A niche looks like the simplest thing on a bathroom drawing until it reaches site. The recess has to sit in the right place, at the right depth, with edges that close neatly against tile or plaster, and it usually has to be built by a trade that is not the one holding the drawing. Custom niche paneling moves that problem off site and into the factory, but only if the dimensions, substrate, finish and interface details are fixed before approval. The list below is what we ask project teams to sign off before a niche or panelling package goes into production.
Start with the wall build-up, not the niche face
The most expensive rework on a niche package is rarely the panel itself. It is the wall behind it. Before you approve a profile drawing, confirm what the recess is being built into: stud and lining, brick or block, existing plaster, or a tiled shower enclosure. That single decision changes how the unit is fixed, how much depth you actually gain, and whether the reveal needs a subframe.
Then check service runs. Showers, taps, waste pipes, underfloor heating loops and concealed cisterns all occupy the same wall a niche wants. Ask the services contractor for setting-out dimensions on the same drawing you are measuring against, not on a separate one. Where a recess cannot be moved without cutting into structure, decide early whether to accept a shallower unit or relocate the whole arrangement.
Confirm usable depth and width against the finished surface
Architectural dimensions are usually taken from the structural face. What matters on site is the finished face, after adhesive, tile thickness, plaster or the panel build-up itself. A recess drawn at 100 mm can arrive as 78 mm once the tile is on. We ask for one dimension set that everyone works to: finished floor level, finished wall line, and the depth measured from that finished line.
Width follows the same logic. A niche sized to the centre of a stud bay will not stay centred once the lining board is packed out. Send us clear opening dimensions in millimetres, with tolerance stated, and tell us whether the panel is meant to sit flush, proud or recessed into the opening.
| Item to confirm | Why it matters before approval |
|---|---|
| Finished wall line and floor level | Fixes the true opening size after tile, plaster or panel build-up |
| Clear opening width, height and depth with tolerance | Determines whether the unit fits without packing or cutting on site |
| Flush, proud or recessed edge condition | Sets the frame profile and how the reveal closes against the surrounding finish |
| Substrate type and fixing method | Determines bracket, anchor and subframe details carried into production |
| Location of services behind the wall | Prevents clashes discovered after the recess has been formed |
| Shelf or divider loads | Affects shelf thickness, span and support detail |
Decide the finish, then decide how it meets everything else
Material and finish are a selection decision; interface details are a coordination decision. For bathroom walls we work from the Custom Partitions & Paneling collection, where material, finish and layout are specified per project rather than chosen from a fixed catalogue size. That flexibility is useful, but it also means nobody can build the item until you have named the surface: wood grain, lacquer, stone-look, glass or metal.
Once the surface is set, settle the junctions. How does the panel meet tile? Does a silicone joint carry the movement, or is a shadow gap intended? Where the niche abuts a mirror, a vanity or an integrated door and panelling run, who trims the edge? Those answers belong on the approval drawing. A junction left open on paper becomes three separate trades improvising on site.
Match the niche to the storage wall it belongs to
Most niches are not stand-alone features; they are one element in a larger joinery elevation. In a bedroom or hallway scheme, an open recess usually sits inside a continuous run of panels and concealed storage, and the reveal has to line up with the surrounding doors and shelves. We build those combinations as integrated systems — see open display niches within our Integrated Storage Walls range — so that shelf heights, reveal depths and grain direction carry through the whole elevation instead of resetting at every opening.
A worked example on our site is an arched niche and full-house custom wall cabinet project, where an illuminated arched recess for display pieces sits beside a full-height concealed wardrobe, an integrated vanity and a stone bathroom countertop. The point of that job was not the arch; it was that one factory package carried every element, so panel material, wood colour and storage layout stayed consistent across rooms.
Bathroom shelving follows the same rule from the other direction. Where the recess is really an open shelf rather than a formed panel, niche shelving is specified with made-to-measure sizing and finish options, and the load it carries decides the shelf thickness and support.
Get one set of measured dimensions, not two
Before a bespoke package is released to production we want a single dimensioned drawing that both the client and the factory have signed. That drawing should show every opening, tolerance, edge condition and junction note in one place. If the design team holds one revision and the site contractor another, the discrepancy surfaces at installation.
Pre-production sign-off
- Dimensioned drawing at a legible scale, with finished-face datums
- Material and finish named, with a physical sample approved where colour matching matters
- Edge and junction details drawn for every material the panel touches
- Fixing method agreed against the actual substrate on site
- Delivery sequence confirmed against other trades' programme
- Named contact for installation queries while the package is in production
Sequence delivery around wet trades
Bespoke paneling arrives late enough to stay clean and early enough not to hold up handover. Confirm which rooms are ready, what storage exists on site, and whether the units can get to the room without passing through a finished area. A unit that cannot be carried in has to be built in sections, and that decision changes the joint detail — so it needs to happen at drawing stage, not at the loading dock.
Sequencing matters more when one supplier carries several trades' scope. A fit-out package mixing wall paneling, kitchen cabinets, bathroom fixtures and engineered wood flooring has interfaces at every boundary: panel to worktop, niche to basin splash zone, skirting to floor edge. Coordinating those through one drawing set keeps a single party responsible for the junction instead of three.
Our service scope covers the coordination around production as well: design consultation and space planning, material selection and product specification, manufacturing and quality control, project management with site coordination, then installation and handover. Details are on our turnkey interior project solutions page, and the custom design and prototyping route is described under custom furniture design and OEM service.
Common approval mistakes we see corrected
- Dimensions taken from the structural line. The opening shrinks once tile or plaster is applied. Always measure to the finished face.
- Depth specified without checking services. A waste pipe behind the lining board turns a 100 mm recess into a surface-mounted unit.
- Junctions left to site. No drawn detail for the tile-to-panel meeting means an inconsistent silicone line along the whole wall.
- Niche treated as isolated. The reveal does not align with the adjacent joinery run, so the elevation looks assembled rather than designed.
- No sample approved. Wood tone and lacquer sheen read differently at production scale than on a small swatch.
Send us the drawing while there is still time to change it
The useful moment to involve a manufacturer is before the recess is formed, not after. Send the elevation, the finished-face dimensions and your intended junction details, and we will return a production-ready set with fixing and edge conditions resolved. For fit-out packages that combine paneling with cabinetry, bathroom fixtures and flooring, coordinating all of it through one supplier keeps those interfaces in one drawing set.
Planning niche paneling or a wider joinery package for a villa, hotel or apartment project? Send your drawings through our contact page and we will review the openings with you before anything goes into production.