A custom outdoor swim spa only works if it arrives ready to install on the exact slab, deck or terrace you have prepared for it. Before we release a production order for the Outdoor Swim Spa WS-SP500-MS, our engineering and project teams walk through a fixed checklist with the buyer, architect or contractor. This article sets out that checklist in the same order we use internally, so you can send us complete information in one round instead of several.
Start With the Shell Size, Not the Features
The catalogue entry for WS-SP500-MS lists a shell of 5000 × 2500 × 1600 mm. Treat those figures as the starting point of the conversation, not the final number, because the dimensions you confirm determine what follows: transport route, crane or forklift access, structural loading on a deck or balcony, waterproofing detail at the perimeter, and clearance for the equipment compartment where the pumps, filter and control system sit.
Before production we ask for a dimensioned site plan showing the finished water level relative to the surrounding paving or decking, the location of the equipment access side, and how the shell will be lowered into position. If your architect has already drawn a surround, send that drawing. A 500 mm difference in an access aisle changes whether the spa can be delivered assembled or must be handled as a sectional build.
Confirm the Equipment Set Line by Line
The standard specification shown for this model on our site is the baseline. Two configurations built on the same shell can perform very differently, so we confirm every line item in writing before the order enters production.
| Specification shown for WS-SP500-MS | What we confirm before production |
|---|---|
| Catalogue shell size 5000 × 2500 × 1600 mm | Final external and internal dimensions, wall thickness, water depth at the swim lane and at the seating area |
| Control system: 1 set | Control panel type and mounting position, whether it is inside the equipment compartment or on the coping where children cannot reach it |
| Swim training system: 1 set | Counter-flow unit type and output, so the swim lane length matches how you intend to train |
| Water pump: 1 pc; filter pump: 1 pc | Pump duty and filtration turnover for your expected bather load; upgrades are available on request |
| Jet total: 29 pcs | Jet layout mapped to the seating positions you actually use, plus jet type and adjustability |
| LED lights: 4 pcs | Fitting positions, colour mode and whether lighting is tied to the same control as the jets |
| Total power 11.55 kW | Supply voltage, phase, dedicated circuit sizing, protective device and earthing at your site |
| Features shown: water jets, LED lighting, ozone | Ozone output and dosing arrangement; whether UV sterilisation is added on top |
The catalogue also lists options such as control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each option against the configuration you have chosen rather than assuming it fits.
Agree the Materials and Finish You Are Buying
Acrylic interior surface, cabinet reinforcement, insulation layer and exterior cladding are all specified separately. For a spa installed outdoors, we confirm the insulation package and the exterior finish against your local climate and against how the surround is built, because trapped moisture behind an exterior panel is one of the few defects that becomes expensive to repair after installation.
This is also where our Custom & OEM Service comes in. We produce bespoke material finishes and textures, and we can match an exterior cladding to the decking, louvres or wall panels already specified for the project. If you are a brand or distributor ordering under your own label, private labelling and packaging are handled in the same production round.
Fix the Water Treatment and Maintenance Access
Ozone is shown as standard on this model. Before production we confirm the sterilisation train you want — ozone alone, or ozone plus UV — along with the filter type, whether sand filtration replaces the cartridge arrangement, and where the chemical dosing point sits. We also confirm that the equipment compartment door opens fully against your surround, because a compartment blocked by fixed paving cannot be serviced without cutting the finish work.
Plan Delivery, Setting and Commissioning as Part of the Order
A swim spa is a heavy, bulky item with a fixed delivery route requirement, so we treat logistics as an engineering question rather than a paperwork one. Our Logistics and Door-to-Door Delivery team handles freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking to your site. For a project order we confirm the delivery address access, the setting method, and who provides the crane or lifting gear.
If the spa is one element of a wider outdoor build — poolside furniture, pergola, decking, exterior lighting — it is usually more efficient to place it inside a single package. Our Turnkey Interior Project Solutions cover villas and hospitality sites from design consultation and material selection through production, project management and handover, so the swim spa, the surrounding outdoor furniture and the interior fit-out reach site on one coordinated schedule. See the wider Swimming Pools and Swim Spas range when you want to compare this model against longer or shorter shells.
After arrival, our Installation and After-sales Support team covers on-site installation, inspection and snags, spare parts and ongoing maintenance. Confirm the commissioning scope for your site in the order documents, together with warranty terms and what is excluded.
The Documents We Need From You
Send these before we open a production file
- A dimensioned site plan with the spa position, access side and finished surrounding levels.
- Confirmation of setting method and lifting arrangements, including crane or forklift access.
- Electrical supply details: voltage, phase, available dedicated circuit and earthing arrangement.
- The signed equipment schedule — jets, pumps, control, swim training unit, lighting, ozone and any added UV, heat pump, sand filtration or insulation.
- Selected interior surface and exterior cladding, with the finish reference if you are matching existing work.
- Delivery address, access constraints, Incoterms and the receiving party for customs clearance.
A Practical Way to Shorten the Lead-Up
The single biggest cause of delay on a custom swim spa order is an equipment schedule that changes after production starts. Confirm the electrical supply and the sterilisation train first, since those two decisions drive pump selection, circuit sizing and compartment layout. Freeze the shell dimensions before you finalise the paving or decking around it. Where the spa sits inside a larger villa or resort package, share the full scope with us at the outset so the swim spa drawing and the surrounding furniture drawings are coordinated rather than reconciled later.
If you are specifying WS-SP500-MS for a private villa, a resort, or a distributor order under your own brand, send us the site plan and the equipment list above. We will return a configuration sheet and quotation built on your confirmed inputs rather than on catalogue defaults.