A wardrobe quotation that looks complete on paper can still leave a buyer holding the risk. Two proposals for the same room, both priced per metre, can differ by a wide margin once fixing details, panel thickness and site preparation are spelled out. If your project includes open storage with a metal structure, this guide walks through the sections of the proposal that decide whether the price is real, and what to ask for before you place an order.
What "Metal Frame Open Wardrobes" Actually Covers
In our catalogue, Metal Frame Open Wardrobes sits in the Open Wardrobes collection. The structure is a metal frame carrying shelves, hanging rails and drawers with no doors on the front. Because there are no door leaves, hinges or sliding tracks, the money moves into the frame, the panels and how honestly the proposal describes them.
Useful comparison points in the same family include Minimalist Open Wardrobes, Wall Mounted Open Wardrobes and Freestanding Open Wardrobes. They are quoted the same way, so a single evaluation checklist works across all of them.
Read the Scope Before You Read the Price
Ask every supplier to quote against the same drawing. If one vendor prices a wall-to-wall, floor-to-ceiling run and another prices a set of standard modules, the difference in price is not a saving — it is a different building.
Before comparing figures, confirm these six items are stated on the paper in front of you:
- The overall run in millimetres — width, height and depth — taken from site survey dimensions, not a typical room size.
- Whether the unit is fixed to the wall, the floor, or both, and what substrate that fixing goes into.
- Panel material and thickness for shelves and ends, stated in millimetres.
- Frame profile size and finish, including how joints are made.
- Which interior accessories are included and which are priced as extras.
- What the price excludes: site preparation, electrical work, plinth or scribe fills, and local installation if it is not supplied.
Section One: Structure, Fixing and Load Path
This is where open wardrobes differ most from closed cabinetry. A door on a wardrobe stiffens the box; without doors, the frame and its connection to the building do that job.
Questions worth putting in writing
- Is the metal frame welded, or mechanically assembled with brackets and connectors? Ask which, and ask for the connector type by name.
- What is the maximum unsupported span between vertical posts before a shelf needs intermediate support?
- For tall runs, is there a top rail or ceiling fixing, and who supplies the packing pieces where the wall is out of plumb?
- For wall-mounted open wardrobes, what is the required wall build-up? A plasterboard skin alone will not carry a loaded shelf run, so the proposal should say whether timber or steel backing is needed and who installs it.
- For freestanding units, is anti-tip fixing included in the price?
If your project mixes open wardrobes with metal-frame shelving on adjacent walls — Metal Frame Modular Systems in our range — ask for one fixing detail that covers both. Different fixing methods on the same wall create visible misalignment and a dispute about who owns the gap.
Section Two: Panels, Edges and Finish
Open wardrobes show every edge to the user. There is no door to hide a rough joint line, so edge treatment belongs in the quotation, not in a later conversation.
| Item | What the proposal should state | Why it matters on site |
|---|---|---|
| Shelf material | Board type and thickness in mm, plus maximum clear span for that thickness | Thin shelves over a long span sag under hanging weight and stacked boxes |
| Edge treatment | Edge band material and thickness, or solid timber edge; state the colour match reference | Exposed edges are the first thing guests and residents touch and judge |
| Frame finish | Coating system and colour reference; for exterior-adjacent or wet areas, the coating type suited to that environment | A generic powder coat is not automatically suitable beside a pool or spa |
| Panel-to-frame junction | Whether panels sit in a channel, sit against a face, or are fixed with visible brackets | Determines the shadow line and how easy damaged panels are to replace |
| Drawer boxes | Box material, runner type and load rating; state which drawers are included | Runners are frequently moved from "included" to "optional" between revisions |
Where the specification calls for wood tones alongside metal, compare Wood Tone Open Wardrobes against the metal-frame version and check that both quotations describe the same board and the same edge detail. A wood-effect laminate on one proposal and a veneered panel on the other are not the same product at different prices.
Section Three: Layout, Access and What Gets Stored
Open storage only works if the layout matches how the space is used. In a residential or serviced-apartment fit-out, hanging length usually beats shelf count. In a spa, gym or poolside changing area, the priority shifts to items that are damp and need air.
- Count the long-hang items in the brief — coats, robes, uniforms — and give them a dedicated rail height rather than sharing one.
- Keep shelves above elbow height clear of small loose items; open shelving collects dust, so plan for trays or boxes.
- Ask the supplier to show shelf pitch on the drawing. If every shelf is at the same height, the layout has not been considered.
- In wet or humid areas, ask which panel and frame finishes are recommended for that environment and get the answer in writing.
Section Four: Commercial Terms That Change the Real Cost
Once the technical description matches, compare the commercial sections line by line. These are the terms that most often move a final invoice.
- Measurement basis. Per linear metre, per square metre or per unit? Confirm what is included in each unit and how corners are measured.
- Survey responsibility. Who takes final site dimensions, and when — before or after wall finishes are complete?
- Re-measurement clause. What happens to the price if the as-built dimension differs from the drawing by a few centimetres?
- Lead time and its starting point. Time is usually counted from approved drawings and deposit, not from purchase order.
- Delivery terms. Port of delivery, who handles customs clearance, and whether the price includes last-mile transport to the site.
- Installation. Supplied by the manufacturer, by a local contractor, or left to you? A low unit price with no installation simply moves the cost elsewhere.
- Spares and replacement panels. Open wardrobes take knocks at exposed edges; ask what replacement panels can be ordered later and for how long.
Section Five: Sample and Mock-Up Before Mass Production
For anything beyond a single room, request one bay as a mock-up. One assembled bay settles three arguments at once: what the frame joint actually looks like, how the edge band reads under site lighting, and whether the shelf pitch works in practice.
- Approve the mock-up in the room where it will be installed, not in a showroom with different light.
- Check the frame finish against your sample board under both daylight and artificial light.
- Load a shelf with the intended items and look for deflection before signing off.
- Record the approved mock-up with dated photographs and reference it in the production order.
Made-to-measure, and what we confirm in writing. Our wardrobe listings are made-to-measure: dimensions, layout, materials and finishes are set per project, so the specification you approve is the specification we produce. Frame type, panel thickness, edge treatment and fixing method should all appear on your approved drawing before production starts. Factory capacity, current lead times, freight cost and warranty terms for your project are confirmed in writing when you enquire, rather than quoted from general figures.
If you are sourcing wardrobes together with other cabinetry, flooring, wall panelling or lighting for one project, consolidating them under a single supplier reduces interface problems between trades. That is the practical reason to buy from a one-stop furniture and building materials supplier rather than collecting separate packages.
A Simple Scoring Sheet
Score each proposal out of five on the items below. A proposal that scores low on structure or finish should not be compared on price at all, because the gap will reappear as variations.
| Criterion | Strong proposal | Weak proposal |
|---|---|---|
| Dimensions | Site-surveyed dimensions on a dated drawing | "Typical wardrobe size" or catalogue widths only |
| Structure | Frame type, joint method and fixing detail named | "Metal frame" with no further description |
| Panels | Board type, thickness in mm and edge treatment stated | Colour name only |
| Accessories | Rails, shelves and drawers itemised, extras priced | "Internal fittings included" |
| Exclusions | A clear list of what is not in the price | No exclusions listed |
| Revisions | Named revision stages with sign-off points | Price valid "subject to final confirmation" |
Frequently Asked Questions
Is a metal frame better than a board carcass for open wardrobes?
It is different rather than universally better. A slim metal frame gives shallower verticals and a lighter look, and it can be tied into metal-frame shelving elsewhere on the same wall. Board carcasses behave differently under load and are fixed to the building in another way. Judge both against your span requirements and the fixing condition of your walls.
Do open wardrobes need a permit or specific fire rating?
Requirements depend on the building type, its use and the local jurisdiction. We do not advise on code compliance. Ask your project's certifying authority or fire engineer which material and finish requirements apply, then send us those written requirements so the specification matches them.
Can we order replacement shelves years later?
Made-to-measure panels are produced to the approved drawing, so keep a copy of it. Send the drawing when you order additions and we can reproduce the panel size and finish. Confirm availability at the time of the original order if long-term additions matter to your asset plan.
How do I compare two suppliers whose prices look nothing alike?
Put both quotations onto one sheet against the six scope items in Section One. Differences usually resolve into three causes: different measurement basis, different panel and edge specification, or one supplier carrying site preparation that the other has excluded.
Send Us the Drawing
If you have a layout, send it over with the room's wet or dry condition and your target completion date. We will return a quotation that names the frame, the panels, the edge treatment and the exclusions, so you can place it beside your other bids without guessing what is missing. As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we also handle wardrobes alongside the rest of the interior package — cabinetry, wall and ceiling finishes, flooring and lighting — through one production and delivery sequence. Enquiries reach our team at santerson.com/contact.