A swim spa quotation is only as good as the brief behind it. Two buyers can both ask for Outdoor Swim Spa WS-PC05ST-L and receive very different prices, because the shell is only part of the package — pumps, heat, filtration, insulation, access and freight are all configured separately. This guide sets out exactly what a manufacturer needs from you before it can price this model properly, and what comes back in return.
Start with the standard specification
The published catalogue entry for WS-PC05ST-L gives a fixed starting point. Put these figures in your enquiry so the supplier is quoting the same base unit you are looking at, not an approximation:
| Item | Catalogue specification |
|---|---|
| Shell dimensions | 5490 × 2400 × 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Water jets | 6 pcs |
| LED lights | 4 pcs |
| Total power (as listed) | 6.55 kW |
Note two things in that table. First, the water pump is not listed for this configuration, so it must be quoted separately or confirmed as included. Second, the 6.55 kW figure reflects the equipment shown on the catalogue page; add a heat pump or a different pump and the electrical load changes. A quotation that ignores these details will look cheap and then grow later.
Site access and installation conditions
A 5.5-metre shell arrives as a large module, so the supplier needs to know how it reaches its final position before quoting transport and handling. Send:
- a plan or photographs of the site — terrace, deck, sunken pit or ground-level pad — with the clear opening widths along the delivery route;
- the prepared base details: slab, pedestals or frame, and who is preparing it;
- whether a crane, tail-lift or manual carry is likely to be required, and any access restrictions such as gates, overhead wires or upper-floor rooftops;
- local climate context if the spa will run outdoors year-round, since insulation and cover options are chosen around it.
Power and services
- Supply available on site: single-phase or three-phase, voltage, and the distance from the breaker panel to the spa;
- who provides the dedicated circuit, isolator and earthing — usually the buyer's electrician, to local standards;
- drainage and water fill arrangements, and whether you want the ozone system kept as listed or UV sterilization added;
- heating intent: heated year-round, warm-season use only, or a heat pump versus standard heating — this is usually the single largest price variable.
Configuration and optional accessories
The catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options for this range, with availability varying by model. Tell the supplier which of these you want included, and confirm the selected configuration in writing before production starts. The same applies to finish details — cabinet or cladding colour, step orientation, cover type — because a change after order confirmation is a re-manufacture, not an edit.
Commercial and logistics terms
- Quantity: one villa unit or several for a hotel, resort or development; multi-unit orders are packed and shipped differently;
- destination address and preferred Incoterms — the manufacturer arranges sea, air or rail freight with customs paperwork and door-to-door delivery, but duties and import terms are settled case by case;
- delivery window tied to your site programme, so production scheduling can be planned backwards from it;
- whether you also want installation support, snag inspection and spare-parts arrangements covered in the same package.
Why this detail pays off with a one-stop supplier
SANTERSON has manufactured furniture and building materials for projects since 2008, and works as a one-stop furniture and building materials supplier — the same team that quotes your swim spa can coordinate the surrounding poolside furniture, pergolas, bathroom ceramics and interior fit-out on one set of drawings and one shipment. For villas and hospitality projects, ordering the spa together with the outdoor collections around it means a single production schedule, consolidated container loading and one point of accountability from design through to installation and after-sales support.
Before you send the enquiry, gather:
- model reference (WS-PC05ST-L) and confirmation of the catalogue specification above;
- site photographs, access route and base preparation plan;
- electrical supply details and who supplies the circuit;
- chosen options: pump, heat pump, insulation, UV, sand filtration, steps, cover;
- quantity, destination, Incoterms and required delivery date;
- any adjacent products you want quoted in the same package.