A glass-front tall cabinet looks simple on a drawing: a full-height box, glazed doors, shelves behind them. In production it is one of the more specification-heavy items in a joinery package, because glass, carcass, hardware and lighting all have to agree with each other before the first panel is cut. If you are ordering Santerson Glass Front Tall Cabinets for a bathroom or bedroom fit-out, the quality of your enquiry decides how many revision rounds the job needs.
The product page states that finish, layout and dimensions can be specified to suit each space, and it asks buyers to confirm glass and storage configuration for each project. That is exactly the information a manufacturer needs from you at the start. Below is the brief we would want to receive, in the order we would work through it.
1. The room, not just the wall
Send the room elevation with the cabinet position marked, plus floor-to-ceiling height at both ends of the run rather than one average figure. Existing floors are rarely level, and a tall cabinet scribed to an uneven slab reads as badly installed even when the carcass is perfect.
Tell us what sits next to the unit: a vanity, a door swing, a radiator, a recess, a skirting line. If the cabinet shares a wall with Santerson Double Vanity units or runs into a corner, say so, because return depths and handle clearance change the drawing.
2. Dimensions you want confirmed in writing
The catalogue page does not publish a fixed size for this item; sizing is made to measure. So your enquiry should carry the numbers you expect, and ask us to confirm them back against the site condition before production:
- Overall width, height and depth of each module, in millimetres.
- Whether the unit is floor-standing or raised on a plinth, and the finished floor level you are working to.
- Whether the top is scribed to the ceiling, left with a shadow gap, or carried into a Santerson Open Shelf Tall Cabinets header.
- Door leaf widths you are comfortable operating in the space, and which way they open.
3. Glass: type, treatment and what it should hide
Glass is where a brief usually becomes vague. Name the glass treatment you want specified for the doors, and say what the cabinet will store behind them. Frosted or ribbed glass keeps contents out of sight while still reflecting light; clear glass turns the shelves into a display and raises the standard of housekeeping expected in that room.
Also state how the glazing is bedded and beaded, and what the door leaf is built from. Those two details decide whether a glazed door stays flat after a season of humidity swings in a bathroom. If you have a reference image from another project, send it with a note on what you do and do not want copied; a picture alone invites the wrong interpretation.
4. Interior layout and load
List what goes on each shelf: towels, toiletries, glassware, linen, small appliances. Shelf spans and loading are designed around that list, not around a generic grid. Note where you want adjustable shelving versus fixed shelves, and where drawers or pull-out trays make more sense than a shelf at knee height.
If the tall unit is part of a wider storage wall, tell us which sections are closed and which stay open. A run mixing glazed doors with Santerson Open Display Niches needs one consistent module rhythm, and that decision is far cheaper to make at drawing stage than on site.
5. Lighting and services
Glazed cabinets with internal lighting are a different job from glazed cabinets with none. If you want lit shelving, send the switching arrangement and where the driver may sit, and ask us to confirm the electrical specification against the cabinet design; our Santerson Integrated Cabinet Lighting range is configurable, and its ratings need matching to each design.
If a tall unit sits beside a basin or shower zone, flag the wet boundary. Bathroom joinery specifications change with proximity to water, and we would rather quote the correct board edge and finish now than discuss it after delivery.
6. Finish, material and matching
Name the finish you want matched: a paint code, a veneer species, a laminate reference, or an existing sample you can post to our Foshan workshop. Where the tall cabinet must match Custom Built-in Kitchen Cabinets elsewhere in the same building, say which units are already fixed, so we match to those and not to a drawing.
7. Quantities, phasing and site access
Give quantities per unit type, the rooms they belong to, and whether the order arrives in one drop or in phases across floors or villas. Tall cabinets are bulky; confirm lift sizes, stair widths and corridor turning points early, because a module that cannot reach its room has to be split, which changes the joinery detail.
8. Delivery, installation and handover
Tell us who installs. We handle logistics and door-to-door delivery, on-site installation, inspection and snagging, plus spare parts and maintenance support, so the brief should state whether you want that service or whether your own crew will fit the units. That answer determines packaging, labelling, and how detailed the assembly drawings need to be.
What we send back
With those eight sections complete, you should receive shop drawings showing dimensions, door elevations, glass type, shelf positions and lighting notes, together with a quotation listing what is included and what still needs confirming. Nothing goes into production until the drawings are approved.
Santerson has manufactured furniture and building materials since 2008 and works as a one-stop supplier across joinery, fit-out and finishing products for villa, hospitality and office projects. If you are preparing an enquiry for glazed tall cabinets, send the eight items above and we will return a specification you can check line by line before anything is cut.