A swim spa of this size is not a drop-in purchase. The Outdoor Swim Spa WS-130AⅢ arrives as a reinforced acrylic shell with plant, controls and a swim training system, and it only works on site if the drawings, the supporting base, the power supply and the access route were all prepared before the container left the factory. On villa and resort projects we coordinate this unit together with the rest of the outdoor package — pergolas, loungers, dining sets and outdoor furniture for villas and resorts — so one set of dimensions governs everything. The sequence below is how we take this model from a marked-up plan to a filled, commissioned spa.
What the catalogue sheet actually fixes on the drawing
Two numbers drive every downstream decision: the footprint and the water depth. For WS-130AⅢ the catalogue lists 8000 × 3000 × 1400 mm, so plan an 8 m by 3 m rectangle with 1.4 m of depth, then add working space around it rather than fitting it edge to edge. Set-out dimensions should be taken from the confirmed order documents for your configuration, because the catalogue entry and the detail page can present specification blocks differently, and we do not want a tiler or a concreter working from a screenshot.
The same sheet lists the equipment that has to stay reachable after installation: control system, swim training unit, water pump, filter pump, jets and LED lights. Treat those as maintenance zones, not decoration. A plant or access panel that ends up behind a fixed screen wall or under a tiled overhang will cause a variation later.
| Drawing item | What to confirm before the base is poured |
|---|---|
| Set-out and orientation | Position of the swim lane and the jet end, plus which side the controls and steps sit on. |
| Depth levels | Catalogue depth of 1.4 m against finished deck level; note the height difference for coping and handrail details. |
| Access and clearances | A clear route from the delivery point to the position, plus space around the shell for future servicing. |
| Plant reachability | Pump, filter and control locations kept outside tiled enclosures and away from permanent planting. |
| Electrical provision | Total connected load on the catalogue specification (10.85 kW for this configuration) routed to the correct board, with isolation positioned as the detail drawings require. |
| Deck interface | How coping, timber decking or stone edges meet the shell, and who supplies each part. |
Reading the specification block line by line
The WS-130AⅢ entry lists a control system, a swim training system, one water pump, one filter pump, 20 jets, seven LED lights and a total power figure of 10.85 kW. Read those as the standard content of this configuration, then confirm what is included in your order and what sits on the option list — control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps are all listed as accessories, and availability varies by model.
Two practical consequences follow. First, the electrical design has to match the configuration you actually buy: a build with a heat pump and extra pumps is not the same load as the base specification, and the electrician needs the final schedule, not the marketing page. Second, if your drawings call for a swim training system, check that the model variant you selected carries it. The closely related Outdoor Swim Spa WS-130AⅢ-U shares the same catalogue footprint but is specified with a different jet, pump and lighting package, so substituting one for the other mid-project changes both the plant schedule and the power figure.
Where the standard range does not suit the plan — an irregular terrace, a curved edge, or a spa that has to sit inside a landscaped platform — we look at a made-to-shape unit instead. The Customizable Shape Outdoor Spa covers square, round, oval and curved forms on an acrylic shell, which is often the cleaner answer when the architecture, not the product, should set the geometry.
Site requirements to resolve before delivery
Structure and ground conditions
A filled shell of this size is a heavy permanent load, so the supporting base and any suspended deck need an engineered design from your structural engineer. We supply the confirmed weight, footprint and point-load information they ask for; we do not design the slab. Elevated terraces and rooftop positions are the cases where this coordination matters most, because crane access, pump distance and drainage all change.
Services
- Power: run the supply from the confirmed configuration schedule, with isolation and control access kept clear. The catalogue figure for this model is 10.85 kW; additions such as heat pumps change it.
- Drainage: show the drain route, overflow path and where discharge goes on the landscape drawing, before paving is set out.
- Water fill: identify the fill point and whether a permanent tap or a one-off fill is intended.
- Access for servicing: keep the pump, filter and control zones reachable for the life of the installation, not just on delivery day.
Climate response and local sign-off
Insulation options and cover details affect how the spa behaves in cold nights and hot, exposed sites; choose them with your usage pattern in mind. Local building approval, electrical certification and any pool or spa barrier requirements are handled by your local team — we do not certify compliance for a jurisdiction we are not licensed in, and buyers should confirm those requirements with their own certifier rather than assume they follow from our product data.
Working drawings: the handover list
For a smooth installation we ask the design team for one coordinated pack rather than scattered notes. In practice that means:
- A dimensioned site plan showing the spa position, orientation, coping line and clearances;
- Sections through the shell showing finished deck level, depth and step detail;
- A structural note on the base or pedestal support, signed by the engineer;
- An electrical layout with supply size, isolation point and control location;
- Drainage and fill points marked on the landscape drawing;
- The final equipment schedule for the ordered configuration, including options such as heat pump, UV sterilisation, sand filtration and steps.
If those six items are consistent, delivery is a placement job. If they conflict, the conflict surfaces on site as a variation — which is exactly what our design coordination stage is meant to remove. Our Interior Design Services cover space planning, layouts and 3D renderings alongside production coordination and on-site guidance, so the spa, the deck and the surrounding furniture are resolved against one drawing set.
Coordination through procurement and logistics
Swim spas rarely travel alone on our Australian villa jobs. They arrive with pergolas, loungers, dining sets, cabanas and the interior fit-out, and the value of consolidating that scope is scheduling rather than price: one production window, one packing list, one container plan. As a one-stop furniture and building materials supplier we handle freight forwarding by sea, air and rail with the paperwork that goes with it — commercial invoices, packing lists and certificates of origin — and door-to-door delivery to site. Import terms, duties and transit times are confirmed case by case for each project, since they depend on destination, Incoterms and the rest of the consignment.
Where a project needs branding or non-standard finishes, our Custom & OEM Service covers bespoke material choices, prototyping and private labelling across the wider package, which keeps the outdoor furniture and the water feature visually consistent.
Common coordination failures we see
- The spa is centred on a terrace that cannot take the load. Fix this at concept stage, when changing the position costs a line on a drawing rather than a demolition.
- Coping and paving are set out before the shell dimensions are confirmed. Freeze the set-out from the order documents first.
- Controls end up boxed in. Keep the control system, pumps and filter outside fixed finishes.
- The electrical schedule is written from the wrong variant. Match it to the exact model and option list ordered.
- Steps and access are an afterthought. Entry strategy changes deck levels; decide it with the section drawing.
Practical rule: if your drawings cannot answer footprint, depth, orientation, load path, power schedule and service access in one page each, the spa is not yet ready to order. Ask us for the confirmed dimension and equipment pack for your configuration and mark up against it.
FAQ
Can WS-130AⅢ be installed on an elevated deck?
Yes, subject to your engineer's design for the load and to a workable delivery route. We provide the weight, footprint and support information the design team needs.
What is the difference between WS-130AⅢ and WS-130AⅢ-U?
Both are listed at 8000 × 3000 × 1400 mm, but the equipment schedules differ — jet count, pump quantity, lighting and total power are not the same, and the swim training system is specified on the WS-130AⅢ entry. Choose against your usage, then confirm the final schedule before ordering.
Which extras can be added later?
Options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are listed in the catalogue, but compatibility varies by model. Adding them after the electrical and deck work is complete usually means rework, so decide at drawing stage.
Who handles installation?
We coordinate on-site installation, inspection and handover as part of our installation and after-sales support, with local trades engaged where the site requires them.
Send us your drawings. Share the site plan, sections and equipment schedule for your swim spa position and we will return a confirmed dimension pack, an equipment list for the configuration you are specifying, and a delivery plan that fits your programme — coordinated with the rest of your outdoor and interior package.
Contact SANTERSON: https://www.santerson.com/contact/ | Phone / WhatsApp +86-13928214007 (PHILLIP) | Email santerson@qq.com
Product dimensions, equipment counts and power figures quoted above are transcribed from the SANTERSON catalogue entries for these models. Confirm the final specification with your order documents before issuing construction drawings.