A glossy melamine wardrobe looks simple on a rendering: flat reflective door, clean lines, no visible grain. That is exactly why two quotes for the same bedroom can differ by a wide margin, and why the finished wardrobe on site may not match the one you approved. Before you sign anything, read the quotation line by line and make sure every element that drives price and performance is written down.
1. What the price actually covers
Wardrobe quotations are rarely priced on one basis. Ask which of these are inside the number and which are add-ons:
- Carcase and door panels, edge banding, back panel, and fixing hardware
- Interior fit-out: shelves, drawers, hanging rails, trouser slides, lighting provision
- Sliding or hinged door system, including tracks, buffers and any mirror or glass inserts
- Plinth, scribe fillers, cornice and wall-leveling work where walls are out of plumb
- Packing, freight, on-site delivery, installation and snag rectification
If a line is missing, it will appear later as a variation. Our project services are quoted against a defined scope covering production, packing and container loading, door-to-door delivery, installation and after-sales support, so the same items can be checked off stage by stage.
2. The finish specification, in writing
"Glossy melamine" is not a specification. Two panels described the same way can differ in gloss level, colour match and edge quality. Ask the supplier to state:
- The exact board type and thickness used for doors and for the carcase
- A colour or decor reference from the supplier's own sample range, not a photo on a website
- Whether the surface is a melamine laminate, an acrylic or lacquer finish, or a high gloss foil — the cleaning regime and the price are different
- The edge treatment: matching ABS edge banding on all four edges of doors, and how visible the join line is at the corner
- Which side of the panel is finished. A wardrobe with an exposed end panel needs that face finished to match the door, otherwise it is a separate cost.
For our Glossy Finish Melamine Wardrobes, finish, layout and dimensions are specified per project rather than chosen from a fixed catalogue size, so the sample reference you approve is what gets produced. Related finishes in the same collection — Matte Finish Melamine Wardrobes, Two Tone Melamine Wardrobes and Wood Grain Melamine Wardrobes — let you put a reflective door against a matte body, which is where the cost of a "glossy" wardrobe usually comes down again.
3. Dimensions and how they were taken
A quote built on drawing dimensions is an estimate; a quote built on site-measured dimensions is closer to a commitment. Check that the quotation states:
- Overall height, width and depth, plus whether the height includes the plinth and any cornice
- Floor and ceiling levels at both ends of the run — an old villa wall is rarely square
- Clearance for skirting, architraves, door swings, light switches and air-conditioning returns
- How services in the wall (switches, sockets, downlights) will be worked around or cut into
For a made-to-measure order, ask what happens if on-site dimensions move by 10–20 mm after the order is released. Filler panels and scribes are the normal answer, but they should be priced now, not at handover.
4. Hardware schedule
Hardware is where a low quote quietly becomes expensive later. Request the brand and model reference for each item rather than generic descriptions:
| Item | What the quote should name |
|---|---|
| Hinges | Brand, cup diameter, opening angle, soft-close or not, number per door |
| Drawer runners | Load rating, full extension or partial, soft close, runner height |
| Sliding door system | Track material, wheel type, maximum door weight and door height the system supports |
| Handles | Integrated profile handle or surface-mounted, finish reference, hole centres |
| Interior fittings | Shelf span and thickness limit, rail length, shoe and accessory modules |
Sliding doors on a glossy melamine front are heavier than they look. If the quotation does not state the maximum door height and weight the track supports, ask for it in writing before approval.
5. How gloss is protected in transit
A reflective panel shows every chip on its corner and every scuff on its face. For any order travelling by sea, confirm the packing method before it ships:
- Protective film left on door faces through installation, removed only on site
- Edge protection on corners, and corner boards inside the carton
- Panel orientation in the container — doors stood on edge or laid flat, with blocking between bundles
- Photographs of loaded containers, so damage claims have a baseline
- Whether replacement panels for damaged parts can be produced and shipped without re-making the whole wardrobe
Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail together with customs paperwork and shipment tracking; cargo insurance options and Incoterms are confirmed per project rather than assumed.
6. Production sequence and what you approve
Ask for the approval trail in the quotation: which drawings you sign, when a physical finish sample is issued, whether a prototype or first article is produced, and what changes are still possible after each stage. A supplier offering custom and OEM service should be able to describe prototyping, finish sampling and drawing sign-off as defined steps — if they cannot, a change request mid-production will be charged.
Also confirm what is excluded: site preparation, plastering, electrical work for interior lighting, making good after installation, and any trades you must arrange yourself.
7. After the order is placed
The last section of a serious quotation deals with what happens when the wardrobes arrive: who installs, how snags are recorded and closed out, which parts are covered and for how long, and how spare panels or hardware are supplied later. Get these terms in the same document as the price. Our installation and after-sales support covers on-site installation, inspection with snag lists, warranty coverage, spare parts and ongoing maintenance; specific warranty terms and response arrangements are confirmed for each project.
Send us the drawing or the room dimensions along with your finish preference and we will price the wardrobe against that checklist — including packing, delivery and installation — so the number you approve is the number you pay. Enquiries through our contact page receive a reply within 24 hours during business days.