A corner unit looks simple on a drawing and then turns into the hardest item in the room on site. The wall angles are never quite square, the vanity or basin next to it is already fixed in place, and the storage you wanted behind the door suddenly loses half its depth. That is exactly why Santerson Corner Storage is made to measure rather than sold in set sizes — and exactly why it still needs a written installation plan before production starts. Below is the checklist we work through with architects, builders and procurement teams on residential bathroom projects, and what each line item changes on site.
Why corner storage is planned differently from a straight run
A straight cabinet only has to fit one wall. A corner unit has to reconcile two, and everything that follows from them: the door swing, the towel rail, the basin or vanity it sits beside, the mirror above it and the tile line behind it. Two problems repeat on almost every project.
First, existing walls are rarely at a true 90 degrees. On a new build the deviation is usually small but real; on a renovation of an older villa it can be large enough that a standard-size unit simply will not sit flush. Second, dead space. A corner that is planned as one open box wastes the area closest to the wall junction — you cannot reach it without leaning into the cupboard. Both problems are solved at the drawing stage, not on site, which is why we ask for the plan before we quote.
What goes into the plan
1. Survey dimensions taken from finished surfaces
Measure to the finished face of the wall, after tile, plasterboard or cladding — not to the structural substrate. Record both leg lengths of the corner, the room height at that corner, and the actual angle if it is out of square. Note skirting, cornices, architraves, pipes, sockets, switches and any towel rail or mirror position within the unit footprint. If the corner sits next to a basin, toilet or shower screen, give us the centre lines and projection of those items so we can keep doors and drawers clear.
2. A written list of what has to fit inside
Storage that is planned around a photograph rarely works. List the actual items: towels folded and rolled, bath products in bulk, cleaning supplies, hair tools, linen, medicines that need to be out of children's reach. That list decides the shelf spacing, whether you need drawers instead of shelves, and where an adjustable shelf is worth having. It also decides whether a closed corner unit is the right answer at all, or whether Santerson Corner Open Shelving serves the room better — open shelving suits frequently used items and displayed pieces, while closed units hide clutter and hold dust-sensitive stock.
3. Access type and door geometry
Decide how the corner is opened before finishes are chosen. A hinged door on the bias line gives a wide opening but needs clearance to swing; a pocket or sliding front saves that swing space but reduces access to one side; drawers in a corner need their runners kept clear of the adjoining wall. Where the unit stands full height, Santerson Corner Tall Cabinets let us put everyday items at reachable heights and reserve the upper zone for stock you fetch a few times a year.
4. Materials and finishes matched to bathroom humidity
A corner unit in a bathroom sits against two cold walls where condensation collects, often within splash range of the basin or shower. Specify board and finish choices for that environment rather than copying whatever was used in the bedroom, and confirm the edge treatment and hardware finish with us at the same time as the door colour so the whole set is ordered together.
5. Services, fixing substrate and level
Mark out concealed pipes, cables, underfloor heating zones and any wall that cannot be drilled into. Tell us where a solid batten or backing is needed for a wall-hung fix, whether the floor is level across the unit footprint, and whether tile will run behind the carcass or stop at it. These three details decide whether installation takes half a day or two.
6. Interface details with adjoining work
Write down who is responsible for each junction: the scribe to the tiled wall, the sealant line at the basin, the transition to flooring, and the gap above the unit if a ceiling cornice runs through. Unassigned junctions are where corners fail inspection.
7. Delivery route and sequencing
A made-to-measure carcass cannot be cut down on site, so check that it will pass the stairwell, lift, doorway and corridor it has to travel through. Then set the installation date after wet trades, tiling and paint are finished, but before final fixtures and handover.
The lines we ask you to confirm before production
| Item in the plan | What we need from you | What it prevents on site |
|---|---|---|
| Corner dimensions and angle | Both finished-face leg lengths, room height at the corner, out-of-square reading if known | Carcass arriving too deep or sitting off a non-right-angle wall |
| Internal layout | Items to store, preferred shelf heights, drawers versus shelves | Unusable dead space and shelves set for the wrong stock |
| Door and access type | Hinged, sliding, pocket or open; clearance available for a swing | A door that fouls the basin, mirror or room door |
| Finish schedule | Board, colour, sheen, edge and hardware finish | Mismatch against vanities, wardrobes and doors in the same set |
| Services and substrate | Pipe and cable routes, drilling restrictions, backing for wall-hung units | Drilling into a live service or fixing into hollow wall |
| Junction responsibilities | Who seals, scribes and transitions each interface | Gaps at handover and rework after the crew has left |
| Access route and timing | Largest piece dimensions against stair, lift and door widths; install window | Units that cannot reach the room, or damage to finished work |
How a made-to-measure corner unit is ordered with us
Because Santerson Corner Storage is configured per project — size, layout, material and finish specified for the space — the plan above is what we work from. Send the survey figures and your internal list, and our design team returns a drawing showing the corner geometry, shelf positions, door clearances and finish references. You approve that drawing against your own room dimensions, production starts, and the same specification carries through to packing so that parts are not mixed between bathrooms on a multi-unit job.
For projects where the corner is only one part of a wider fit-out, we usually group it with the rest of the joinery in one package. Storage units, Santerson Utility Tall Cabinets, vanities and wardrobes made to the same board and finish schedule avoid the mismatch you get when each item is bought separately. That grouping also lets us consolidate freight into one coordinated delivery.
Installation-day checklist
- Check the delivered unit against the approved layout drawing before unpacking on site.
- Confirm the corner angle and leg lengths on site against the survey; flag any deviation before fixing starts.
- Lay and pack the base level along both legs, not just one.
- Fix to the prepared substrate only, keeping clear of marked services.
- Set doors and drawers for an even reveal, then operate every front with the room door, basin and mirror in place.
- Scribe and seal the wall junctions to the agreed responsibility split.
- Load shelves with the intended stock and check for deflection or rubbing before sign-off.
Send us the corner first. Two leg measurements, a room height and a list of what you need to store are usually enough to start. We will come back with a dimensioned layout you can check against your bathroom plan before anything goes into production.
Share your drawings through our Interior Design Services page, or use the contact page for a quotation on corner storage and the rest of the joinery package in the same project.