A mirror cabinet quote looks complete at first glance: a photo, a size, a price. Then the site team opens the box and finds the wrong suspension detail, an unspecified light output, or a finish that does not match the vanity beside it. Below is the line-by-line review we recommend before you approve any quotation for our Santerson LED Mirror Cabinet.

Why mirror cabinets attract change orders

Mirror cabinets sit at the crossing point of joinery, glazing and electrical work. A cabinet ordered to a nominal size may clash with the basin tapware behind it, a tiled return wall, or the door swing. Lighting added on site later rarely matches the colour temperature already specified elsewhere in the bathroom.

Our mirror cabinets are made-to-measure rather than catalogue-fixed. Finish, layout and dimensions are specified per project, which means a quote is only useful when it states exactly what has been configured. A quotation that reads "1 unit, LED mirror cabinet, as photo" leaves every decision open, and each open decision becomes a possible variation later.

Read the scope line before the price line

Compare quotations on scope first. Two suppliers can quote the same product at very different prices because one has included what the other has left out. Put each quotation into the same columns and you will usually find the cheaper offer is simply the less complete one.

Quote lineWhat a usable quotation states
DimensionsHeight, width and depth, plus which face the measurement refers to. For our range this is made-to-measure sizing, so the drawing dimension and the quote dimension must be the same number.
Mirror and glazingMirror type and edge treatment; whether side or return panels are mirrored, clear or in a selected finish.
Cabinet bodyCarcase and door material, the exact finish name, and the internal layout: shelf heights, drawer count, and any tall or full-height configuration.
LightingWhether lighting is integrated into the cabinet or ordered separately, together with the electrical specification to be confirmed for the project.
HardwareHinge or slide type, opening direction, and handle or handleless detail.
MountingSuspension method, fixing centres, and any reinforcement the wall build needs to carry the unit.
PackagingPack list, piece count per unit, and protection standard for glazed components in transit.
Commercial termsCurrency, unit basis, tooling or sample charges, payment terms, and the delivery term stated on the quote.

The electrical line is where most people stop reading

An LED mirror cabinet carries a light source, so the quotation should not be silent about electricity. Before you sign, ask the supplier to confirm:

  • The supply voltage and frequency to be quoted for the destination project.
  • Where the connection point sits relative to the cabinet, and whether a driver or transformer is included in the price.
  • Whether the light output is front-facing, perimeter, or integrated into the cabinet body — our Santerson Integrated Cabinet Lighting is a separate configurable item, so check whether your quote covers it.
  • Switching arrangement: a local switch, a wall plate, or control from an existing circuit.
  • Replacement route for the light source and driver after handover, and which component is treated as a spare part.

Lighting and electrical specifications are confirmed project by project on our side. If your quotation does not record them, request a revised version rather than resolving it in an email thread that nobody reads during installation.

Match the cabinet to the rest of the bathroom package

A mirror cabinet rarely stands alone. Where the quote also covers vanities, order the mirror cabinet and the vanity against one drawing set with one finish reference. If your project uses a Santerson Double Vanity, the carcase colour, handle detail and shadow gap should be quoted as a matched pair, not chosen twice by two different purchase orders.

The same applies to lighting. Where a separate fitting is used above or beside the mirror — for example our Vanity Lighting range — record the colour temperature in one place and apply it across both items. Mixed colour temperatures are one of the most visible defects in a completed bathroom.

If storage needs exceed what a standard unit offers, ask for the quotation to show the alternative configuration explicitly. A Santerson Tall Mirror Cabinet changes the wall loading and the fixing detail as well as the price, and both should appear on the paper.

Ask what is not in the box

Every quotation has exclusions. Ask for them to be listed rather than inferred. Typical items to confirm:

  • Whether electrical connection on site, including any licensed work, sits with the supplier or with your contractor.
  • Whether wall preparation and any reinforcement are included before the unit arrives.
  • Whether basin and countertop fit has been checked against the cabinet dimensions you quoted.
  • Who carries the risk of transit damage on glazed items, and how replacement is handled.
  • Which documents arrive with the goods: packing list, installation detail, and fixing specification.

Confirm the numbers before production starts

For a made-to-measure item, the approval stage is the control point. Ask for a dimensioned drawing showing the mirror cabinet in relation to the basin, the mirror centre line relative to the vanity, and the electrical outlet position. Sign that drawing, not the price sheet. Once production begins, a dimension change affects both cost and delivery date.

Where your project also involves other bathroom fixtures — ceramics, showers or cabinetry — consolidating the specification review across those categories reduces the number of separate approvals and gives you one coordinated set of dimensions to build around.

A quick pre-approval check

  • Dimensions on the quote match the signed drawing, not a catalogue size.
  • Finish name is written in full and matches the vanity package.
  • Lighting source, voltage and connection position are stated.
  • Fixing method and required wall support are recorded.
  • Exclusions are listed, including on-site electrical work.
  • Pack list and piece count are shown for each unit.

Send us your mirror cabinet enquiry

Share the bathroom layout, the vanity specification and the destination country, and we will return a configured quotation for the Santerson LED Mirror Cabinet with dimensions, finish and electrical details stated line by line — along with matching vanities, storage and lighting from the same project package. Contact: PHILLIP, +86-13928214007, santerson@qq.com.

Configurations, finishes and technical details are confirmed per project against the approved drawing before production.