A swim spa that looks identical in two suppliers' catalogues can arrive with different pumps, a different jet count and a very different electrical load. Before you raise a purchase order for Outdoor Swim Spa WS-PC04CH, the comparison work is not about photos — it is about which items are included in the price, what your site has to supply, and how the model sits alongside the rest of the configurable range. The notes below follow the specification sheet published for this model so you can put every supplier quote on the same page.

Start with the footprint: 4500 × 3000 × 900 mm

The catalogue dimension for WS-PC04CH is 4500 × 3000 × 900 mm. That length puts it between the compact square units in the same family and the longer 6 m models, so the first thing to check is not the spa itself but the pad, clearance and access route around it.

  • Structural support. Confirm with your structural engineer what a full shell of this plan area weighs when wet, on your slab, deck or terrace structure. Do not assume an existing patio carries it.
  • Water depth versus height. The 900 mm figure is the catalogue height for this configuration; confirm the water line and overflow arrangement with the factory before you set finished floor levels around the shell.
  • Access and delivery. Measure gates, side passages and turning radii from the truck drop-off to the final position. A unit that fits the plan drawing but not the site access is a crane or re-quote problem.
  • Plant and service access. Leave room for the filter pump, control system and routine servicing. Decide now whether equipment access will be through a removable lid, a side hatch or an adjacent plant cupboard.

Compare what is actually in the specification

The published specification for this model lists one control system, one water pump, one filter pump, 46 jets in total, one LED light and a total power figure of 2.45 kW. Water jets, LED lighting and ozone are shown as the features fitted to this configuration. When you compare two quotations, put those seven lines side by side before you compare prices — that is where "same model, different price" usually comes from.

Specification lineShown for WS-PC04CHWhat to confirm on the quote
Catalogue dimensions4500 × 3000 × 900 mmWhether the quoted unit matches this configuration exactly, including shell and cabinet finish
Control system1 setWhich controller, what it operates, and whether a spare or extension is included
Water pump / filter pump1 pc eachPump make, output and duty; how many pumps are needed for your usage pattern
Jet total46 pcsJet layout and seating positions served, not just the headline count
LED lights1 pcPosition of the fitting and whether additional lighting is quoted separately
Total power2.45 kWWhether a heat pump or extra pumps are excluded from this figure
Features shownWater jets, LED lighting, OzoneOzone equipment is listed as fitted; UV sterilisation is an option to confirm separately

One line deserves particular attention: the product page does not list a swim training system for this model. If your brief calls for lap or counter-current swimming, ask in writing what swim current arrangement — if any — is offered with this shell, and get it written into the specification rather than assumed from the words "swim spa".

Check the electrical supply before you sign anything

Total power of 2.45 kW is the figure shown for this configuration, and the catalogue note that comes with it is the one buyers most often skip: confirm included equipment and electrical requirements for the selected configuration. That means your electrician needs a signed specification, not a brochure.

  • Supply voltage and phase required by the selected configuration, checked against what your site already has.
  • Dedicated circuit sizing, protection device rating and cable run from the switchboard to the spa.
  • Whether the quoted price includes any heat pump, and if so how its load is counted alongside the 2.45 kW figure.
  • Who signs off the installation locally — in most projects that is your electrical contractor, working to the rules applying at the site.

A practical test for any quote: if it does not state pump quantities, jet count, total power and the electrical requirement in writing, it is not comparable with another quote yet. Ask for those four items and re-quote on the same basis.

Decide which options you want in the order, not later

The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options across this range. Availability and compatibility vary by model, so each option has to be confirmed for WS-PC04CH specifically.

  • Heat pump. The single biggest factor in running cost for year-round use. Decide whether it is in scope now, because it changes both the electrical design and the budget.
  • Insulation. Relevant in cool-climate villas and in any installation that runs outside warm months; ask what is insulated — shell, cabinet, base — and how.
  • Filtration. The specification shows one filter pump; sand filtration appears as an option, so confirm which arrangement your quote covers.
  • Water treatment. Ozone is shown as a feature of this configuration, while UV sterilisation is listed among the options. Ask what is fitted and what the routine consumables are.
  • Steps and access. Steps affect both entry comfort and the footprint; add them to the plan drawing rather than leaving them to site.

Compare WS-PC04CH with neighbouring models in the range

WS-PC04CH sits inside a configurable swim and hydrotherapy family, and the closest alternatives are worth putting in the same comparison table rather than judging by name. Three points of difference matter most:

  • Plan length. Within the CH variants, Outdoor Swim Spa WS-PC05CH is listed at 5000 × 3000 × 900 mm and Outdoor Swim Spa WS-PC06CH at 6000 × 3000 × 900 mm, both on the same 3000 mm width. If your site allows the extra length, you gain water volume and seating rather than a different product class.
  • Jet count is not proportional to size. The 4.5 m shell carries 46 jets, while WS-PC05CH is listed with 30 and WS-PC06CH with 38. If hydrotherapy seating positions drive your decision, compare jet layout per seat rather than the total figure alone.
  • Pump arrangement changes with size. The larger 6 m model in this group is specified with two water pumps against one on WS-PC04CH, and its total power figure rises accordingly. That difference lands directly on your electrical design and running assumptions.

If the site cannot take a rectangular 4.5 m footprint at all, the same catalogue also carries square formats such as Outdoor Swim Spa WS-PC03 at 3000 × 3000 × 1000 mm, and there is a separate line of Customizable Shape Outdoor Spa units for square, round, oval and curved layouts. Browse the whole Swimming Pools and Swim Spas category before you fix on one shell.

Price it as a delivered project, not as a shell

For a buyer in Australia or elsewhere, the spa is one line inside a longer scope. Ask each supplier to price the same blocks so you are comparing like with like:

  • The spa configuration itself — model, dimensions, pumps, jets, lighting, treatment, and every option selected.
  • Packaging and container loading, plus the freight mode quoted for your port or site.
  • Customs documentation: commercial invoice, packing list and any certificates the shipment will carry.
  • Delivery to site, offloading arrangements and who provides the crane or forklift if access demands one.
  • Site works you are responsible for: slab or pad, power, drainage, water fill, and any enclosure or deck detailing.
  • After-handover support — spare parts availability, what is covered, and how a fault is raised in practice.

Where the swim spa is one item inside a wider villa or hospitality fit-out, it is usually simpler to place it with the same Turnkey Interior Project Solutions package as the outdoor furniture and interior fixtures, so freight, documentation and site coordination run through one channel instead of several. Santerson's published services cover design consultation and space planning, custom and OEM work, production, logistics with door-to-door delivery, installation support and after-sales — useful when you want a single point of contact for an outdoor wet area and the rest of the project.

A pre-order checklist

  • Configuration confirmed in writing: 4500 × 3000 × 900 mm, control system, one water pump, one filter pump, 46 jets, LED lighting, ozone.
  • Swim current arrangement stated explicitly — fitted, offered as an option, or not available for this shell.
  • Total power and the electrical requirement confirmed against your site supply, with any heat load shown separately.
  • All options (heat pump, insulation, filtration type, UV, steps) listed in the order rather than added on site.
  • Site access route measured, and the delivery method agreed before production starts.
  • Freight mode, documents, delivery point and offloading responsibility named in the quotation.
  • Spare parts, warranty terms and the fault-reporting route recorded on the purchase order.

If you would like a specification sheet and a delivered quotation for this model — or a comparison across the CH variants for your site dimensions — send the plan drawing and your location to the SANTERSON team and we will confirm the configuration, options and electrical requirement before production.

Send us your swim spa enquiry

Model of interest, site dimensions, delivery location and how you intend to use it (fitness, hydrotherapy, family use) are enough for a first quotation. Use the Contact Us page, and include your enquiry reference so the team can confirm configuration, options and electrical requirement in one reply.