A custom minimalist bedroom wardrobe is specified, not ordered. Two identical-looking flat-front wardrobes can differ by a wide margin in price once you compare the carcass build, the door system, the internal layout and the finish. The quotation stage is where those differences surface — so the quality of your enquiry determines the accuracy of the number you get back.

This guide walks through exactly what to send when you request a quote for a custom minimalist bedroom wardrobe, and how our team at SANTERSON turns that information into production drawings, a confirmed specification and a delivered set of doors that line up on site.

Why minimalist wardrobes are quoted differently from standard ones

Minimalist design removes the elements that hide imprecision. There is no moulding, no raised panel and usually no visible handle to absorb a small measurement error or a slight misalignment. What remains is a run of flat panels meeting at clean reveals, which means everything has to be right at the first fix.

That changes what a quotation covers. A standard wardrobe quote prices a box with doors. A minimalist built-in quote has to price the interface between joinery and building: how the unit meets an uneven ceiling, whether the side panels are scribed or boxed in, how the door run is aligned when the floor slopes, and how services, skirting and architraves are worked around. For apartment projects and hotel guest rooms, where layouts repeat across many rooms but wall dimensions still vary room to room, that site-by-site adjustment is the main thing we coordinate with the client.

What to send before we can price your wardrobe

Send these six items and we can usually come back with a workable quotation instead of a placeholder range. Missing information is what causes quotes to move after the first round.

InformationWhat good looks like
Opening dimensionsWidth, height and depth at three points each (top, middle, bottom). Note out-of-plumb walls and any ceiling bulkhead.
Room contextFloor finish and its thickness, skirting detail, position of switches, sockets and radiators, door and window swing.
Layout intentA rough sketch or an existing floor plan. Mark hanging zones, drawer zones, shelf storage and any section you want left open.
Door systemHinged, sliding, pocket, folding or a handleless push-open front. Note clearance in front of the unit for hinged doors.
FinishMatte, high gloss, lacquer, veneer or wood-effect surface, plus your preference on light or dark tones against the wall colour.
Project dataQuantity of rooms or units, delivery destination, target on-site date and whether installation is by your team or ours.

The specification choices that move the price

Once we have dimensions, these are the decisions we will ask you to confirm. Each one changes material use, hardware and production time, so decide them before the quotation is finalised rather than during production.

  • Carcass and structure. Board type and thickness, edge treatment, and whether the unit is built to a fixed modular size or made to measure around the actual opening. Made-to-measure suits recesses, sloping ceilings and full-height storage walls.
  • Handleless detailing. Optional handleless design keeps the wardrobe surface seamless and ultra-simple, but it requires either a rebate along the door edge or a push-open mechanism — both are quoted separately from the panel itself.
  • Internal layout. Hanging areas for long garments and short garments, drawer zones, shelf storage, and accessories such as pull-out racks or lighting in open niches. Layout follows how the room is actually used, so we ask who uses it and what is stored.
  • Surface finish. Matte and textured surfaces hide fingerprints and are practical for high-use family bedrooms and guest rooms; high gloss reflects light and enlarges a compact room visually. Veneer and wood-effect panels bring warmth into an otherwise minimal scheme.
  • Ventilation and back panels. Often left out of early enquiries. For enclosed recesses and wardrobe doors that close tightly, airflow detail affects both the build and the cost.

How our quotation process runs

For a project enquiry, the workflow follows the same stages we use across villa, hospitality and apartment work:

  • Brief and space planning. We review your drawings or send a layout proposal, and flag dimensional conflicts before anything is priced. Our interior design services cover concept layouts and 3D visual renderings, so you see the built result rather than a schedule of parts.
  • Specification and quotation. You receive an itemised quote by unit: carcass, doors, hardware, finish, and any scribing or site adjustment. Where we can offer a cheaper equivalent that keeps the same visual result, we say so.
  • Drawings and sign-off. Production drawings show every panel size, door reveal and internal dimension for your approval. Nothing enters production until those drawings are confirmed in writing.
  • Production and quality control. Panels are machined, finished and packed as a labelled set per room, so the installation crew is not sorting parts on site.
  • Delivery and handover. We arrange freight to site under our turnkey solutions, with installation support and after-sales service available where required.

Ordering more than one wardrobe: what changes

For multi-room work — apartment blocks, villa floors, hotel guest rooms — send the full room schedule rather than a single typical section. We standardise the internal layout across units to hold cost, then adjust only the external dimensions where wall sizes differ. Repeat runs also let us pre-finish panels in batches and pack by room number, which shortens on-site time.

If you supply joinery under your own brand, our custom & OEM service covers bespoke sizes, finishes and textures, prototyping, and private labelling with flexible minimum order quantities.

Send a floor plan even if it is rough. A hand-drawn elevation with three dimensions on it is enough for us to price the first version. Plans reduce quotation rounds far more than any other single document.

Before you send the enquiry: a short checklist

  • Measure after the floor finish is known, and state its thickness.
  • Decide the door system before comparing quotes — sliding, hinged and handleless push-open are not equivalent line items.
  • List what you want hidden behind doors and what stays on display; that determines whether closed fronts or an open wardrobe section is the right answer.
  • Confirm who installs. Site preparation and making good are usually the buyer's scope unless agreed otherwise.
  • State your target on-site date, not just an order date — freight scheduling depends on it.

All dimensions, board specifications and hardware schedules in a quotation are project-specific and confirmed on drawings before production. Finish samples can be requested for approval before panels are machined.

Request your wardrobe quotation

Send us the opening dimensions, a layout sketch and your finish preference, and we will return an itemised specification with production drawings. For bedroom storage across a whole project — wardrobes, vanities, media walls and interior fixtures in one coordinated package — tell us the room count and destination, and we will quote it as a single programme.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com