A request for quote is where a wall-cladding purchase either starts cleanly or starts drifting. For a luxury decorative 3D wall panel, the price per square metre tells you very little on its own: the same relief pattern can be quoted with different panel dimensions, substrate compositions, edge details, packaging methods and delivery terms. This guide sets out exactly what a buyer should put in front of the supplier so the quotation you receive is one you can actually compare, order from and install.
Start With the Project Frame, Not the Product
Suppliers quote differently for a single villa feature wall than for a hotel lobby or an office fit-out with repeated bays. Put the project context in writing at the top of your enquiry so the technical team can propose panel sizes and fixing details that suit the job rather than guessing.
- Project type and location. Hotel, resort, villa, apartment, restaurant, showroom or office — and the city the panels must arrive in. Our project references include villas in Sydney, Melbourne, Perth, Willoughby and North Turramurra, so Australian destinations are familiar territory for our logistics team.
- Total area and how it is measured. Give the net panelled area in square metres, plus the number of separate walls or bays. A 40 m² wall behind a reception desk and four 10 m² background walls need different cutting plans even at the same total.
- Substrate and site condition. State what the wall is now — plasterboard, masonry, existing tile, cement board — and whether the area is a normal dry interior or a humid space such as a spa corridor, bathroom or covered poolside. The panels are moisture resistant and suited to humid indoor environments, but the substrate preparation note still has to be written down.
- Installation responsibility. Say clearly whether your own trades will fix the panels on site or whether you want installation support discussed as part of the package. This changes what we quote and what drawings we prepare.
Specify the Panel Itself in Detail
The 3D wall panel is lightweight, flexible and simple to cut on site, which is why it suits background walls, TV walls, lobbies and restaurants. That same flexibility means the specification has to be precise: custom size, colour and pattern are all available, and each choice moves the price.
The panel items a quotation must confirm
- Pattern and relief depth. Attach reference images of the profile you want and state whether the relief faces outward as a shadow-casting feature or should read flatter under lighting.
- Panel size and coverage per piece. Give your target module and ask the supplier to confirm panel dimensions, effective covered area per panel and the resulting joint layout.
- Colour and surface finish. Name the colour system you are working to (a RAL reference, a paint code from your specifier, or a sample you can post). State whether the finish is to be supplied painted or left for on-site finishing.
- Material grade and environmental profile. The panels are made from eco-friendly material; if your project has an indoor air quality or green-building requirement, ask in writing which grade meets it and what documentation can be issued with the shipment.
- Edge, corner and transition details. Ask how outside corners, skirting junctions and reveals around openings are closed off — mitred edges, trims, or site-cut finishes.
- Cutting allowance and wastage. Confirm the spares quantity your layout implies for a curved wall, a wall with switchboards, or a repeated bay pattern.
Ask For the Complementary Specification in the Same Enquiry
Wall panels are rarely an isolated line item on a fit-out bill of quantities. If the adjacent finishes come from the same supplier, one coordinated order removes the argument about who owns the junction. Send your panel enquiry together with the neighbouring scope — for example modern decorative wall panels for the adjoining walls, or aluminium honeycomb panel cladding where the design carries the finish onto an external or feature surface.
As a one-stop furniture and building materials supplier, we can price wall panels alongside flooring, lighting, joinery, screens and loose furniture on the same order, with one production schedule and one shipment. Buyers who group their scope this way typically find it easier to keep colour, texture and joint details consistent across rooms.
Set Out Quantity, Schedule and Delivery Terms
A comparable quotation always states the commercial frame as clearly as the product. Include these in your request so the supplier can answer them in the same document:
| Item to state in your RFQ | Why it changes the quotation |
|---|---|
| Order quantity and any phased release | Full-project volume versus a first trial wall affects production batching and unit price. |
| Required on-site date, working backwards from your programme | Determines whether custom colours and sizes can be produced in one batch or need staging. |
| Delivery address and preferred Incoterm | Freight by sea, air or rail differs sharply in cost and transit; door-to-door delivery to the site is not equivalent to port delivery. |
| Packaging expectation for relief surfaces | Three-dimensional profiles need edge and face protection; state if your site has restricted unloading access. |
| Import documents you need | Commercial invoice, packing list and certificate of origin should be listed up front so nothing holds the consignment at customs. |
| Payment terms you can offer | Deposit structure governs when tooling and custom colour batches start. |
Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, container loading and shipment tracking, so tell us the destination port or site address and we will price against it rather than quoting an abstract ex-factory number.
Attach the Documents That Make a Quote Comparable
The difference between a supplier's first rough number and a firm one is almost always the paperwork you attach. Include:
- Wall elevations or a dimensioned sketch of each panelled surface, with heights and obstacle positions marked.
- Photographs of the existing wall and of the room in daylight and under artificial light — relief reads very differently under the two.
- Your finish schedule or mood board, so the colour and texture proposal matches the rest of the scheme.
- Any sample you already hold, with its reference number, if you are matching an existing installation.
- The drawing sheet numbers you want quoted, so both sides are reading the same revision.
If your design is still developing, send what exists and ask for specification support. Our interior design services cover material selection, product specification and production coordination, which means a preliminary enquiry can come back with a recommended panel module and joint layout rather than only a price.
Questions to Put Directly to the Supplier
A good quotation answers these without being chased:
- What is the effective covered area per panel at the quoted module, and how many spares does my layout require?
- Which fixing method do you recommend for my stated substrate, and what adhesive or mechanical fixings should be specified locally?
- Can you supply a physical sample of the exact profile and colour before production starts, and who pays for it and its freight?
- For a custom colour, what is the minimum quantity and how is colour tolerance agreed and signed off?
- What drawings or an installation guide come with the shipment for my trades?
- How are damaged panels replaced after delivery, and what is the claim window?
A practical test before you order
Compare two quotations line by line using the same checklist: panel dimensions and coverage, material grade, colour agreement method, spares quantity, edge details, packaging standard, delivery term, documents supplied and after-delivery replacement terms. If one quotation is cheaper but silent on three of these, it is not a cheaper panel — it is an unbudgeted variation later.
How Our Quotation Process Runs
For wall-panel enquiries we work in the same sequence as our wider project service: you send the brief and drawings, we confirm material, size and colour details with you in writing, then we issue a quotation covering production, packaging and the delivery option you selected. Where the design calls for made-to-measure panels, our custom furniture manufacturer and OEM team handles prototyping and finish development before batch production begins.
Send us your elevations, the net panelled area, the destination address and your required on-site date. We will come back with a specification you can compare against any other supplier's offer — not just a price per square metre.
Ready to price your wall-panel scope? Send your drawings and quantities to santerson@qq.com, or speak with PHILLIP on WhatsApp +86 13928214007 for a direct quotation.