A glass-fronted hinged wardrobe looks simple on a drawing and behaves very differently on site. The doors carry real weight, the frame has to stay square for the hinges to work, and the glazing has to survive both the journey to site and the fitting itself. If any of that is left out of the plan, the problems surface at the worst moment — after the carcasses have arrived and the bedrooms are already decorated.
Below is what we ask project teams to settle before production starts on Glass Hinged Wardrobes, and what our own team confirms at each stage when these units are made for villas, apartments and hospitality rooms.
1. Measured opening, not a nominal one
Hinged wardrobe doors only hang correctly if the carcass is square and the surrounding structure allows it. The plan should record finished floor levels, ceiling heights, skirting and architrave lines, plus the position of any door openings, columns or beams that limit how far a leaf can swing.
- Width, height and depth taken at three points each, so out-of-plumb walls are known before the unit is built.
- Confirmation of which wall the unit sits against and whether that wall can carry the fixing pattern.
- Clearances for handles, adjacent furniture and circulation, checked against the swing radius of every leaf.
2. Door layout and how the leaves actually open
Glass doors make a bad layout obvious. Two leaves that meet on a corner, or a leaf that stops against a bedhead, cannot be fixed later without changing the carcass. Decide in the plan which leaves are active, which are fixed panels, and where handles sit relative to the bed and the doorway.
- Leaf count and width per unit, with fixed panels used where a full leaf would clash with the room.
- Handle position and style agreed against the glass type, since some finishes show fingerprints and edge marks more readily than others.
- Interior layout drawn alongside the elevation — hanging rails, shelves, drawers and lighting — so hardware choices are made once rather than twice.
3. Glazing choice and what it is expected to do
The glass sets the tone of the room and how much of the interior stays visible. Our Clear Glass Wardrobes, Frosted Glass Wardrobes and Smoked Glass Wardrobes are specified for different reasons: clear glass opens a room up, frosted glass hides the contents while still passing light, and smoked glass reads darker and softer. Mirrored Hinged Wardrobes solve a separate problem where a dressing area has no mirror wall.
Record the glass type, colour and any surface treatment on the drawing, together with the glazing bead or frame detail that holds it. Where a project requires a specific glass build for safety or impact performance, state that requirement in the enquiry so it is priced into the door rather than discussed after the fact.
4. Hinges, frames and load
Glass doors are heavier than a matching panel door of the same size, and hinges are what carry that weight for years of daily use. The plan should show the hinge type, the number of hinges per leaf, and the maximum leaf width and weight each hinge line is rated for. Frame material matters just as much: an aluminium-framed glass door behaves differently from a glass panel set into a board frame, both in weight and in how the edge is finished.
If doors are expected to close softly or sit flush with the carcass face, note it here. It changes the hinge specification and the rebate detail, and it is far cheaper to specify at drawing stage than to change on site.
5. Site conditions that decide whether the fit goes to plan
- Floor finish complete and level before carcasses go in, otherwise the levelling legs run out of adjustment.
- Wet trades — plaster, paint, screed — fully cured, so moisture is not trapped behind a fitted unit.
- Lighting and any interior cabinet lighting wired and tested before doors are glazed and hung.
- Storage on site: glazed leaves need a dry, secure area standing upright, not stacked flat in a corridor.
6. Packaging, delivery route and handling
Most damage to glass doors happens between the container and the bedroom, not in the factory. The installation plan should trace the route: lift size, stair width, turning corners, lift booking times, and whether glazed leaves can travel in crates standing upright. For units shipped internationally, this is also where handling instructions and crate labelling are agreed, so whoever receives the delivery knows which crates hold glass.
7. Sequence, access and who does what
| Stage | What must be settled | Who confirms it |
|---|---|---|
| Survey | Final dimensions, wall construction, floor levels | Site contractor and supplier |
| Approval drawing | Elevation, glass type, leaf layout, interior fit-out | Designer / client |
| Production | Confirmed specifications released to the factory | Supplier |
| Delivery | Crate handling, storage area, access route | Site contractor |
| Installation | Carcass levelling, hinge adjustment, glass inspection | Installer / supplier guidance |
| Handover | Snag list, spare hinges and beads, care instructions | All parties |
8. Snagging and handover
A wardrobe is signed off when the doors hang parallel, close without knocking, and the glass is clean and free of edge damage on both faces. Put that in the snag list rather than leaving it to opinion. Include spare hinges, glazing beads and any matching keys or hardware with the handover pack, plus written care instructions for the glass finish — frosted and smoked surfaces are cleaned differently from clear glass.
The short version: measure properly, fix the leaf layout early, name the glass and the hinge line on the drawing, plan the delivery route for glazed leaves, and write the snag list before installation starts.
SANTERSON makes these wardrobes to project-specific dimensions, with material and finish options and a layout drawn for each space. Send us the drawings or the room dimensions and we will confirm the door specification, packaging and delivery plan for your project before production is released.