A matte acrylic kitchen front reads soft and flat to the eye, shows no fingerprint sheen, and suits handleless, minimalist layouts. That is exactly why project buyers ask for it by name. The gap between "we want matte acrylic" and a firm price, however, is information: door construction, substrate, colour reference, box material, hardware and the exact opening dimensions all change what a factory can quote.
This guide sets out what to send when you request a quotation for matte acrylic cabinets, and how each item shortens the round trips between your team and the factory. It applies whether you are fitting out one apartment or a villa package with several room sets.
What actually drives the price of matte acrylic cabinetry
Acrylic is a door-surface specification, not a whole cabinet. A quotation splits into parts that are priced separately, and buyers who understand the split compare offers fairly:
- The door panel. Substrate (typically an MDF-type board), the acrylic surface layer, and whether the edges are wrapped or machined to a continuous finish. Edge treatment is where matte fronts look either sharp or tired after a year of daily use.
- The carcase. Box material and thickness, edge banding colour, back-panel fixing and whether the box matches the door brand or is supplied as a standard matching range.
- Hardware. Hinge brand and closing action, drawer runners and load rating, handleless profile or push-to-open mechanism, integrated handles.
- Layout complexity. Straight runs price predictably per linear metre; tall pantry units, curved ends, angled corners, appliance housings and integrated lighting all add fabrication work.
- Made-to-measure sizing. Ours is standard on this range — each run is built to the dimensions you confirm rather than cut down from a fixed module. Non-rectangular walls and shallow recesses still need extra detailing, and that is where the price moves.
Because of that split, an early figure based only on "matte acrylic, grey, 10 metres" is a budget indication. A binding number needs drawings. Send the drawings earlier and you save a revision cycle.
Information to prepare before you send the enquiry
You do not need a finished design package to start. The list below is what we ask for, in the order it usually becomes available:
- Floor plan or a measured sketch of the kitchen. Wall lengths, ceiling height, window sill and head heights, door swings, and the position of water supply, waste outlets and power points. Keep the plumbing and electrical positions marked; cabinet widths depend on them. A separate services drawing from your engineer is welcome if one exists.
- Appliance schedule. Built-in oven, hob type and extraction route, dishwasher, fridge-freezer dimensions, microwave housing. Appliance sizes set cabinet widths, so they should be fixed before the layout is finalised.
- Layout preference. Straight run, L-shaped, U-shaped or with an island, plus whether you want tall units, a breakfast pantry or open display niches.
- Colour and sheen reference. A RAL code, a paint chip, a supplier board reference or a photograph of an existing front. Matte acrylic colours shift noticeably between samples, so a physical reference is safer than a screen image.
- Quantity and site context. Number of kitchens, room type (owner-occupied, rental unit, hotel suite), and country of delivery.
- Target programme. Site completion date rather than "as soon as possible". Production planning follows the site date.
The specification sheet we build the quotation from
Once the layout is agreed, the quotation is written against a specification sheet. Confirming these lines in your first message removes most of the back-and-forth:
| Item | What to state |
|---|---|
| Door surface | Matte acrylic, and whether the same finish is required for tall units, pantry doors and drawer fronts so the sheen matches across the room. |
| Substrate and thickness | Board type and door thickness; note any local fire or moisture requirement for the project. |
| Edge detail | Wrapped or continuous edge, and the edge colour relative to the face (matching or contrasting). |
| Carcase | Board material, thickness, edge banding, and internal finish on visible box interiors. |
| Hardware | Hinge and runner brand, soft-close requirement, load rating for drawers, handleless profile or push-to-open. |
| Internal fitout | Drawer packs versus shelves, pull-out corner units, pantry racking, cutlery organisation, waste bins. |
| Integrated items | Cabinet lighting, glass display fronts, integrated appliances, scribes and fillers. |
| Dimensions | Made-to-measure sizes per run, with a note on finished floor level and ceiling height. |
| Delivery terms | Destination port or site address, and whether you need door-to-door delivery arranged. |
Where the specification is not fixed, ask for two priced options rather than one. A matte acrylic front paired with a standard carcase and a mid-range hardware set gives a working baseline; upgrading runners or adding integrated lighting can then be costed as a variation instead of reopening the whole quote.
How the quotation process runs at SANTERSON
We manufacture matte acrylic cabinets in-house as part of our acrylic kitchen cabinet range, so the quotation comes from the factory rather than a reseller margin. The steps follow the process described on our custom furniture manufacturer service page:
- Brief and layout. We review your plan, appliance schedule and references, then produce a cabinet layout with elevations. Where the project needs it, we add 3D renderings so the finish can be judged in context.
- Sample and colour confirmation. For matte acrylic fronts we advise checking physical samples against your reference before sign-off, since sheen level and colour depth under site lighting differ from a catalogue image.
- Quotation and detail confirmation. Pricing is issued against the approved layout and specification sheet, line by line, so substitutions are visible rather than buried in a lump sum.
- Production and inspection. Cabinets enter production once drawings and finishes are signed off. Inspection points are agreed with the project team before shipping.
- Packing and shipment. Panels are packed for export with container loading planned around site sequence, with freight by sea, air or rail and customs paperwork arranged when required — see logistics and door-to-door delivery.
- Installation support and after-sales. On-site guidance, snag inspection, spare parts and maintenance support follow the handover — see installation and after-sales support.
For whole-apartment or villa packages, cabinetry is usually quoted alongside wardrobes, doors and other joinery in one package. Grouping those trades reduces duplicated site measurement and keeps finishes consistent across the rooms they share.
What the quotation covers once it arrives
A clear quotation states what is included and what is arranged separately, so nothing appears as a surprise after order confirmation:
- Cabinetry lines. Each run, unit type and finish listed separately, with made-to-measure dimensions shown against the drawing number they belong to.
- Hardware schedule. Brands and models named, with soft-close and load ratings stated rather than described as "premium".
- Packing and freight. Export packing specification, carton count and volume, then the freight option you selected — sea, air or rail — with customs documents prepared where required.
- Site support. What installation guidance covers, which snag inspection applies at handover, and how spare fronts and hardware are supplied later.
If the same project also needs wardrobes, interior doors, bathroom vanities or flooring, ask for those on a separate priced section of the same order. One combined site measurement and one production schedule keep dimensions consistent where materials meet — for instance where a tall pantry front adjoins a matte acrylic wardrobe in the same colour reference, or where cabinetry meets wall panelling and skirting.
Questions worth asking before you accept an offer
- Is the matte acrylic on both faces and edges of the door, or only the front face? Rear-face laminate colour affects how the door looks when open.
- Which hardware brand and model are named in the quote, and is the same range available in your country for future spares?
- Are scribes, fillers, plinth and toe-kick included, or measured on site later?
- How are tall units and appliance housings supported, and what maximum shelf load applies?
- What is the packing specification and the container-loading plan for your site sequence?
- Which items are covered if a panel is damaged in transit, and how quickly can a replacement front be produced?
A short checklist for your first message
- Plan or measured sketch, with ceiling height and services positions
- Appliance schedule with dimensions
- Colour reference (RAL, chip or physical sample posted to us)
- Quantity of kitchens and destination country
- Site completion date
- Whether you want a layout proposal from us before pricing
What to expect in the first reply
Send those six items and the first response is a layout with an itemised quotation rather than a list of questions. If you are also considering fronts in another finish — high gloss, lacquer, melamine or veneer — mention it at the same time, since matching hardware and carcases across finishes is cheaper to plan up front than to reconcile later.
Send your drawings for a quotation
Share your kitchen plan, appliance list and colour reference with our project team. We reply with a cabinet layout and an itemised quotation against the specification you confirm, including production, packing and delivery to your site.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquiry page: Contact SANTERSON