A floating TV unit looks effortless on a finished wall. It also carries a screen, hides equipment, holds wiring and has to survive daily use in a home or guest suite. That combination is why project buyers usually stop considering custom floating TV units at one specific moment: when the wall, the joinery package and the electrical plan all have to be settled together, before anything goes into production.
The trigger is a wall that standard casework cannot satisfy
Off-the-shelf media units are made to a fixed set of dimensions and installed against whatever the room already offers. Custom work starts to make sense as soon as the design depends on conditions you control instead:
- The wall has an exact screen size, niche or reveal that a standard cabinet width cannot fill without visible filler panels.
- The unit has to match the finish of other built-in joinery in the same project — wardrobes, sideboards, kitchen cabinetry, wall panelling — so veneer, lacquer and edge detailing need to be specified together.
- Equipment, cabling and ventilation routes have to be planned into the carcass rather than dressed afterwards.
- The same design has to repeat across several rooms, villas or guest rooms, so a confirmed specification matters more than one-off fitting.
Decide early, because a floating unit sits on the critical path
Unlike a freestanding cabinet that arrives at the end of a fit-out, a wall-mounted unit depends on decisions made much earlier. The fixing method needs solid substrate or blocking in the wall. Socket outlets, TV points and low-voltage runs need positions that the carcass will actually cover. If lighting is part of the design, its power feed and driver access have to be resolved before the wall is closed up.
That is why project buyers should bring the floating unit into the conversation at space-planning stage rather than at furniture selection. Once drawings and site measurements are available, layout, dimensions, materials, finishes and integrated lighting can be confirmed as one specification, and the wall preparation, joinery and electrical scopes stop contradicting each other.
What a custom specification actually covers
SANTERSON's built-in furniture range includes floating TV units in both the TV Cabinets / Media Units and Media & TV Walls collections. Each listing is configurable rather than fixed: made-to-measure sizing, material and finish options, and a layout tailored to the project. In practice, the specification you confirm covers:
| Decision | What to settle before production |
|---|---|
| Dimensions and proportions | Unit width, depth and height against the wall; screen size and viewing height; clearance for doors and drawers when open. |
| Mounting and substrate | Fixing method, wall construction and any blocking required. Confirm this with the site team before the wall is finished. |
| Storage layout | Mix of open display, closed cabinets and drawers, sized for the items that will actually live there. |
| Materials and finish | Board substrate, veneer, lacquer or laminate, matched to other joinery in the same project. |
| Cable and equipment management | Routing positions, access panels, ventilation for equipment that generates heat. |
| Integrated lighting | Where lighting is specified, confirm the fitting, power feed and driver access for the selected design. |
Confirm dimensions and selected specifications for each project
Our product listings state that sizing, materials, finishes and layout are specified per project. Mounting requirements, hardware, load-bearing detail and electrical or lighting specifics are agreed with your team for the actual site condition — they are not fixed values published on a catalogue page.
Four configurations, chosen by how the wall is used
The Media & TV Walls version of our Floating TV Units is designed for residential wall-system projects, while the TV Cabinets / Media Units listing covers the same made-to-measure approach for living-room joinery. Both are specified per project rather than ordered from a fixed size grid. Four configurations cover most residential and hospitality living-room briefs; read them as starting points, each re-dimensioned to your wall.
Open & closed combination units
Open & Closed Combo Units split the wall between display and concealed storage. The trade-off is straightforward: open shelves make a room feel lighter but collect objects and dust, while closed fronts keep clutter out of sight at the cost of accessibility. Decide the split by what the household or guest actually stores.
Wall-mounted media walls
Wall Mounted Media Walls extend the composition across a full wall, which is where a floating unit stops being a piece of furniture and becomes a wall system. Storage, paneling and screen position are designed as one elevation, and finish continuity with adjacent joinery matters more than any single module.
Units with integrated LED lighting
Integrated LED Media Units put the light line into the carcass — a common request for display niches and backlit reveals. This is the configuration that most often delays projects, because the joinery and the electrical scope have to agree before either side commits. Set the lighting specification and its access requirements at drawing stage.
Freestanding as the fallback
If the wall cannot be opened, blocked or re-wired — a retrofit where finishes are already complete, for instance — Freestanding TV Cabinets deliver the same proportions and finish without load-bearing fixings. Made-to-measure sizing still applies; only the mounting changes.
Buy it as part of the joinery package, not as a separate line item
The strongest procurement argument for custom floating TV units is finish consistency. A veneer or lacquer sourced separately from the wardrobes and kitchen cabinetry in the same building will read as an addition, however well it is installed. Sourcing the media wall through the same turnkey interior project scope means one material schedule, one production run and one coordination point across villa, hospitality or office work.
Design support for this kind of joinery covers space planning and layout, furniture layouts with 3D renderings, drawing and production coordination, and on-site guidance. Production is followed by freight by sea, air or rail with customs paperwork and door-to-door delivery, then installation support and after-sales service for the delivered package.
A short pre-production checklist
- Wall construction confirmed, with blocking or substrate detail agreed for the fixing method.
- Screen size and mounting height fixed, so shelf and cabinet heights follow from it.
- Socket, TV-point and low-voltage positions shown on the joinery drawing, not only the electrical drawing.
- Lighting specified with driver access, or explicitly excluded.
- Finish samples matched against the project's other joinery under site lighting.
- Final dimensions signed off from site measurement, including skirting, cornices and any protrusions.
When custom is not the right answer
The reverse case is worth stating plainly. If the brief only needs a screen support and simple storage, if the wall cannot be modified, or if the unit may be relocated later, a standard or freestanding piece is the better spend. Custom floating units earn their cost where dimensions, finish matching and repeated installation across rooms are real requirements — not as decoration alone.
Send us your drawings, room dimensions and target finish, and we will return a specification for floating TV units sized to your wall — with production, delivery and installation support through the same project scope. Contact SANTERSON to start the consultation.