Open wardrobes suit bedrooms where a full-height door wall would close the room down: a villa master suite with an adjoining dressing area, a guest bedroom in an apartment handover, a serviced-apartment unit where the client wants the storage to read as joinery rather than furniture. They are also one of the easiest wardrobe types to get wrong, because with no doors there is nothing to hide uneven carcass edges, a shelf that fights the skirting line, or a hanging rail set at the wrong height for the specified garments. That is why buyers increasingly ask for them as OEM work rather than picking a catalogue item.
OEM means your team supplies the specification and the factory builds to it under your brand or project name. Below is how that process actually runs from first drawing to site handover, using minimalist open wardrobes as the worked example.
Where Open Wardrobes Earn Their Place in a Project
An open wardrobe is a carcass, shelves, hanging zones and drawers with the front left open. The design logic is subtraction: remove the door assembly, then make what remains look deliberate. Clean reveal lines, consistent panel thicknesses and a finish that continues into the room are what separate a considered open wardrobe from a shelving unit with a rail.
On project lists they usually appear in three situations:
- Dressing rooms and walk-in areas, where circulation space matters more than enclosure. Our Open Walk in Wardrobes collection covers the layouts that come up repeatedly on villa work.
- Smaller bedrooms where a sliding or hinged door would clash with the bed swing or the clearance to an adjoining door. Here Wall Mounted Open Wardrobes keep the floor line clear, so skirting and floor finishes run through underneath without a cut-out.
- Showroom-style display in hospitality and display apartments, where the storage is part of the styling. Minimalist Open Wardrobes and Metal Frame Open Wardrobes are the two references buyers send us most often when they want a slim profile rather than a full panel carcass.
If the client's brief actually calls for closed storage with a minimalist face, we redirect them to Custom Minimalist Bedroom Wardrobe work — flat panels, optional handleless openings, made-to-measure internal layout. Being asked that question early is a normal part of the OEM conversation, not a sign the brief was wrong.
Step 1: The Specification Package You Send
The quality of the quotation depends almost entirely on what arrives in the first package. For an open wardrobe there is less to guess at than for a door-fronted unit, but every dimension has to be stated because there is no front elevation to fall back on.
| Item | What the factory needs to see |
|---|---|
| Openings and constraints | Room dimensions with the finished floor level marked, plus skirting heights, ceiling heights, and the position of switches, sockets, downlights and any ducted air conditioning return that crosses the wardrobe line. |
| Module sizes | Overall width, height and depth per module, and whether carcasses are butted together or built as separate units. Depth drives everything downstream: hanging space for long garments needs more than a standard shelf bay. |
| Internal layout | Which bays hang, which hold shelves, where drawers sit and how deep they are. Trousers pulls, shoe shelving and jewellery drawers each change the runner specification. |
| Panel and finish schedule | Carcass board type and thickness, edge treatment on all visible faces — critical for open wardrobes, since every panel edge is on show — plus the surface finish. We work in wood, metals, engineered stone and laminates, and can match a colour or grain sample you send. |
| Hardware | Drawer runners, hinges where doors do appear, hanging rails, integrated lighting and its transformer location. State brands if your project standard names them. |
| Branding and packaging | For OEM work: engraved or embossed logos, interior labels, protective packing and carton marking to your receiving site's requirements. |
A single PDF with these six blocks is enough to start. Missing dimensions are the most common cause of a stalled quotation, because we cannot quote an open wardrobe credibly without knowing how the top reveal meets the ceiling.
Step 2: Design Review, Prototyping and Sign-Off
Our design team turns your package into production drawings: elevations, section through a typical bay, the internal layout at 1:10, and the fixing detail for the wall condition on site. Where the unit is a first article for a repeat programme, we build a prototype before full production so you can check panel colour under your own lighting, the feel of the drawer runners and how the edges read at close range.
Two decisions get locked at this stage and should not move afterwards:
- The edge detail. Open wardrobes expose every cut. The choice between a matching edge band, a mitred wrap or a visible structural reveal changes both the drawing and the price.
- The top condition. A wardrobe built to the structural slab will not fit a finished ceiling with plasterboard, cornices or shadow gaps. We build to the ceiling set-out dimension you confirm, and say so on the drawing.
Signed drawings and an approved prototype are what we produce against. Anything changed after that restarts the shop-drawing cycle, which is why we push for full internal layout approval before tooling rather than at delivery.
Step 3: Production, Quality Control and MOQs
SANTERSON has been manufacturing furniture and building materials in China since 2008, with panel furniture produced alongside the other fit-out trades we supply — cabinetry, wall panelling, flooring, lighting and bathroom ceramics. For OEM wardrobe programmes that matters practically: your carcass boards, drawer fronts, wall panels and skirting can be specified from the same board batch, so grain direction and colour match across the room instead of being reconciled on site.
Minimum order quantities are set per project rather than by a fixed catalogue number. A single villa's dressing room and an apartment rollout of several dozen bedrooms both run through the same OEM process; what changes is how the work is batched, how many prototypes are made and how the packing list is organised.
Quality control on open wardrobes concentrates on the visible surfaces: panel flatness, edge banding adhesion at the corners, alignment of shelf pin holes across butted carcasses, and squareness of drawer fronts when the unit has no door to mask a misalignment. We photograph each packed module against its label so the receiving team can match cartons to room numbers before unloading.
Step 4: Shipping, Site Readiness and Installation
Wardrobes travel flat-packed or as partially assembled carcasses depending on module size and the site's lift access. Our logistics team handles sea, air and rail freight, packing and container loading, commercial invoices, packing lists and certificates of origin, with tracking through to the delivery address.
Installation follows the same sequence whether the units are for one villa or a whole floor: level and fix the carcasses, set the shelves and rails, fit drawer stacks, then adjust lighting. Snag inspection closes out with the site contractor, and spare panels and hardware ship with the main consignment so the same batch is on site if something is damaged in the building works that follow.
A Practical Example: Working Through One Dressing Room
Take a villa master dressing room with three bays: a full-height hanging bay for long garments, a second bay hung at two levels for shirts and folded stock stored above them, and a third bay given over to shelves and drawers with an integrated light. Depth is fixed first, because the long-garment bay sets the carcass depth for every butted module. Drawer stack height comes next, so the top drawer clears the knee line and does not foul the shelf above it. Bay widths follow, since a wide open shelf span needs either a mid support or a thicker panel — an issue that never shows on a door-fronted elevation because the carcass interior is hidden. Lighting profile and driver location are settled last, once the shelf depths are known.
Only after those four decisions do we confirm finish and branding. A quotation built in that order returns close to final; one requested from a reference photograph alone typically moves twice before production.
Questions Buyers Ask Before Committing
Can you build to our existing detail drawing? Yes. Send the CAD or PDF and we return production drawings from it, flagging anything that conflicts with standard board sizes or hardware.
Can the wardrobe be supplied under our own brand? OEM manufacturing with private labelling is part of our Custom & OEM Service: logos, labels, packaging and carton marking to your standard.
What if the on-site dimensions differ from the drawings? This is why we ask for a site survey after finishes are complete, before releasing the cutting list. Where a variance appears late, we produce replacement modules against the surveyed dimension rather than asking the installer to scribe on site.
Can wardrobes be coordinated with other joinery in the same project? Yes — that is normally the point of OEM sourcing. Kitchen cabinetry, sideboards, wall panelling and doors can run through the same specification cycle so finishes and reveal details match. See our project services for how design, production, logistics and installation are sequenced.
If you have drawings or a room dimension list for an open wardrobe package, send them with your target delivery location and we will return production drawings and a quotation. Enquiries go through our contact page, where the project is coordinated from first drawing through to handover.