certificate of originConfirms where the goods were manufactured, where the destination country requires it.
Import permits or declarationsHandled by your clearing agent where the destination country requires them; we supply the supporting export documents.

Import requirements differ by country and can change, so the exact document set and any duties, taxes or restricted-material rules should be confirmed with your customs broker for the specific destination port. We provide the export-side documents and coordinate with your broker; we do not advise on your local import classification.

Receiving the Shipment on Site

Most avoidable panel damage happens after the container arrives, so give your site team a short written receiving procedure:

  • Check seals and containers before unloading. Photograph any damaged container, shifted crates or broken seals before goods are moved — this is what supports an insurance claim.
  • Unload with the right equipment. Suction lifters or mechanical handling gear for large slabs; manual handling only for smaller pieces.
  • Store flat and dry, upright correctly. Panels stay in their crates until needed, on level dunnage, away from trade traffic. Do not lean slabs against walls at an angle.
  • Inspect against the packing list and setting-out drawings. Confirm crate counts and panel numbers per wall before signing off, so a shortage or breakage is reported while the claim window is open.
  • Report issues with photos and crate numbers. Clear photographic evidence plus the crate and panel number lets us arrange re-manufacture of the affected pieces quickly.

Installation Handover and After-sales Support

Once the panels are on site, installation and inspection follow the agreed setting-out drawings. Our installation and after-sales support service covers on-site installation guidance, inspection and snag lists, plus spare parts and replacement arrangements for project orders. Warranty terms, response times and what is covered vary by order, so the specific terms are confirmed in writing with your project contact rather than assumed from marketing material.

For a coordinated fit-out, panel delivery usually sits inside a wider programme. The Turnkey Interior Project Solutions service runs consultation, design and planning, production, logistics, installation and after-sales as one workflow, which means the stone wall shipment is scheduled against the same plan as cabinetry, flooring and loose furniture instead of being arranged separately at the end.

A Practical Timeline for Buyers

StageWhat happensYour action
Specification sign-offPanel sizes, material, finish and numbering fixed; dimensions confirmed against site measurements.Approve setting-out drawings and provide site access details.
ProductionMade-to-measure panels cut, finished and quality-checked.Confirm any last layout changes before cutting starts.
Packing and bookingCrating, labelling, container loading plan, freight booking.Agree Incoterms, insurance basis and delivery point.
TransitSea or rail movement with shipment tracking.Pre-clear import requirements with your broker.
Arrival and inspectionUnloading, crate check against packing list, damage report if any.Have handling equipment and storage ready on site.
Installation and handoverCladding installed to the numbered drawings; snag list closed out.Book your installation crew around delivery, not after it.

Frequently Asked Questions

Can stone and marble panels share a container with other products?

Yes, when the stowage plan protects them first. In practice we keep panel weight and bracing requirements ahead of lighter goods in the loading sequence, so sharing never means panels take the load.

What happens if a panel arrives damaged?

Report it with photographs and the crate plus panel number from the packing list. Because panels are made to measure, replacement pieces are re-manufactured to the same approved specification; the fastest resolution comes from a clear, well-documented report at the point of receipt.

Do you deliver all the way to site?

Door-to-door delivery is part of our logistics service, covering freight forwarding, customs paperwork, packing and container loading, shipment tracking and delivery. Port-only delivery can also be arranged if you prefer to handle inland haulage locally.

What do I need to give you to get a delivery quotation?

The approved setting-out drawings with panel sizes and quantities, the selected material and finish, the destination address or port, your preferred Incoterms, and site access details such as floor level and lift dimensions. With those we can plan packing, route and cost in one pass.

Send us your panel schedule

If you have setting-out drawings for a stone or marble wall package, share them with our project team along with the destination and delivery point. We will confirm packing, routing and door-to-door options for that specific order — and number every panel so installation matches delivery. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com, or use the contact page.