Flush interior doors look effortless on site: one continuous wall surface, a hidden hinge line, no casing to break the plane. That quiet result is exactly why shortlisting the wrong factory is expensive. The drawing is approved, the panel arrives, and then the reveal depth does not match the wall build, the finish does not match the joinery, or nobody supplied the frame with the leaf. This guide sets out how buyers, contractors and design teams screen manufacturers for Santerson Flush Interior Doors and the matching concealed-door range, using checks you can actually verify before a purchase order is raised.

Start with the door family, not the finish

Flush doors are not one product. Within our catalogue the same wall opening may be served by a hinged leaf that sits proud of nothing, a sliding leaf that runs into a pocket, or a concealed door that carries the wall finish across its face. Each has a different build-up, a different hardware set and a different coordination requirement with the wall trade. Before comparing prices, confirm which family your detail drawing calls for:

A supplier who quotes all of these from one generic spec sheet is telling you something about how the order will be engineered. Ask them to state, per item, the leaf thickness, frame/reveal section, hinge type and number, and what is included in the price.

Six checks that separate a real manufacturer from a trader

CheckWhat to ask forWhy it matters
Made-to-measure capabilityA door schedule with opening width, height, wall build-up and floor finish level per openingFlush detailing fails on millimetres. Standard stock sizes rarely align with a designed reveal.
Material and finish rangeLacquer, veneer, laminate and panel options, plus a physical sample of the exact finishConcealed doors are usually painted or panelled on site; the substrate has to accept that finish without telegraphing joints.
Hardware coordinationHinges, pivot or sliding gear, locks and closers — supplied by whom, and pre-set or looseSplit supply between door factory and hardware vendor is the most common cause of site delay.
Drawings before productionShop drawings for sign-off, showing frame setting, floor levels and ironmongery cut-outsWritten approval at drawing stage prevents a made-to-measure item becoming a bespoke problem.
Project references of the same typeVilla, apartment or hospitality jobs with flush and concealed doors in wet and dry areasA supplier used to loose furniture does not automatically handle built-in joinery tolerances.
Delivery and after-sales scopePackaging, container loading, customs paperwork, spare parts and snag rectificationBuilt-in items arrive late in the programme; a missing hinge set stops handover.

Read the schedule back to them

Once a shortlist of two or three suppliers exists, send the same door schedule to each and compare like for like. Two questions settle most of the argument. First: does the quoted price include the frame, architrave-free detailing where required, and the ironmongery cut-outs? Second: who signs off the setting-out dimensions, and at what stage do they become fixed? A serious manufacturer will push back on a schedule that lacks wall build-ups rather than quietly quoting around the gap.

Where the flush door has to continue a wall panel or media wall, treat it as one line item with the panelling instead of two separate purchases. Our Integrated Door & Paneling work is produced that way — door, panel and finish specified together so the joint between them is designed rather than resolved on site. The same logic applies to Decorative Interior Doors that carry a moulding or veneer pattern.

Why sourcing doors and fit-out together reduces risk

Flush and concealed doors sit at the awkward boundary between joinery, wall finish and hardware. When they are bought from a specialist trading company, that coordination falls to your site team. When they come from the same SANTERSON furniture and building materials operation producing your cabinetry, wardrobes, wall panelling and flooring, the tolerances travel together through one drawing set and one shipment.

In practice that means:

  • Door finishes are matched to wardrobe and cabinet fronts from the same batch of material, not approximated from a colour chart.
  • Floor levels, skirting details and reveal depths are set once across cabinetry and doors.
  • Packaging, freight and door-to-door delivery are handled by one logistics coordinator, so frames, leaves and hardware arrive in the sequence your installer needs them.

SANTERSON has manufactured furniture and building materials in China since 2008, with custom and OEM service covering bespoke sizing, material and finish selection for villa, hospitality and office projects. Flush door leaves are made to measure, with material and finish options and a layout tailored to the project — dimensions and selected specifications are confirmed per project before production.

A shortlist you can act on this week

Send your door schedule to two or three suppliers, then work through this sequence: confirm the door family against the detail; request a written inclusions list per item; ask for shop drawings and the cut-off date for dimension changes; compare finish samples physically; and check what happens when one leaf is damaged in transit. Keep whichever supplier answers the awkward questions with drawings rather than reassurance.

Send us your door schedule. Share opening sizes, wall build-ups and the finish intent, and we will return a proposal for flush interior doors together with the matching panelling, cabinetry and finishes for the same project. Enquiries are answered within 24 hours — contact PHILLIP via our contact page.

Made-to-measure production means every dimension, hinge set and finish is confirmed on drawings before manufacture. Project-specific requirements are verified with your design team at quotation stage.