A swim spa shell arrives on site in one crate; the finish you actually get depends on a short list of decisions that are easy to leave open in an order. Below is the confirmation checklist we work through with buyers specifying the Outdoor Swim Spa WS-S06 — what is included, what is optional, and what has to be settled before production starts.

Why finish details need to be closed before the order

The WS-S06 sits in our configurable outdoor swim and hydrotherapy range, which means two orders carrying the same model code can end up materially different. Pumps, lighting counts, water features and insulation are all specified line by line, and several of them are options rather than standard items. Once the shell is moulded and the equipment package is booked, changing a jet layout or adding a heat pump late in the schedule costs time on both the factory side and the site side.

For project buyers — villa developers, resort and hospitality fit-out teams — the practical risk is not the spa itself but the interfaces around it: the electrical supply, the deck or platform edge, the drainage line and the delivery route. Each of those depends on a decision that belongs to this confirmation list.

What the catalog lists for WS-S06

Use the published figures as the starting point of the conversation, then confirm them against the configuration you are actually buying. The catalog entry for this model shows:

ItemCatalog listing
ModelWS-S06
Dimensions5820 × 2220 × 1110 mm
Control system1 set
Water pump2 pcs
Filter pump1 pc
Jets56 in total
LED lighting2 lights plus 18 small LED lights
Total power6.35 kW
Features shownWater jets, LED lighting, ozone, waterfall, 4 water columns

Two points deserve attention before anyone treats this table as a purchase order. First, the swim training system is not listed for this model in the captured specifications, so if your brief includes lap swimming or counter-flow resistance, ask explicitly which equipment package covers it and what it adds. Second, "total power 6.35 kW" is the figure for the configuration shown; add a heat pump or change the pump count and the electrical load moves with it.

The finish points to confirm, one by one

1. Equipment package versus options list

Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the question to put in writing is simple: for the WS-S06 configuration being quoted, which of those seven items are included, which are priced separately, and which are not offered? A quotation that says "ozone system" without saying whether it is the generator, the dosing line or both leaves a gap someone will discover at handover.

2. Jets, water columns and waterfall

Fifty-six jets can be arranged in very different ways. Confirm the jet layout on the drawing, not just the total count: which seats carry the hydrotherapy clusters, where the massage positions sit, how the four water columns are fed, and whether the waterfall is a full-width spillway or a narrower feature. Jet material and finish — stainless, chrome, colour-matched trim — also affect how the interior reads once the water is off.

3. Lighting specification

The listing shows two main LED lights plus eighteen small LED lights. Confirm placement (interior shell, water features, perimeter), whether colour changing or fixed white is specified, and how the fixtures are controlled — from the same control system as the pumps, or on a separate circuit. Lighting on an outdoor spa is a low-voltage safety item, so ask for the fixture rating and the wiring route as part of the same confirmation.

4. Shell colour, surface and trim

Acrylic or gel-coat shell colour, the finish of the cabinet cladding, and the trim profile where the shell meets the deck are the three items that most often get decided by a single reference photo. Ask for the actual colour code or sample reference, and for a detail drawing of the coping and skirt so the cladding material you intend to use on site matches the factory edge.

5. Insulation and heat management

Insulation appears in the options list rather than as an automatic inclusion. If the spa will run year-round or in a cooler climate, confirm what insulation is specified for the shell and cabinet, whether a cover is included, and how the heat pump — if ordered — connects to the existing plant room or electrical panel.

6. Filtration and water treatment

One filter pump is listed as standard; sand filtration and UV sterilisation sit in the options. Confirm which combination your quotation carries, where the filter equipment will be located relative to access for servicing, and what the maintenance interval looks like for that combination.

7. Access and site finishes

Steps are listed as an option. Confirm whether they are factory-built, site-built to a drawing, or omitted in favour of an integrated deck entry. This decision changes the platform dimensions, so it belongs in the same conversation as the deck layout.

Electrical and delivery details that ride on the same list

Total power for the configuration shown is 6.35 kW, but the supply your site provides has to match the finished specification, not the catalog default. Confirm voltage and phase for your country, circuit sizing, protective device requirements, the location of the control panel, and who is responsible for the final connection — usually your local contractor, with our team providing the requirement sheet. Buyers importing into Australia should treat local electrical and building requirements as a matter for their own engineer or certifier; we supply product data and configuration details, and your consultant signs off on compliance.

Delivery is handled through our logistics and door-to-door delivery service — freight forwarding by sea, air or rail, packaging and container loading, customs paperwork and tracking. For a spa this size, confirm the crate dimensions against the access route, the crane or forklift needed at the drop point, and the sequence between the spa arriving and the deck being finished.

How we take an order through to handover

As a China-based furniture and building materials manufacturer and one-stop project supplier, SANTERSON has been producing for villa, hospitality and office projects since 2008. A swim spa usually travels with the rest of the outdoor package — loungers, dining sets, pergolas — so it is specified through the same route as everything else in the project: brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. Through our custom and OEM service, material finishes and configuration can be adjusted to a project's specification sheet rather than a catalog default. After delivery we support on-site installation, inspection and snags, warranty coverage and spare parts under installation and after-sales support.

A short confirmation sheet to send with your enquiry

  • Configuration list: which pumps, jets, water columns, waterfall, ozone, lighting are included in the quoted price.
  • Options required: heat pump, UV sterilisation, sand filtration, insulation, steps, additional control system.
  • Shell colour and cladding finish, with reference codes or samples.
  • Dimensional drawing for the platform, coping detail and access route.
  • Electrical data: voltage, phase, total load for the finished specification, control panel location.
  • Delivery terms, crate dimensions, unloading method at site.

Figures above are transcribed from the published catalog entry for WS-S06 and describe the configuration shown there. Included equipment, options and electrical requirements vary by configuration — confirm them in writing with our team before production begins, and have local building and electrical requirements checked by your own engineer or certifier.

Specify a WS-S06 for a villa or resort project?

Send us the model code together with your site's voltage and access notes, and we will return an itemised configuration sheet — what is included, what is optional and what your contractor needs on site. Contact SANTERSON (PHILLIP), phone / WhatsApp +86-13928214007, email santerson@qq.com, or use our contact page.