A double basin countertop looks simple on a drawing: two bowls, one slab, one vanity below. On site it becomes a coordination problem. The slab has to suit the bowl you chose, the bowl has to sit at a height the users are comfortable with, the waste has to fall into the right trap, and the tap has to reach the bowl without splashing onto the floor. If any of those four decisions is left open when the order is placed, the correction happens on site, at your cost. This guide lists the questions our project team asks buyers before we produce a Santerson Double Basin Countertop, so you can bring the same list to any supplier and compare like for like.
1. Overall size, and where the two bowls sit
Our double basin countertop is made to measure rather than offered in fixed widths, so start with the wall-to-wall run and the position of the soil stack and any riser duct. Three numbers matter more than the total length:
- Centres between the two bowls. Two people brushing their teeth side by side need enough clearance that elbows do not collide. Tight centres also leave too little slab between the bowls for a shared tall tap to be fitted cleanly.
- Setback from the back wall. This decides the depth of the work surface behind the bowls, where toothbrushes, soap and glasses live. A shallow setback looks neat in a render but leaves nowhere to put anything down.
- Overhang at each end. Where the countertop returns into a side wall or wraps a niche, tell us early. An overhang that meets a tiled return needs a different edge detail from one that finishes free.
Send us the bathroom layout with door swing, WC position and window reveal marked. We work from drawings, not from a width alone, because the vanity carcass below has to be drawn around the same dimensions.
2. How the bowls are mounted
The mounting method changes the slab, the cutout and the tap hole, so it is the second decision to settle:
- Santerson Undermount Basin — fixed beneath the slab, with the rim hidden. The top surface sweeps clear into the bowl, so wiping water off the counter takes one motion. This is the option most villa and hotel bathroom projects specify.
- Santerson Vessel Basin (Above Counter) — sits on top of the slab. It reads as a design feature and shows more of the bowl shape, but it raises the usable height and needs a taller tap with a longer spout reach.
- Integrated Basin — the bowl is formed from the same material as the top, so there is no joint to seal and no rim to keep clean. It suits projects where maintenance is a priority.
Tell us which of these you want before we cut. A slab drilled for a vessel basin cannot be reworked into an undermount installation without replacing the top.
3. Slab material and edge detail
Where the design calls for natural stone or marble rather than an engineered top, we produce it from Santerson Stone & Marble Surfaces, also made to measure. Two points to agree in writing:
- Finish. A polished surface reflects light and shows water marks; a honed surface hides them and reads softer. In a shared family bathroom or a guest room with heavy use, the honed option usually stays looking newer for longer.
- Edge profile and thickness. A square edge, a eased edge or a built-up laminated bullnose each change how thick the top appears at the front. The edge also determines whether the tap deck has enough solid material behind it.
For natural slabs we ask you to approve the block or the cut sheet before fabrication. Veining and movement in a real stone slab vary piece by piece, and approving the actual sheet is how you avoid receiving a top that does not match the sample tile you were shown.
4. Taps, waste and the plumbing behind the wall
These are the items most often left to the installer, and they cause most of the call-backs:
- Tap reach and spout height. The spout must land in the bowl, not on the divider between two bowls. Vessel installations need the spout above the rim of the bowl.
- Deck-mounted or wall-mounted. A wall-mounted tap frees the deck and looks cleaner, but the rough-in valve has to be set in the wall before tiling, at a height matched to your chosen bowl.
- Waste type. Pop-up or click-clack waste keeps the bowl looking clean when dry; an open waste drains faster but always shows. Two bowls sharing one trap need the fall and pipe size confirmed by your plumber.
We do not decide these for you, but we do need them fixed before fabrication, because tap holes, overflow provisions and cutout positions are cut into the slab at the factory.
5. The vanity below, and matching it to other joinery
A countertop rarely arrives alone in a project package. If you want the carcass, mirror cabinet and any tall storage made together, we build them as one set so door fronts, drawer fronts and finish match across the room. Our wider Interior Fixtures range covers vanities, wall-hung basins, WCs, shower systems and built-in cabinetry, which means one supplier draws the bathroom package instead of three.
Two practical benefits follow from ordering it as a set. The vanity drawer layout is planned around the waste pipework rather than fighting it on site. And the same finish code travels through to the bedroom wardrobes and kitchen cabinetry, which matters when a villa or apartment block repeats the same bathroom type across several units.
6. What we need from you to quote accurately
- Layout drawing with overall run, wall finishes and the position of soil stack, risers and any recessed cistern.
- Bowl selection and mounting method — undermount, vessel or integrated.
- Slab material, finish and edge profile, with block or sheet approval for natural stone.
- Tap model or a note of deck-mounted versus wall-mounted, plus waste type.
- Finished floor to finished ceiling height, so we set the work surface at a comfortable level for your users.
- Delivery address, access route and whether the tops go in before or after tiling.
Ordering through a single project supplier
SANTERSON has manufactured furniture and building materials since 2008 and works as one supplier from design and custom production through to door-to-door delivery, installation support and after-sales service. Because the countertop, vanity, joinery and finishes for a bathroom come off the same drawings, dimensions are checked once rather than reconciled between three vendors.
Send us your bathroom layout and bowl choice and we will return a made-to-measure specification for the countertop and matching vanity. Contact PHILLIP on +86-13928214007 (phone or WhatsApp) or email santerson@qq.com.