A full height storage wall looks simple on a elevation sheet: one clean surface from slab to ceiling, doors closed, nothing visible. On site it is one of the most coordination-heavy items in a villa or apartment fit-out, because it touches the structural line, the electrical route, the skirting and cornice decisions, the floor level and the door openings around it. This guide walks through how we take Santerson Full Height Storage Walls from a design drawing to an installed wall on site, and what your drawings and site information need to carry before the units are put into production.
What a full height storage wall actually is
Our Full Height Storage Walls belong to the Integrated Storage Walls collection. The units are made to measure for each opening, and the layout, material and finish are specified per project rather than picked from a fixed catalogue size. That is the point of the system: the wall is built around the room, not the other way round.
Within the same collection you can mix the elements that make a wall work in daily use:
- Santerson Integrated Media Storage for the screen, hardware and cable runs;
- Santerson Mixed Open & Closed Storage where open shelves carry daily items and closed compartments hide the rest;
- Santerson Open Display Niches for lit recesses and display pieces;
- Santerson Sliding Storage Panels where a door swing would clash with furniture or a traffic line;
- Hidden Cabinets when the wall has to read as panelling rather than cabinetry.
Because these elements share a system, one wall can carry a media zone, a pantry run and a display niche without three different cabinet depths meeting at an awkward reveal. That consistency is what makes the item worth coordinating early instead of leaving to the joinery stage.
Reading your drawings: what we check first
When a design pack reaches us, the storage wall elevation is only one sheet in a set that matters. Here is the sequence we work through, and the questions each drawing has to answer.
1. The room envelope
We need the run length at floor level and at ceiling level, the wall height at both ends of the run, and confirmation of which surfaces are truly straight. In renovated villas and older apartments, walls are rarely plumb along a long run, and ceilings are rarely level across a room. A storage wall that meets an out-of-plumb wall shows the gap at the top or bottom unless the design carries a scribe, a reveal shadow gap or a filler panel decided in advance.
2. Floor finish build-up and levels
Tell us what sits under the units: screed, adhesive, engineered boards, tiles, an underfloor heating layer. A change of floor build-up after production starts changes the height available for the carcass and can push a drawer line into a skirting or a cornice line. If the run crosses two floor finishes, show where the transition strip falls — it should not disappear under a door.
3. Electrical, data and media
Every storage wall in an occupied home carries something: a TV, a soundbar, a router, a charging drawer, a lit niche. For Integrated Media Storage we need the socket positions, the screen size and mounting method, and where the cables are allowed to drop. Where lighting is specified, we confirm the transformer location and how it stays accessible after the wall is closed up. A niche with no service access becomes a maintenance problem on day one.
4. Doors, openings and traffic lines
Check the swing of every nearby door against the storage wall elevation. Where a hinged door would clash with a wardrobe or pantry door, we switch to sliding panels or re-plan the compartment sequence. The same check applies to light switches, thermostat heads, air grilles and radiator positions — anything that sits inside the panel field has to appear on the elevation before it is cut.
5. Finish continuity with the rest of the fit-out
A storage wall rarely stands alone. It usually continues into Wall Panel Systems, meets a media wall, or repeats the door fronts used elsewhere in the project. Where the storage wall has to match adjacent panelling or internal doors, send us the panel and door schedules too, so the veneer, lacquer or laminate and the edge detail are specified once for the whole elevation.
Site requirements that change the specification
Site conditions change a storage wall specification, and it is cheaper to handle them on paper than with a saw on site. The table below shows what we need from the four conditions that come up most often.
| Site condition | What we need from site | Design decision it drives |
|---|---|---|
| Out-of-plumb or out-of-level walls and ceilings | Spot levels at both ends of the run and at mid-run; wall offsets if surveyed | Scribe width, shadow-gap detail, whether the top of the wall follows the ceiling line or stays level |
| Floor build-up and transitions | Finish make-up with thicknesses, transition strip positions, finished floor level | Carcass height, toe-kick treatment, drawer clearance at the skirting |
| Services behind and inside the wall | Socket, data, lighting and HVAC positions; access points | Cut-out positions, cable routes, transformer access, niche depth |
| Adjoining openings and ironmongery | Door schedules, reveal sizes, skirting and cornice details | Door type on the storage wall, end-panel width, whether a concealed door is used |
For projects where nobody on site can take levels reliably, we coordinate through our design and project team before production rather than adjusting at handover. That is part of the Interior Design Services scope: drawings, production coordination and on-site guidance.
The coordination sequence we follow
For a villa or apartment package that includes storage walls, cabinetry and other fit-out items together, the workflow is the same one described on our Turnkey Interior Project Solutions page.
- Brief and layout. Room dimensions, elevations, storage requirements per room, and how the wall will be used. Send what you have, even if it is a marked-up PDF.
- Specification and quotation. Compartment layout, materials and finishes, door types, hardware, integrated lighting. We confirm details item by item with you.
- Production. Once the drawings are signed off, the units are made to those dimensions at our factory under our own quality control.
- Packaging and delivery. Panels are packed for export and shipped by sea, air or rail, with the paperwork handled through our logistics and door-to-door delivery service.
- Installation and handover. Panels go in against the agreed setting-out marks, with an inspection walk at the end. If your site team installs, we send setting-out drawings and sequence notes; if you want guidance on site, we arrange it as part of installation and after-sales support.
A worked example: media wall plus tall storage run
Consider a common villa layout — a living room storage wall that carries the television on one side and continues into a tall storage run at the end of the room. On paper it is one elevation. In coordination terms there are several separate conversations:
- The screen. Size, mounting bracket type, whether the panel behind it needs reinforcement, and where the soundbar sits when the doors are closed.
- Cable management. Vertical chases inside the carcass, not surface trunking added later.
- Door choice. Sliding panels keep the seating zone clear; hinged doors need clearance in front of them.
- The tall run. Where appliances sit, how deep they are, and whether the doors align with the media wall doors on a shared reveal line.
- Lighting. Niche lighting and shelf lighting need drivers in an accessible position and a switch location agreed with the electrical contractor.
Each of these is decided from drawings before production. That is why we ask for the full pack — architecture, services and finish schedules — rather than one joinery elevation in isolation.
What to send with your enquiry
- Floor plans and the elevations of every wall carrying built-in storage;
- Finished floor levels and floor make-up for each room;
- Electrical, data and HVAC layouts, including lighting circuits;
- Door, skirting, cornice and ironmongery schedules;
- Finish references — veneer, lacquer, laminate or glass — with the items they must match;
- The installation route you plan: your own site team, or coordination support from us.
If your drawings are still at concept stage, send them anyway. We work from mood boards and 3D layouts as well as detailed joinery drawings, and identifying a clash at that point is the cheapest fix available.
Getting the wall right the first time
A full height storage wall fails on site for a short list of reasons: levels never taken, floor build-up changed after production, services discovered behind a panel, and the same elevation specified twice by different trades. Every one of them is settled on paper. Send us the drawings and the site information above, and the coordination happens in the drawing cycle instead of the installation week.
Send your drawings for a storage wall quotation
SANTERSON is a China-based furniture and building materials manufacturer supplying villa, hospitality and office projects, with custom manufacturing, project procurement and door-to-door delivery handled by one team. Share your elevations and site levels and we will return a specified layout for your Full Height Storage Walls.
Custom & OEMDoor-to-Door DeliveryInstallation Support
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com