A swim spa proposal that looks complete on the first read is often incomplete where it matters: what is actually supplied, what the site has to provide, and who carries each risk once the unit leaves the factory. If your project team has received an offer for the Outdoor Swim Spa WS-115FⅨ as part of a hotel, resort, clubhouse or villa development, this checklist shows what to verify line by line before you sign, and which omissions tend to turn into change orders later.
Start with the scope statement, not the price
Commercial swim spa proposals are usually quoted against a catalogue model. The catalogue entry describes a configuration; it does not describe your building. Before comparing numbers between suppliers, put each offer's scope into the same three columns: what is included as standard, what is listed as an option with a price, and what is silent. The silent column is where disputes begin.
For this model the catalogue lists a footprint of 5000 × 2200 × 1250 mm, one control system, one swim training system, one water pump, one filter pump, 24 jets, four LED lights and a total power figure of 8.05 kW. Treat those as the reference configuration in the catalogue, not as a guaranteed delivery specification. A quotation should restate them for your specific order, because options and site conditions change what arrives on the truck.
Questions the proposal must answer explicitly
- Which model code is quoted, exactly as written, including any suffix? Suffixes in this range generally mark a different shell length or equipment set, and they change both price and the electrical load.
- Is the swim training system included, optional, or omitted in your configuration? The catalogue shows it on some variants of this series and not on others.
- Which pumps are quoted, how many, and for what duty? Pump count varies across the range and drives both running cost and noise.
- Is heating included, or is a heat pump offered as an option? An unheated spa in a cool-climate clubhouse is a very different operating proposition from a heated one.
- What water treatment is supplied — ozone only, or ozone plus UV sterilization as an optional add-on?
- Is filtration the standard filter pump or an optional sand filtration system? This changes the maintenance routine your operations team will run.
- Are insulation and steps quoted, and are they priced per unit or bundled invisibly into the base price?
Compare like for like across the range
Buyers frequently receive two proposals with different model codes for the same room and assume the difference is cosmetic. In this series it usually is not: shell length, pump count, lighting count and total power all move between variants. A shorter variant of the same family can carry the same jet count in a smaller basin, while a longer variant may drop the swim training system and add pumps instead.
A useful sanity check is to line up two or three candidate models against your actual programme — lap swimming for guests, hydrotherapy seating, a children's supervision sightline, or purely a wellness amenity. Then ask the supplier to justify why the quoted model fits that programme. If the answer is only "this is our best seller", the specification was not written for your project.
| Item to compare | Why it matters commercially |
|---|---|
| Shell dimensions and depth | Determines the plant room, deck surround, structural bearing and whether the unit fits the approved drawings at all. |
| Total power (kW) | Drives the supply size, distribution board, cable route and the operating cost your facilities team will be held to. |
| Jet count and jet type | Defines the hydrotherapy experience being sold to guests or residents, and the pump duty behind it. |
| Swim training system present or absent | If lap swimming is in the marketing material, this is the item that has to be on the quotation. |
| Lighting quantity | Ambience and night-time safety; often quietly reduced between variants. |
| Filtration and sterilisation method | Sets consumables, cleaning frequency and how the unit performs under high guest turnover. |
Check the electrical and structural assumptions
The catalogue power figure is a starting point for coordination, not an engineering instruction. Ask your MEP consultant to confirm the quoted load against the actual configuration ordered, including any options such as a heat pump or additional pumps, and against the local supply available at the building. Then confirm three practical items in writing:
- The isolator, protection device and cable size expected at the spa end, and who supplies them — supplier or local contractor.
- Whether the control system is factory-mounted and pre-wired, or whether site wiring by a local licensed electrician is required for commissioning.
- The slab, pedestal or frame bearing arrangement for a filled basin. Water plus structure plus occupants is a heavy load; the supplier's installation drawing should state it clearly enough for your structural engineer to sign off.
A proposal that attaches dimensioned installation drawings, an electrical schedule and a lifting/access note is usually from a supplier who has delivered these units abroad before. A proposal that attaches only a product brochure page is asking your team to solve those problems later, at your cost.
Price the delivery and installation path, not just the unit
For an overseas project the unit price is one line in a longer chain. Ask the supplier to state, in the same document, how the spa reaches your site and who does what on arrival. A furniture logistics and door-to-door delivery service covers freight mode choice, packaging and container loading, customs paperwork and tracking — useful when the swim spa ships alongside outdoor furniture, lighting and other fit-out items rather than as a separate consignment with separate incoterms.
Confirm these specifics for your project rather than accepting general statements:
- Incoterms and the named place of delivery — port, or the actual site address.
- Packaging method and whether the shell is protected against cracking in transit and in storage before installation.
- Container type and whether the unit can reach the site through the intended access route and lift, if it is an upper-level terrace or rooftop installation.
- Who performs installation and commissioning, and what installation and after-sales support covers in practice: attendance, snag list, spare parts availability and the warranty period with its exclusions.
- Which consumables and wear items — filters, jet seals, lamp modules — are stocked, and how a replacement reaches your site if one fails during peak season.
Decide whether a standard model is even the right answer
Some commercial settings do not suit a rectangular catalogue shell: an irregular terrace, a spa precinct with a curved feature wall, or a resort layout where the water feature has to read as architecture rather than equipment. In those cases ask for a customized shape outdoor spa instead of forcing a standard model into the plan. Custom work changes the timeline and the approval process, so raise it at concept stage, not after the room is drawn.
Where the swim spa is one element of a wider wellness or outdoor programme — loungers, cabanas, poolside dining, paving, wall finishes — it is usually easier to coordinate as part of turnkey interior project solutions, with one party accountable for the schedule across trades. As a supplier of both furniture and building materials, SANTERSON can carry that coordination role for hospitality and villa projects, which removes the interface risk between several unconnected vendors.
Run the proposal past your operations team
The procurement decision is rarely overturned on aesthetics; it gets overturned in year two of operation. Before award, put the specification in front of whoever will run the facility and ask three questions: can we maintain this with our current staffing, are the consumables available locally or only from the supplier, and what happens when a component fails out of season?
Write the answers into the contract as measurable commitments — spare parts lead time, response window, commissioning attendance, warranty scope. Marketing claims about fast response are worth nothing until they appear in the document you can enforce.
Frequently asked questions
Is the 8.05 kW figure in the catalogue the final electrical load for my installation?
No. It is the total power shown for that model's catalogue configuration. Options such as a heat pump, additional pumps or extra lighting change the load, so the final figure must be confirmed against the ordered configuration and reviewed by your MEP consultant.
Should we compare suppliers on jet count?
Jet count alone is a weak comparator, because several models in this range share a similar jet total while differing in basin length, pump duty and whether a swim training system is fitted. Compare the full equipment list against your programme instead.
When should we specify a custom shape rather than a catalogue model?
At concept design. Custom geometry affects structural design, waterproofing detail, access for installation and the production schedule, so requesting it after the room is fixed normally means redesign and delay.
What is the single most common gap in an overseas swim spa proposal?
Silence on responsibility at site: who supplies the isolator and cabling, who lifts and sets the unit, who commissions it, and who holds the warranty when installation was carried out by a local contractor. Get that split stated in writing before award.
If you want a second opinion on an existing quotation, or a proposal written against your drawings rather than a catalogue page, send the room dimensions, the intended use and the available electrical supply to SANTERSON and ask for a specification that states every included and excluded item.