Why the Details in Your RFQ Decide the Final Price

An integrated countertop vanity is not a catalogue item you simply order by model number. The basin, countertop and cabinet are engineered as one unit, so the quotation follows directly from what you specify. Two buyers asking for a "1200 mm vanity" can receive very different prices depending on their substrate, edge profile, storage layout and delivery terms.

A vague request for quote usually produces a vague number, which then moves again once the details surface. A complete RFQ lets our team return a firm figure with fewer rounds of questions. The checklist below covers exactly what to send.

1. Dimensions and the Wall Condition They Sit Against

Send more than an overall width. For each bathroom, provide:

  • The clear wall length the vanity occupies, plus the room depth available in front of it.
  • Finished floor level and the position of any skirting, tile return or recess the unit must clear.
  • Waste and water outlet locations measured from a fixed corner, along with the height of the soil or waste connection.
  • The height of the mirror wall, window sill or cabinet above, so we can confirm clearance for drawers and doors that open downwards.

Made-to-measure sizing is standard on our bathroom vanities, so an unusual length is not a problem — but it must be on paper before the price is fixed. Where a project spans several units, a simple dimensioned sketch per bathroom saves more time than any amount of description.

2. Countertop Material, Thickness and Edge

Because the basin and top are one piece, the surface material drives cost more than anything else in the specification. Tell us:

  • The surface you want — engineered stone, ceramic or a stone and marble surface — and whether the same material should continue to a splashback.
  • The slab thickness you expect at the front edge, and whether you want a square, bullnose or mitred finish.
  • Whether the basin sits as an integrated bowl in the top or as an integrated basin formed with the countertop, since this changes fabrication and the number of pieces to ship.
  • Tapware hole count and drilling positions, including whether you are supplying the mixer yourself or asking us to include it.

If you have a stone sample or a slab reference from your local supplier, send a photograph of it. Matching veining across several bathrooms is far easier when we can see the reference rather than read a colour name.

3. Cabinet Type and Storage Layout

The same countertop can sit on different carcass arrangements, and each quotes differently. Specify which you need:

ConfigurationWhat to confirm in the RFQ
Floor-standing unitPlinth height, door swing direction, whether services are concealed behind doors.
Floating vanityMounting height, wall substrate and whether solid blocking is available for the fixings.
Double vanityBasin spacing, mirror position and how the shared top is jointed if it ships in sections.
Single vanityDrawer stack versus doors, and any internal dividers for tall bottles.

Drawers, soft-close hardware, pull-out organizers and open niches each carry their own line item. Listing the layout room by room — for example "Bathroom 2: three drawers left, one door cabinet right, open shelf at the end" — removes most of the back-and-forth.

4. Finish, Substrate and Hardware

State the panel material and surface you expect, and whether it needs to match joinery already specified elsewhere in the project. Veneer, lacquer, matte laminate and solid timber all behave differently in a humid bathroom, and we will tell you plainly which ones suit the use you have described rather than quote whatever is cheapest.

  • Colour reference: RAL, Pantone or a photograph of an existing sample.
  • Handle style or a request for handleless push-open fronts.
  • Hardware brand preference if your project standard specifies one.

5. Quantities, Schedule and Site Conditions

The commercial side matters as much as the specification. Include:

  • Quantity per configuration, and whether later phases of the project will repeat those units.
  • The date the vanities must arrive on site, working back from your tiling and fit-out programme.
  • Delivery address, access constraints and whether units can be brought in one piece to each bathroom.
  • Whether you want door-to-door delivery handled by us or collection from port by your own forwarder.
A single integrated top that cannot pass through a doorway has to be fabricated and jointed differently. Telling us about the access problem early is cheaper than solving it after production.

6. What We Send Back

Once the RFQ above is complete, expect an itemised quotation covering carcass, top and basin, hardware, packaging and freight, together with a production schedule and loading plan. Where your drawings leave something open — say the waste height or the edge profile — we will list it as an assumption on the quote rather than bury it in the price.

For projects where the bathroom sits inside a wider fit-out, we can also price the surrounding items from the same range: wall and floor tiles, basins, showers, mirrors, vanity lighting, cabinetry and flooring. Coordinating those with one supplier keeps finishes consistent and reduces the number of separate deliveries arriving on site.

Send us your dimensions and finish references. Email santerson@qq.com or contact us on WhatsApp +86-13928214007 (PHILLIP). Share your drawings, a photograph of the wall condition and your required delivery date, and we will return an itemised quotation for review.