A wardrobe enquiry that arrives with a room dimension, a door type and a finish sample moves far faster than one that simply asks for "white wardrobes". Here is the shortlist of information worth having in hand before you start talking to a manufacturer about made-to-measure acrylic cabinetry.
Start with the opening, not the wardrobe
Before anyone can draw a carcass, someone has to measure the hole it has to fit into. For a built-in wardrobe that means the width, height and depth of the recess, plus the floor-to-ceiling variation across that run. Rooms are rarely square, and in older villas and renovated apartments the difference between one end of a wall and the other can be several centimetres. Note which walls you have measured, whether skirting boards or architraves stay in place, and where the ceiling, lighting and air-conditioning grilles sit.
Also record what is already in the wall: switch plates, power points, downlights, radiator pipes and structural columns. A door that swings into a socket is a very cheap problem at the drawing stage and an expensive one on site.
Decide how the wardrobe will be used before you decide how it looks
The interior layout drives the price more than the door finish does, so it is worth settling first. Walk through what actually has to live inside: hanging clothes long or short, drawers for folded items, shelves for boxes, a safe, an ironing station, a full-length mirror on the door inner face. Then note who uses the room — a shared bedroom needs different circulation from a single-occupancy one, and a guest suite rarely needs the drawer bank that a family bedroom does.
If the space is awkward, say so plainly in the enquiry. A corner run, a sloped ceiling under a roof line, or a wardrobe that has to wrap past a doorway all change the internal modules. Our White Acrylic Wardrobes are built to project-specific dimensions and layouts rather than to a fixed catalogue size, which is exactly why the room information matters more than the model number.
Name the door system you want
Door type is the single most consequential decision in a wardrobe enquiry, because it dictates clearance, hardware and how much of the opening you can actually reach.
| Door system | What to check before asking for a quote |
|---|---|
| Hinged (swing) | Clear swing path in front of the wardrobe; handles or handleless profile; whether doors align with adjacent wall panelling |
| Sliding | Track depth, ceiling height above the opening, and how much of the interior is reachable when a panel is parked |
| Folding / bi-fold | Number of panels, hinge load on tall doors, threshold detail at the floor |
| Open or framed insert | Whether the surrounding carcass should match joinery elsewhere in the room |
If you have not chosen yet, send a photograph of the room and say so. A manufacturer who works on custom projects will usually propose two layouts with different door systems and explain the trade-off, which is a better basis for a decision than a brochure.
Be specific about "white"
White acrylic is not one finish. A high-gloss surface reflects lamps, windows and every dust particle in the room; a matte surface absorbs light and reads softer next to timber flooring or fabric headboards. In a bedroom with strong daylight and dark walls, gloss can be exactly right; in a hallway lit from one side, it can be unwelcome.
State the sheen you want, then ask for a physical sample rather than trusting a screen. Send the paint or flooring codes used elsewhere in the project so the white can be matched to them. If the design calls for more than one surface, say which doors should match and which should contrast — a two-tone acrylic wardrobe with a lighter field and darker frame, or an acrylic-and-glass combination for a display section, both need the boundary between finishes defined on the drawing, not left to the workshop.
Ask what sits behind the acrylic face: the substrate, edge treatment and how the panel behaves at a cut-out for a handle or a light. Those details decide whether an edge chips in transit and whether the door still closes flush after a season of heating and cooling.
Fix the interface details
Most on-site complaints about custom wardrobes are not about the doors. They are about what happens where the wardrobe meets everything else. Have answers ready for:
- Flooring — does the wardrobe sit on the finished floor, and who lays it last?
- Ceiling and cornices — is the carcass scribed to the ceiling or capped with a pelmet?
- Lighting — interior lights, motion switches, cable routes, and where the transformer hides.
- Skirting, architraves and adjacent joinery — removed, copied or butted against.
- Doors and hardware — brand or profile you want, soft-close on drawers or doors, handleless grooves.
A practical test for your enquiry
If a manufacturer can produce a dimensioned elevation from your message alone, you have given enough. If they come back with three open questions about the room, the missing information is what would have caused the problem later.
Set out how the order will travel and land
Custom joinery crosses oceans more often than it used to. Before you commit, agree in writing who prepares the packing list, how panels are protected at the corners, which container or shipment each room's components belong to, and what happens if one panel arrives damaged. Ask how the delivery is labelled — a crate marked "Bedroom 2 left panel" saves a day of unpacking, while "1 of 6" does not.
Then confirm who installs. A supplier offering installation and after-sales support alongside manufacturing removes the handover argument between a local carpenter and an overseas factory, which is where most snag lists are born. If you are using your own trades, send them the drawings early so they can challenge anything before production starts.
What to attach to your first message
- Floor plan or a sketch with measured dimensions of each wardrobe wall
- Two or three photographs of the room, taken from both ends
- The finish direction: gloss or matte, and any colour codes to match
- Door system preference, or a note that you want options proposed
- Interior layout list — hanging, drawers, shelves, lighting
- Project location, storey, lift or stair access, and target installation date
- Quantity: one bedroom, a whole floor, or several units of the same type
Quantity is worth stating honestly even when it is one. A single made-to-measure wardrobe and twenty identical ones are different conversations, with different tolerances, packaging and site sequencing.
Questions worth putting to any supplier
- Who signs off the final production drawings, and what changes after that point?
- What is excluded from the quoted price — installation, freight, hardware, lighting?
- How are offcuts, spare panels and touch-up material handled?
- What tolerance do you allow on site, and how are out-of-square walls corrected?
- Which parts are covered if something fails after handover, and for how long?
A supplier who answers these directly is telling you how the project will run. Vague answers usually mean the cost appears later.
SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with custom and OEM production coordinated from design through to door-to-door delivery. Send us your room measurements, finish direction and layout list, and we will come back with a dimensioned wardrobe proposal rather than a catalogue page.