A concealed door looks simple from across the room. That is exactly why it is easy to specify badly. The information below lists the project details that decide how a Santerson Decorative Concealed Door is made, priced and installed, so your enquiry can be answered with a usable quotation instead of another round of questions.

Start With the Opening, Not the Finish

Decorative concealed doors in this range are built to project-specific dimensions rather than stock sizes. Before any surface decision is made, the opening needs a settled line and level condition on site: clear width and height of the finished opening, the thickness of the finished wall build-up on both faces, and the floor finish level at the threshold if the door hangs with a bottom clearance. A change to the wall build-up after production begins — a thicker plasterboard skin, an added insulation layer, a different tile bed — is the most common reason a flush door stops sitting flush.

Send dimensions taken from the completed shell, not from the earliest architectural drawing, and note where those dimensions are still provisional. If a wall on one side of the opening is still being set out, say so in the enquiry; it changes what can be confirmed at quotation stage.

Decide How Visible the Door Should Be

Within the Flush / Concealed Doors collection there are two clearly different intentions, and choosing between them early avoids rework:

  • A decorative concealed door carries a deliberate surface treatment — a panel pattern, moulding or decorative finish — so the leaf reads as part of the wall design while remaining aligned with it.
  • A Santerson Handleless Concealed Door removes the visible handle entirely, so the opening line is the only clue that a door exists.

Where the brief calls for an aligned leaf with visible hardware rather than a decorative face, Santerson Flush Hinged Doors and Flush Wall Aligned Doors sit in the same collection and are quoted on the same dimensional information. For bedrooms and dressing areas, matching Santerson Wood Veneer Hinged Doors allow the door face and the surrounding joinery to be specified in one veneer specification.

Specify the Face Finish Against Its Neighbours

A concealed door is judged against the wall it disappears into, so the finish decision is really a wall decision. Tell us what the surrounding surface will be — painted, wallpapered, veneered, laminated or panelled — and which side of that junction the door edge should read as continuous. Finish and material options are specified per project, and the same leaf can be ordered in different face treatments for different rooms on one job.

Two practical details matter more than they appear to: whether the finish is applied before or after the leaf is assembled, and how the chosen treatment behaves at a long, straight edge. A pattern that repeats, such as a moulded panel layout or a directional veneer figure, needs the swing direction and opening width fixed before it can be laid out.

Fix the Hardware Intent in Writing

Detail to confirmWhy it affects the selection
Handle or no handleDetermines whether a decorative concealed leaf or a handleless concealed leaf is specified, and where any pull or finger detail sits.
Swing direction and hinge sideSets the leaf layout, the visible edge and the position of any concealed hardware.
Single or double leafA wider opening changes both the make-up of the leaves and the alignment detail at the meeting stile.
Hinge type and loadLeaf thickness and face build-up influence hinge selection; concealed hinges need their setting-out fixed early.
Threshold and floor levelDetermines bottom clearance and whether a floor spring or offset pivot is workable.

Where the door also needs to match other openings in the same building, list those products together in one enquiry. Doors specified as a group are produced against one set of finish references, which keeps the junctions consistent from room to room.

Say Who Installs and When the Door Reaches Site

Concealed doors fail far more often at installation than in manufacture. Tell us who will fix the frame and hang the leaf, and whether that team has hung this type of aligned leaf before. Our services cover custom and OEM manufacturing, logistics and door-to-door delivery, and installation and after-sales support; which of these you take on a given project changes what we send with the doors and how the packages are labelled.

Delivery sequence is worth planning separately from delivery date. Frames that must be built into a wall go to site before the wall closes; leaves follow later and need secure storage on site. A single consolidated container is cheaper, but it can force frames and leaves to arrive at the same time — an important trade-off on villa and apartment jobs where the wet trades run ahead of joinery.

What a Complete Enquiry Looks Like

For each opening type, send: room and quantity; finished opening width, height and wall thickness; swing direction and hinge side; single or double leaf; handle or handleless; surrounding wall finish and the required door face treatment; who installs; and required site delivery date. Where dimensions are still provisional, mark them as such rather than waiting for a fully settled drawing.

That information is enough to move from an enquiry to a confirmed specification. It also protects the result: a concealed door that has been dimensioned against the real wall build-up, with its finish and hardware fixed on paper, reads as a quiet part of the wall for years.

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, supplying made-to-measure doors, joinery, fixtures and finishes for villa, hospitality and office projects. Send your door schedule or drawings to receive a specification-led quotation.

Email: santerson@qq.com  |  Phone / WhatsApp: +86-13928214007 (PHILLIP)  |  Contact page