A wardrobe package looks settled on paper long before it is settled on site. The elevation drawing shows a warm oak-look front, the schedule reads "melamine", and the approval email asks for a signature by Friday. Project teams who sign at that point usually inherit the ambiguity later, when panels arrive with the wrong grain direction or the carcass colour does not match the joinery next to it. Confirming a short list of items before approval is far cheaper than correcting them after production.
That is especially true for wood grain melamine wardrobes, where the finish, not the structure, carries most of the design intent. Below is the practical checklist we work through with architects, builders and procurement managers before a made-to-measure wardrobe package goes into production.
1. What "wood grain" actually refers to in the specification
Two different things get called wood grain on a drawing. The first is a printed decorative paper pressed onto a board — the standard melamine laminate route, where the pattern is reproduced and can be matched across panels from the same production run. The second is a real sliced timber surface with genuine figure and variation between sheets. They behave differently under site lighting, they cost differently, and they age differently.
Before approving, ask which one the price was built on. Our melamine wardrobe range covers matte, glossy, textured, solid colour and two-tone surfaces alongside the wood grain option, so the finish family is a decision to make deliberately rather than by default. If the design intent is a specific timber species look — oak, walnut or something darker — say which one, because "wood effect" alone will not survive comparison against an existing floor or door.
2. Grain direction and how panels will be cut
This is the single most common source of rework on wood grain fronts. Vertical grain on one door and horizontal grain on the next reads as a construction error even when both panels are perfect.
- Confirm the grain direction for every elevation, including returns, end panels and any top or bottom rail.
- Ask whether drawer fronts are cut from the same sheet as the adjacent doors, so the pattern runs continuously.
- Flag mirrored pairs. A book-matched look has to be requested; it does not happen automatically.
- Check that the pattern repeat scale on a tall door is acceptable next to a short one in the same run.
3. Substrate, edge banding and hardware interface
A melamine front is only as good as the board behind it and the edge that closes it. For wardrobes that run floor to ceiling, the substrate choice affects how the doors hang over years of use, and edge banding colour is where a matched finish usually fails — the front matches, the thin edge line does not.
| Item to confirm | Why it matters at approval stage |
| Board type for doors and carcass | Determines load behaviour on tall doors and how hinges hold their adjustment. |
| Edge banding supplier and colour code | A near-match edge is visible in raking light; agree the code, not a photo. |
| Hinge and slide specification | Soft-close hardware changes door gaps and the clearance the carcass needs. |
| Interior configuration | Shelf, drawer and hanging ratios change internal heights; late changes mean new panels. |
4. Dimensions: what the drawing is not telling you
Made-to-measure wardrobe work fails on site for a narrow set of reasons, and almost all of them trace back to dimensions taken from a drawing rather than from the built space. Before approval, confirm that the opening has been surveyed after plaster, screed and flooring are in place — or that the tolerance for what has not yet been installed is written down.
Specifically: finished floor level, wall straightness over the full wardrobe run, ceiling level variation, the position of skirting that must be removed or scribed around, and the route of any services behind the carcass. Where a wardrobe sits next to wood grain melamine cabinets in an adjoining room or a dressing area, confirm that both packages are measured against the same datum, otherwise the panels will not line up at the reveal.
5. Sample approval: what to sign off on
A catalogue image cannot carry approval for a wood grain finish. Request a physical sample of the exact laminate, with edge banding applied, and look at it in the same light the room will have. A finish that reads warm beside a window can go grey and flat under LED strip lighting inside the wardrobe.
- Approve the sample against a written code or reference number, and keep the signed sample itself.
- Check the surface against fingerprints and cleaning — matte and textured melamine behave very differently from glossy here.
- Confirm which side of the panel is the decorative face, particularly for glass-fronted or aluminium-framed alternatives in the same range.
- Record who approved the sample and on what date, so a later substitution has to be raised formally.
6. Shop drawings before production release
Approval should go to production only after shop drawings come back from the factory, not from the design-stage elevations. Good shop drawings show panel sizes with tolerances, grain direction arrows on every face, edge banding codes, hardware positions and the internal layout at full scale.
Read them against your own drawing rather than trusting that they match. The gaps appear in the small places: a corner unit resolved differently, a filler strip nobody drew, a door swing changed to clear a handle.
7. Packaging, delivery sequence and installation window
Built-in wardrobes are usually one of the last items into a room, which makes them hostage to everything scheduled before them. Confirm the pack list against the panel schedule, the labelling system for each room, and whether the delivery lands in one shipment or split consignments. Where a project also includes flooring, wall panelling or other joinery from the same supplier, sequencing the deliveries so that the carpenters are not waiting on a second container is worth arranging at the order stage.
Our turnkey scope covers design and custom/OEM production through door-to-door delivery, installation support and after-sales service, which means the wardrobe package can be coordinated with built-in furniture and other interior fixtures on one schedule instead of several. For villa and hospitality projects that is usually where the real saving sits — not in the unit price.
8. Who answers the questions after handover
Before approval, get a named contact for post-installation adjustment: door realignment, slide replacement, a panel damaged on site. Ask what is supplied as spares — matching edge banding and a hinge set cost very little at production and are difficult to source to the same code two years later.
If you are preparing a wardrobe package for approval and want the specification reviewed before it goes into production, send us the elevations and the room survey. We will confirm finish codes, panel breakdown and delivery sequence, then come back with shop drawings for sign-off. Contact PHILLIP at SANTERSON to start that review.