Start With the Room, Not the Wardrobe

A made-to-measure wardrobe is easy to misquote. Send a manufacturer a floor plan with two walls, a note saying "walk-in", and you will get a price for something that is not what you pictured. The brief below is the one we ask buyers on villa and apartment projects to send us when they need L Shaped Walk in Wardrobes or a similar corner layout, because it removes most of the round trips that delay production.

An L shaped walk-in sits into a room corner and uses two walls as hanging runs, with the return leg usually holding shelving, drawers or a dressing island. It works well in a bedroom alcove, a corridor end, or a small box room converted into a dressing space. What makes it tricky to quote is not the shape — it is everything that interacts with the shape: the ceiling height, where the doors and windows swing, what sits above the wardrobe, and how you intend to move through the corner.

Measurements Worth Sending Before You Ask for a Price

Send dimensions as a sketch with numbers on it, not just a list. A drawing lets our design team see why one wall measures shorter than the opposite end of the same run, which is usually a column, a skirting return or an existing door reveal.

What to measureWhy the manufacturer needs it
Length of each wall, corner to each endSets the two runs and where the internal corner carcass falls
Floor to ceiling height at both ends and in the middleOlder villas rarely have level floors or straight ceilings; full-height built-ins need that checked first
Depth available on each legHanging needs clear depth; a shallow leg becomes shelving or a mirror run instead
Position of doors, windows, radiators, switches and power pointsDetermines where a run must stop, step back or drop in height
Obstructions above: beams, bulkheads, ducting, curtain boxesAbove-wardrobe space can be used for storage or left as a reveal
Floor finish and its thicknessAffects whether the carcass sits on a plinth or is scribed to the finished floor
Send photographs of the corner from both ends of the room, plus one close-up of each wall. A phone photo taken standing back, with a tape measure visible against the wall, answers more questions than a dimension list on its own.

Describe how you will use it

Tell us what goes in it: long garments, suits, folded knits, bags, shoes, ironing, a safe, laundry baskets. Hanging height and shelf spacing follow from that list, and so does whether the corner leg is better as drawers or as an open bay. If two people share the space and both need hanging at different heights, say so in the brief — it changes the internal layout more than any finish choice.

Decide how open you want it to be

The same L plan can be built as a fully enclosed dressing room with doors, or left open to the bedroom. Open layouts read larger in a small room and are quicker to walk into; closed layouts hide clutter and keep dust off clothes. Our Open Walk in Wardrobes collection shows what an open corner plan looks like once the rails and shelves are exposed, and it is a useful reference point when you decide which side of that line you want to sit on.

Name the finishes, or ask for samples

Say which surface you want and where: matte, gloss, wood veneer, glass, lacquer. Then tell us what it has to match — an existing kitchen, a door set, a flooring tone. A finish that looks neutral on a screen can clash badly with the flooring in your room, so if you are specifying from overseas, ask for physical samples before signing off rather than relying on photographs.

Drawings: What to Expect Back

Once we have the measurements and the usage list, the first return is normally a layout drawing showing both runs, the internal zoning and the door or panel arrangement. Read it for three things:

  • The clear opening of each door and drawer — can you reach the far corner with a full arm of clothes?
  • Hanging heights and shelf depths, checked against your garment list
  • Where the unit stops relative to switches, skirting and ceiling lines

Ask for an elevation view as well as a plan. A plan tells you where things sit; an elevation tells you how they look from standing height, which is what you will actually live with.

Questions That Save a Redo

These are the points that most often come back as changes after a quotation, so settle them in writing before production starts:

  • Wall construction. What is behind the plasterboard? Full-height units need solid fixing points, and a light partition may need noggins or a different support detail.
  • Level and square. If the corner is not at 90°, say so. Scribing and a bespoke filler panel are normal; assuming a true right angle is what causes gaps.
  • Services. Lighting inside the wardrobe needs a cable run decided before the carcass goes up, not after.
  • Sequence on site. Wardrobes usually come after flooring and painting, but full-height units that meet a ceiling can be installed earlier. Agree where your unit falls in the programme.
  • Access for delivery. Panel lengths, stair widths, lift doors and corridor turns on upper floors all matter once crates arrive.

Working With a Factory on a Made-to-Measure Brief

SANTERSON is a China-based manufacturer of furniture and building materials, working from design consultation and space planning through production, shipping and installation. For wardrobe work this means the brief above goes to a team that also builds kitchens, vanities, doors and wall panelling for the same project — so matching a veneer across your bedroom storage and your interior fixtures is a single conversation rather than three separate ones with different suppliers.

Our walk-in range covers several corner logics beyond the L plan. A U Shaped Walk in Wardrobe wraps three walls and suits a separate dressing room; an island layout puts storage in the middle of the floor. If your room is narrow, the L plan usually wins on circulation. Send the plan and we will tell you which one the room supports.

A Short Brief Template You Can Copy

If it is easier to fill in a form than write a letter, send these lines:

  • Room type and location in the building; project type (villa, apartment block, hotel room)
  • Sketch with wall lengths, depth per leg, ceiling heights at both ends
  • Garment list and who uses the space
  • Open or enclosed; door type if enclosed
  • Finish preference and what it must match, plus samples requested
  • Target installation date and any site constraints on access
  • Drawings you already have, if any — we work from architect plans where they exist

Send your plan, photographs and garment list to our team and we will come back with a layout drawing and a quotation for the corner that fits. Enquiries are handled directly by the project team — no need to have drawings finished first.