Outdoor kitchens, poolside bars, garden pavilions and resort service pantries sit in an awkward place in the specification package. The interior designer treats them as joinery; the procurement team treats them as external works; and the cabinet lands somewhere in between, usually quoted late and confirmed later. Santerson Outdoor Ready PVC Cabinets is our made-to-measure PVC cabinet line for exactly these positions — but a product page cannot carry the whole decision. Below is the alignment checklist we ask design practices and purchasing teams to work through before a drawing is released for production.
Start with the exposure, not the finish
The single most common cause of rework on external cabinetry is that the schedule describes appearance first and exposure second. Before any door profile or colour is fixed, both sides should agree in writing what the run is actually standing in.
- Covered or open. A joinery wall under a pergola soffit behaves very differently from one on an exposed terrace with no overhead protection. Note the soffit, the overhang depth and whether wind-driven rain reaches the front face.
- Splash zone. Poolside and spa-adjacent runs take spray and backwash. Wet bars and outdoor pantries take daily spillage and cleaning chemicals.
- Sun load. North-facing (or south-facing, in the southern hemisphere) elevations get all-day direct light. This affects colour and surface selection far more than most schedules record.
- Coastal proximity. Salt-laden air changes what hardware and substructure are reasonable. State the site's distance from the coast on the drawing rather than leaving it to the supplier to guess.
- Use intensity. A resort banquette servery is cleaned twice a day; a private villa garden bar is used at weekends. Cleaning frequency and product belong in the handover document.
Once exposure is documented, the material conversation becomes short instead of argumentative. Our PVC cabinet line is offered for external and high-moisture positions where a standard board-based box would be a poor choice, and the whole point of specifying it is that the substrate stops being the weak link.
Agree what "made to measure" actually covers
Product pages describe a collection, not a finished job. For this line the configuration we produce is project-specific: dimensions, material and finish options, and a layout drawn to the site. Designers and buyers should confirm, on the same sheet, which of those three they are locking and which remain open at order.
| Item | Designer's input | Buyer's confirmation |
|---|---|---|
| Overall dimensions | Taken from setting-out drawings, with floor levels and finishes accounted for | Site-verified measurements or a survey before release to production |
| Layout and internal fit-out | Appliance positions, plumbing and drainage routes, drawer versus door storage | Whether the layout repeats across villas or guest rooms, which changes unit count and spares |
| Door profile and finish | Profile, colour and sheen matched to the interior joinery palette | Finish samples approved against the site's light conditions, not a showroom board |
| Substructure and fixing | Wall build-up, framing, load path for stone or engineered-stone tops | Who supplies and installs the supporting frame — us, the builder, or the joinery contractor |
| Hardware | Hinge and runner brand, soft-close requirement, handle or handleless edge | Replacement parts held on site for hospitality runs |
That table is the document we want to receive. When it arrives complete, production coordination is fast; when it arrives as a mood board and a colour name, someone downstream is going to make an assumption that costs money later.
Do not let the collection names confuse the specification
Our PVC kitchen range covers several distinct door styles, and project teams sometimes name one while drawing another. Santerson Shaker Style PVC Cabinets sits in the same family of configurable project cabinetry but is specified where a framed, traditional profile is required, while High Gloss PVC Cabinets answers a reflective, contemporary brief. If the drawing shows a shaker profile on an external run, say so in the schedule and let us confirm which construction suits that exposure — we would rather have that conversation at tender stage than after the order is placed.
The same discipline applies to anything adjacent to the cabinets. Integrated appliances, stone tops, splashback materials and lighting all sit inside the joinery envelope, and each one changes what the cabinet carcass has to carry.
Where custom and OEM support changes the outcome
Standard catalogue sizes rarely survive contact with a real terrace. Bays are uneven, drainage falls one way, and an outdoor grill enclosure has to clear a flue. Our Custom & OEM Service covers bespoke sizing, material and finish selection, prototyping and brand-level customisation, so a designer can push a profile or radius that no standard unit offers. What we need from the design side to make that work is early access to elevations and sections — not a finished tender drawing three days before the deadline.
For multi-unit developments, buyers should raise repetition at the same time. A run of villas or guest rooms using one repeated external cabinet type is a different production and pricing conversation from one-off bespoke work, and it also decides how many spare doors and drawers we recommend shipping with the original container.
Logistics and installation belong in the spec conversation
External cabinetry is usually on the critical path at the wrong moment: the terrace paving is being laid, the roofline is not finished, and the cabinets are still in transit. Our Turnkey Interior Project Solutions approach covers freight forwarding with customs paperwork, container loading, delivery to site and installation support, so the joinery is coordinated with the rest of the fit-out rather than arriving as an isolated package.
Two practical points both parties should settle before order:
- Access and storage on site. Full-height panels and stone tops need a dry, secure place to sit until the terrace is finished. Confirm this in the delivery plan.
- Sequence of works. Cabinets go in after wet trades, paving and roofline are complete, but before final landscaping and furniture. Put that sequence on the programme, not in an email thread.
A short sign-off list
Before releasing a Santerson Outdoor Ready PVC Cabinet package to production, we suggest the designer and buyer initial these six lines together:
- Exposure statement for each run — covered or exposed, splash zone, sun orientation, coastal distance.
- Site-verified dimensions with finished floor levels noted.
- Door profile and finish approved from a sample viewed in site conditions.
- Appliance, plumbing, electrical and lighting positions fixed on the drawing.
- Responsibility for substructure, tops and splashback named — supplier or contractor.
- Delivery window, storage location and installation sequence confirmed against the programme.
Dimensions, materials and performance details are confirmed per project rather than assumed from the catalogue. Send us the elevations, the exposure notes and the site address, and we will return a specification and quotation built on those conditions.
Talking through an outdoor or high-moisture cabinetry package? Send SANTERSON your drawings and site conditions, and we will confirm construction, finish options and a project-specific quotation.