A swim spa quotation only works when the buyer and the factory are reading the same document. This guide walks through the specification sheet for Outdoor Swim Spa WS-PC06ST-L, one of the longer models in our configurable swim and hydrotherapy range, and shows purchasing teams exactly which fields to lock down before a villa, resort or private residence order is placed.
Start with the shell dimensions, not the features
The first line of any specification should be the external envelope of the vessel. For WS-PC06ST-L the catalogue lists 6390 × 2400 × 1470 mm (length × width × depth). Those three numbers drive everything downstream: the deck or plinth you build, the clearances your designer needs for access and maintenance, the truck and container plan, and whether the unit can be lifted into position at all.
Write the dimensions as catalogue figures first, then add a line confirming how they were measured — overall shell versus internal water volume. On a project order we always ask the buyer to confirm the foundation drawing against the final production drawings rather than against the brochure image, because site preparation is where most swim spa programmes lose time.
Read the standard equipment list line by line
The captured specification for this model is short enough to serve as a working template. Each row below is a field you should see spelled out in a quotation, with quantity and unit, not bundled into a single "standard package" price.
| Specification field | Value shown in the catalogue | What to confirm on your quotation |
|---|---|---|
| Model code | WS-PC06ST-L | Exact suffix, including the -L length variant |
| Catalogue dimensions | 6390 × 2400 × 1470 mm | Measurement basis and tolerance for site prep |
| Control system | 1 set | Controller type, display location, language of the interface |
| Swim training system | 1 set | Counter-flow unit layout and the swim lane it occupies within the shell |
| Water pump | Not listed for this model in the captured specification | Whether a jet pump is included, and its rating, for your configuration |
| Filter pump | 1 pc | Filtration cycle time and cartridge or sand media choice |
| Jet total | 6 pcs | Jet positions and seat/lay-up arrangement they serve |
| LED lights | 4 | Fixture positions, colour options and control method |
| Total power | 6.55 kW | Whether the figure covers heating or only the equipment set fitted |
| Features shown | Water jets, LED lighting, Ozone, Swim training system | Which of these are standard and which are priced options |
The "water pump — not listed" row deserves particular attention. It is a genuine gap in the catalogue record for this model, and it is exactly the kind of line item that turns into a change order later. Ask us to state explicitly whether a jet pump is fitted, at what rating, and how it relates to the swim training system, before you sign.
Separate the standard build from the options list
Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option you see on one datasheet is not automatically available on another length in the same family.
For buyers, the practical distinction is this: items that change the shell or the plant room need to be fixed before production starts, while some accessories can follow. Insulation and heat pump selection affect running behaviour in cooler climates and should be decided early. Steps, by contrast, are often site-adjusted. Put both in the specification anyway — a blank option column invites an assumption, and assumptions get disputed at handover.
Power and electrical coordination
The catalogue total power figure for WS-PC06ST-L is 6.55 kW. Treat that as the starting point for an electrical discussion, not the end of it. Your local electrician needs the final fitted equipment list — including any heat pump or additional pump added as an option — to size the supply, protection and cabling to the standard applicable at the site. We confirm the electrical requirements for the selected configuration; the site-side compliance work is yours.
Compare within the family before you fix the length
Length is the main decision in this range, and it is easy to over-specify. The same PC06 shell family lists WS-PC06ST at 5900 × 2400 × 1470 mm with the same equipment set — control system, swim training system, filter pump, six jets, four LED lights and 6.55 kW total power — so if your site cannot absorb the extra half metre of shell, you lose the swimming lane length but not the hydrotherapy package.
If jet count matters more than swim length, the picture changes again. WS-PC06CH is a different shell entirely: 6000 × 3000 × 900 mm, two water pumps, thirty-eight jets and one LED light at 3.25 kW total power, with no swim training system listed. A spa-focused family member and a swim-focused family member answer different briefs; putting the wrong model code on a drawing is a costly correction.
Where the standard shells do not fit the site or the concept design at all, our Customizable Shape Outdoor Spa route covers personalised hydrotherapy pools shaped to the terrace, and our wider Swimming Pools and Swim Spas range covers longer swim channels with separate relaxation areas.
Match the swim spa to the rest of the outdoor package
A swim spa is rarely ordered alone on a villa or resort project. Decking, loungers, shade and storage are specified around it, and the same coordination problem appears in every one of those categories: material choice, exposure and maintenance access have to be decided together. That is the same logic we apply across our Outdoor Furniture for Villas and Resorts collections — aluminium frames, rope weave, wicker and teak-look tops each behave differently in a poolside setting, so the specification should say which material is being quoted rather than leaving it to a photograph.
For buyers assembling a whole outdoor zone in one purchase order, specifying the swim spa and the surrounding patio furniture against the same drawing set avoids the classic mismatch: a lounger layout that blocks filter access, or a pergola post that lands where the plant room needs to be opened.
A six-point checklist to send with your enquiry
- Model and variant: WS-PC06ST-L, written in full, with the catalogue dimensions 6390 × 2400 × 1470 mm quoted beneath it.
- Equipment set: control system, swim training system, filter pump, jet count and LED count as separate priced lines — plus an explicit answer on whether a water pump is fitted.
- Options: heat pump, UV sterilization, sand filtration, insulation and steps marked included or excluded, each with its effect on total power stated.
- Site interface: foundation or deck drawing, access route for delivery and setting, and the electrical supply your site can provide.
- Delivery terms: port of destination, delivery address and who handles setting the unit into position.
- Documentation: as-built specification, wiring diagram and equipment list to be issued with the shipment.
Send those six points and the quotation comes back comparable. Buyers who compare two suppliers on price alone usually discover, too late, that one quotation included a heat pump and insulation and the other did not.
How our team turns your specification into production
SANTERSON has operated since 2008 as a China-based manufacturer and one-stop supplier of furniture and building materials for hospitality, villa and office projects. For a swim spa order that means the same coordination we run across every other product group: design consultation and space planning, material and product specification, manufacturing with quality control, project management and site coordination, then delivery and installation support.
If your project needs the swim spa alongside cabinetry, outdoor furniture, lighting or finishes rather than as an isolated purchase, our Custom & OEM Service and Logistics & Door-to-Door Delivery cover the specification, freight and handover stages in one programme. Enquiries receive a response within 24 hours during our business week.
Send us your swim spa specification. Include the model code, the site drawing and the option list above, and we will return an itemised quotation for WS-PC06ST-L or the closest fit in the range.
Contact: PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com · Contact page