A swim spa quote is easy to receive and hard to compare. Two suppliers can send very different prices for what looks like the same 7-metre shell, because the difference sits in the equipment list, the site works and the delivery terms that sit underneath the shell. If you are specifying Outdoor Swim Spa WS-S07B for a villa terrace, a resort garden or a residential development, the quality of your request for quote decides whether the number you get back is one you can actually budget against.

The list below is the information we need from buyers to price this model properly, and it is equally useful as a checklist when you are checking quotes from anyone else.

In short: a usable RFQ for a swim spa states the installation location and access route, the exact configuration of pumps, jets, filtration and heating, the power supply available on site, the civil works each party is responsible for, and the delivery terms at the destination. Everything else in the quotation follows from those five items.

1. Start with the model reference and the configuration you actually want

WS-S07B appears in our catalogue as part of a configurable outdoor swim and hydrotherapy range. The listed shell size is 7000 × 2200 × 1335 mm, and the captured specification sheet for this model shows one control system, three water pumps, one filter pump, 48 jets in total, LED lighting with ozone and a waterfall feature. Those figures are what we quote against by default — they are not a promise that your configuration will read identically, because options change them.

So state the model code exactly as published, then list the options you want on top of it. Our catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options, and availability and compatibility vary by model. A request that just says "7 metre swim spa" leaves the configuration open, and an open configuration is how two quotes for the same project end up with very different totals.

Item to specifyWhy it changes the price
Model code and shell sizeSets the base shell, cabinet finish and transport footprint. Confirm the size against your deck or slab before ordering.
Jet count and jet layoutHydrotherapy intensity affects pump sizing, plumbing runs and total power draw.
Filtration type (cartridge or sand)Different equipment, different maintenance routine, different space needed beside the shell.
Heating method (heat pump or other)Usually the single largest running-cost decision; it also drives electrical sizing.
Insulation packageMatters for year-round use in cooler climates and for energy consumption.
Steps, cover and access itemsOften quoted as extras rather than part of the base unit.
Water features such as waterfall, LED and ozoneEach adds equipment and control wiring; confirm what is included versus optional.

2. Tell us where it is being installed, not just which country

Site information changes the engineering more than anything else on the form. Please include in your RFQ:

  • Indoor or outdoor placement, and whether the spa sits above ground, partly recessed, or fully recessed into a deck.
  • The supporting surface: concrete slab, timber deck, pavers or ground-bearing base, with its dimensions and level tolerance if you already have it.
  • Access route from the delivery vehicle to the final position — gate widths, overhead clearance, steps, and whether a crane or long-arm lift is needed.
  • Distance between the spa and the nearest power supply, drainage point and water feed.
  • Whether there is a plant room or equipment alcove beside the shell, and its size.
  • Local climate conditions you expect it to run in year-round, since that drives insulation and heating choices.

Recessed installations in particular need decisions made before the shell arrives, because drainage, ventilation and access panels for service become part of the civil works. Sending a photograph or a simple sketch of the site costs nothing and removes most of the guesswork from the quote.

3. State the power supply available on site

The captured specification for WS-S07B gives a total power figure of 13.35 kW. Treat that as the catalogue reference for the standard configuration, and confirm the final number against the option list you select — adding a heat pump or changing pumps moves it. Your RFQ should state the supply you can provide at the installation point: single-phase or three-phase, voltage, available amperage, and whether a dedicated circuit with protective device can be run to the spa.

If your electrician has already produced a load schedule, attach it. Electrical mismatch is the most common reason a delivery date slips after production has started, because the correction happens on site rather than in the factory.

One thing we will not do: we cannot tell you what your local building, electrical or pool safety rules require. Those sit with your designer, engineer and certifying authority. Tell us what your consultant has specified, and we will price to it.

4. Split the scope: what you supply and what we supply

A clear RFQ names responsibilities on both sides. The buyer side typically covers site preparation, the base or slab, excavation and backfill for recessed installations, electrical work up to the connection point, drainage, permits and local inspections. The supplier side covers the spa shell and its equipment, control system, options selected, packaging and shipping as agreed.

Write this split into your request as a short list, then ask us to confirm it in writing with the quotation. Our service pages describe project design coordination, production, logistics and door-to-door delivery, plus installation and after-sales support — but what can actually be delivered at your address depends on the site and the country, so we confirm scope case by case rather than assuming it.

5. Specify delivery terms and the destination in detail

The same container priced to a port and priced to a villa driveway is not the same number. Include:

  • Delivery address, and whether it is a residential street with weight or vehicle-length limits.
  • Your preferred Incoterms — CIF port, DDP to site, or another arrangement your freight agent has quoted.
  • Whether you have a clearing agent at destination or want ours arranged for you.
  • Target installation date, and any milestone that drives it, such as a handover or a season opening.
  • Whether you want cargo insurance and who arranges it.

For buyers working on Australian projects, note that import duties, GST at the border and state-level pool barrier requirements are assessed locally. Ask us for the packing list, dimensions and weights early so your agent can cost them properly instead of estimating.

6. Ask the supplier to answer these questions in the quote

Include this short list in your RFQ and ask for a point-by-point reply
  • Which equipment items are included in the base price, and which are priced as options.
  • The confirmed dimensions and total power figure for the configuration you requested.
  • Production lead time from deposit, stated as a range rather than a single date.
  • Packaging method and container loading plan for this model.
  • What is covered by warranty, what is excluded, and how spare parts are supplied afterwards.
  • Who supervises installation on site and who pays for that supervision.
  • Payment terms, and what each payment milestone is tied to.

A supplier who answers all seven in writing has usually thought about your project. A supplier who answers with one price and one sentence has not.

7. If you are buying more than one unit, say so at the start

Developments, resort villas and club facilities rarely stop at one spa. Quantity affects packaging, container consolidation, spare-parts stock and how we schedule production, so it should be in the first email rather than discovered during negotiation. Where a project needs several units with matched finishes, send the full room or site schedule and let us quote against the whole set. Our Swimming Pools and Swim Spas range covers different lengths and layouts, which is useful when one model does not suit every plot on a scheme.

The same logic applies when the spa is one line in a wider package. Projects we supply often combine outdoor swim spas with long outdoor swim spas with hydrotherapy and relaxation pools, poolside loungers and dining sets, pergolas and cabanas, plus the interior fixtures of the same building. Sourcing those together reduces the number of suppliers coordinating one site, which is where most project cost overruns quietly appear.

8. A ready-to-send RFQ template

Copy this into your email and fill in what you know. Anything you leave blank, we will ask about — but a complete request gets a complete price the first time.

  • Project: name, location, residential / resort / development, and target installation date.
  • Model: Outdoor Swim Spa WS-S07B, quantity, plus any alternative models under consideration.
  • Configuration: control system, filtration type, heating method, insulation, steps, cover, UV sterilisation, water features, LED and lighting controls.
  • Site: above ground or recessed, base type and dimensions, access route with measurements, photographs or sketch attached.
  • Services: supply only, or supply plus delivery to site, installation supervision, after-sales support.
  • Delivery: destination address, preferred Incoterms, clearing agent, insurance, packaging requirements.
  • Budget range and decision date: optional, but it lets us propose a realistic configuration instead of an abstract one.

Before you send the request

Check three things first: that 7000 × 2200 mm plus working clearance physically fits where you intend to put it; that your electrical supply can carry the load your consultant has specified; and that someone on your side owns the permits and inspections. Those three decide feasibility. Everything else in the RFQ is about price accuracy.

Send your request for quote

Tell us the model code, the option list, the site conditions and the delivery terms, and we will return an itemised quotation with inclusions and exclusions stated separately. As a one-stop project furnishing supplier, we can also price poolside furniture, pergolas and interior fixtures for the same building on one schedule.