Interior doors are one of the smallest line items in a hotel or villa budget and one of the most visible parts of the finished building. A guest touches them dozens of times a day; a homeowner sees them every morning. This guide walks through how we specify Santerson Decorative Interior Doors on hospitality and residential projects — from the opening schedule through finish selection, sampling, packaging and site installation — so that procurement teams can lock the door package early instead of firefighting it in the last month on site.

Why decorative doors decide the look of a project

On most fit-out jobs the wall finish, the joinery and the doors are bought from three different suppliers with three different drawing sets. The result is predictable: doors that sit proud of the wall lining, mouldings that do not match the skirting, and a paint colour on the door face that reads differently from the wall next to it.

Decorative interior doors solve this by being treated as part of the joinery package rather than as commodity hardware. In our Windows and Doors range, decorative doors are made to the same dimensional and finish discipline as our cabinetry, so a veneer door leaf can be drawn from the same batch logic as the wall panelling beside it. For hotel corridors and villa suites that is where the perceived quality of the whole interior actually sits.

Start with the opening schedule, not the door style

Every decorative door project begins with a schedule, not a brochure. Before we quote anything, we ask the client or consultant for:

  • Opening sizes per room type. Width and height of each structural opening, plus floor build-up height, because a 20 mm difference in finished floor level changes leaf height and clearance.
  • Wall construction. Masonry, blockwork or stud partition determines the frame type, the anchorage detail and whether a concealed frame can be built into the wall before lining.
  • Swing and hardware allowance. Hinge positions, lock body size, door furniture, closers and any access requirement all sit inside the leaf and must be agreed before the panel is decorated.
  • Quantity by room type. Guest-room doors are repeated; suite and public-area doors are not. Grouping them correctly keeps unit cost down without flattening the design.

Santerson Decorative Interior Doors are made to measure, so the schedule is the specification. If you send us a room-by-room door schedule with opening dimensions and finish references, we return shop drawings for each type before production starts.

Choosing the right door family for each space

"Decorative" covers several distinct details, and each one behaves differently once it is installed. The table below maps the options we most often specify on hotel and villa work.

Door typeWhere it worksWhat to check before ordering
Decorative Interior Doors Guest rooms, villa bedrooms, suites — where the door face carries a moulded or profiled design Panel profile depth against hardware; whether the same profile repeats across the floor for bulk pricing
Flush Interior Doors Back-of-house, service corridors, minimal modern villas Edge detail and architrave or square-set reveal; paint grade versus decorated finish
Decorative Concealed Doors Feature walls in lobbies, restaurants and villa living areas where the door should disappear into panelling Wall build-up sequence, frame reveal width, and coordination with the panelling supplier
Handleless Concealed Doors High-end villa suites and hotel bathrooms where a clean, ironmongery-free face is required Push-pull or recessed pull detail, hinge load against leaf weight, and door stop arrangement
Integrated Door & Paneling Bedroom walls, media walls and bathroom panelling where the door is drawn as part of the panel layout Who owns the interface — doors or joinery — and who signs off the combined shop drawing

A practical note on naming. Product titles in our catalogue describe the collection a door belongs to, not a fixed technical specification. The finish system, core construction, frame profile and hardware set are confirmed on the approved shop drawing for each project, so treat catalogue names as a starting point for discussion rather than as an order sheet.

Hotel projects: durability and repeat detail come first

A hotel door is opened and closed thousands of times per year, cleaned with chemicals, and hit by luggage trolleys at handle height. On hospitality work we specify around three questions:

1. Can the detail be repeated without drift?

Guest-room doors are produced in batches against one approved sample. Once the client signs a physical sample — leaf, frame section, architrave and a finish board — subsequent batches are matched to that reference. That single step prevents the "different shade on level six" problem that appears when doors ship across several container loads.

2. Does the leaf take the hardware?

Moulded and profiled decorative faces limit where lock bodies, hinges and closers can sit. We mark hardware positions on the shop drawing and confirm the stile width at each position before the panel is pressed, so a closer plate never lands on a shallow moulding.

3. Is the interface with the wall build documented?

Concealed and flush details depend entirely on the wall they are built into. Frame type, anchorage, and the reveal tolerance have to appear on both our drawings and the wall contractor's, signed by both sides. We produce those coordination drawings as part of the design stage.

Villa projects: continuity with joinery and flooring

In a private villa the door is read against other timber surfaces — wardrobes, wall panelling, skirting, stair balustrade and engineered flooring. Two decisions carry most of the visual result:

  • Match the wood species and cut, not just the colour. A veneer door in a different grain cut from the panelling beside it will look wrong even when the stain matches. We order door veneers against the joinery reference so grain direction and figure are consistent.
  • Set the threshold and floor levels early. Villa floors change with stone, timber and carpet zones. Undercut height and leaf height should be fixed once the floor build-up is settled on the drawings, not measured on site after plastering.

For whole-house work we usually package doors together with Interior Fixtures such as wardrobes and vanities, which removes the finish-matching argument between separate suppliers.

The specification path from enquiry to site

Because doors are made to measure, the order only moves when each stage is signed. Our normal sequence on a hotel or villa project runs:

  • Brief and schedule. Door schedule, drawings, finish references and quantities by room type.
  • Shop drawings. One drawing per door type showing leaf construction, frame profile, hardware set, and interface with wall and floor.
  • Samples. A physical sample of the approved detail for client sign-off before batch production.
  • Production and inspection. Batch production against the signed sample, with dimensional checks on frame and leaf before packing.
  • Packaging and shipping. Frames, leaves and architraves are packed by room type or floor so the site team can follow the schedule instead of sorting mixed crates. Our Logistics & Door-to-Door Delivery service handles freight, customs paperwork and container loading plans.
  • Installation and snagging. Hanging, adjustment and finish repair on site, coordinated with the decorating sequence so doors are hung before final paint touch-in where the detail allows.

For projects that need a non-standard profile, size or finish outside our standard decorative range, our Custom & OEM Service covers bespoke design and prototyping with the client's drawings.

Common mistakes we see on door packages

  • Ordering doors off a plan without opening sizes. Plan symbols show location, not size. Without measured openings and floor levels, every leaf is a guess.
  • Leaving concealed doors to the last minute. Concealed frames must be built into the wall before lining. If they arrive after plasterboard, the wall has to be reopened.
  • Splitting doors and panelling between two suppliers. Both parties then draw their own edge detail and neither matches. One supplier owning the combined drawing removes the gap.
  • No signed physical sample. A colour on a screen is not a specification. Approve a real sample of leaf, frame and finish before batch production.
  • Packing without a room schedule. Mixed crates turn a six-week hang into a two-month job while teams hunt for the right leaf.

Questions buyers ask us about decorative doors

Can decorative interior doors be made to non-standard heights?

Yes. Every door in this collection is made to measure, including tall and floor-to-ceiling leaves. Confirm the finished floor level and the wall build-up before the size is fixed.

Can the door finish match our wardrobes and wall panelling?

Yes, when the joinery reference is available at quotation stage. Send the species, cut and finish system used on your cabinetry package and we will quote the doors against it.

Do you supply hardware with the doors?

Hardware positions, cut-outs and hinge prep are set out on the shop drawing. Which ironmongery is supplied depends on the project; we confirm that in the quotation so nothing is assumed.

How are doors protected during ocean freight?

Leaves, frames and linings are packed separately with edge protection and labelled to the door schedule. Loading plans are prepared before the container is stuffed, and cargo insurance options can be arranged.

Send us your door schedule. Share drawings, opening sizes and finish references for your hotel or villa project and we will return shop drawings and a quotation for the full decorative door package.