A textured lacquer kitchen is specified in finish, not in a model number. Two projects can order the same door style and end up with very different results depending on how the texture was described, how deep the sheen was defined and what the substrate underneath was carrying. That is why an early enquiry with rough drawings often comes back as a set of questions rather than a price. The list below is exactly what our estimating team works from when we price Textured Lacquer Cabinets, so sending it with your first message usually turns a week of back-and-forth into one quotation round.

The drawings and measurements that anchor the quote

Cabinet pricing is calculated from developed panel area, not from a count of doors. Send what you have, even if it is only a marked-up floor plan:

  • A dimensioned layout of the kitchen — wall elevations with run lengths, heights and depths for base units, wall units and any tall housing.
  • Floor-to-ceiling height and the position of beams, bulkheads, skirting, radiators and downlights, because these cut the carcass heights.
  • Appliance schedule with make and model, or at least cut-out dimensions for oven, hob, dishwasher, fridge and extraction.
  • Where the counter edge sits relative to the door face, so we know whether the door is a true overlay, an inset or a flush handleless reveal.

If you have a 3D scheme from your designer, send the render and the elevations together. If you do not, our design team can work from a measured plan — space layout planning and production coordination are part of our interior design services, and drawings are confirmed with you before anything enters production.

How the texture itself has to be described

"Textured" covers several different manufacturing operations, and each one is quoted differently. Tell us which of these you are after:

  • Embossed grain under lacquer — the texture is pressed into the panel, then sealed with lacquer. The feel follows a repeating pattern, so we need to know whether an aligned or continuous grain across adjacent doors matters at your reveal lines.
  • Wire-brushed or grooved surface — physical relief cut into the substrate and colour-filled in the recesses. Depth of the groove changes both cost and cleanability.
  • Smooth panel, textured appearance — the visual effect sits in the lacquer build and sheen rather than in the surface profile.

Then pin down three things we cannot infer from a photograph: the direction the texture runs on each door, whether edges are wrapped or lacquered through, and the sheen band you expect. A single reference image with the panel held at an angle, plus a second shot straight on, tells us more than any written description.

Substrate, construction and hardware

Lacquer is a finish system, so the board beneath it has to be stable enough to hold that finish over years of kitchen humidity. Tell us:

  • Panel substrate you want us to work to, or the environment the cabinets will sit in — a coastal apartment and an inland villa are not treated the same.
  • Carcass material and edge treatment for interior boxes, and whether you need moisture-resistant board around the sink.
  • Door construction — single-piece panel or framed — because a frame changes how the texture is carried across the rails and stiles.
  • Hardware expectations: handleless profile or visible pull, soft-close on doors and drawers, drawer system type, and any integrated lighting in open shelving. Our handleless minimalist kitchen cabinets are built around touch-to-open fronts and soft-close fittings throughout, which is the specification most often requested alongside a textured matte finish.

Quantities, units of supply and where the boxes land

Volume changes both price and packing. A single apartment kitchen and a forty-apartment fit-out are not quoted on the same basis, so include:

  • Total number of kitchens or wardrobe sets, and how many variations exist between them.
  • Whether you want units assembled and shipped as boxes, or flat-packed for site assembly — relevant when a lift or stairwell limits what can be carried.
  • The delivery address, and whether it is a private residence, a builder's site or a bonded port. We arrange freight by sea, air or rail with customs paperwork and door-to-door delivery, so the destination drives the packing specification as much as the freight cost.

What to expect back from us

With the above in hand, the reply is a line-item quotation by unit, a confirmation drawing for your sign-off and a finish sample reference. Detail confirmation is a formal step in our workflow before production starts, which protects both sides: nothing is machined until the elevations and the selected finish are approved in writing.

Minimum viable enquiry. If you can only send three things, send (1) dimensioned wall elevations, (2) the appliance cut-out list, and (3) two reference photos of the texture you want — one angled, one straight on. That is enough for us to price matte lacquer or textured alternatives and come back with options rather than more questions.

Related finishes in the same lacquer family

If your project mixes finishes across a floor — closed kitchen fronts against living-area joinery — it is worth pricing them together so the colour and sheen batches match. The high gloss lacquer and metallic lacquer doors are produced on the same finish line, and matching wardrobe fronts from the matte lacquer wardrobe collection can be carried through from the kitchen into the bedrooms.

Send your enquiry. Attach drawings, an appliance schedule and finish references through our contact page, or reach us on WhatsApp at +86-13928214007 (PHILLIP) or by email at santerson@qq.com. We reply with a quotation and the specific gaps, if any, in one round.

Panel materials, sheen options and finish availability are confirmed project by project. Dimensions and selected specifications should be verified on the approved drawing before production.