A laser-cut metal screen reads as a single decorative decision in a hotel lobby or villa entrance, but it is one of the easiest items in a fit-out package to mis-specify. Every panel is cut to order, so an unresolved detail does not become a factory substitution — it becomes a re-made panel, a delayed handover and a wall that has to be reopened after the surrounding finishes are already installed.
The checklist below follows the order in which those decisions actually have to be made, using our custom gold stainless steel laser cut decorative screen partition as the running example. Send a drawing, a photograph or just a reference image and we fabricate to your dimensions — but only once each item below is agreed in writing.
1. Opening condition: finished floor to finished ceiling
Screens are normally fixed between a floor finish and a ceiling finish, so both surfaces must be defined before the panel size is drawn. A partition running under a gypsum ceiling needs a set-down or rebate; a screen stopping below an exposed slab needs a header detail; a screen meeting stone needs a joint allowance. Confirm which surface the screen touches on every edge, and who supplies the fixing substrate behind it.
We fabricate to exact dimensions taken from your drawings or a site survey, but those dimensions have to be stated as finished-condition sizes. Measure after floor and ceiling finishes are in place, and at several points along the run — a long lobby wall is rarely flat enough for one height to hold across its whole length.
2. Panel count and joint layout before pattern design
One oversized panel may be structurally tidy yet impossible to carry through a service corridor, a lift or a stairwell. Splitting the run solves the delivery problem, and that split is what determines how the pattern reads once installed.
Fix the number of panels and the position of each joint first, then design the cut pattern around them. On wide feature walls we build multi-panel configurations as standard — our custom bronze stainless steel laser cut decorative screen partition is usually made this way — because a joint can be worked into the motif layout instead of cutting through it. Panel count, panel width and total run length should all appear on the same approval drawing.
3. Pattern: what we need to receive from you
Laser cutting follows cut geometry on a panel. A photograph or mood image is enough to start a conversation, but production needs the design resolved at real size, with every shape located. The practical checklist:
- A reference that shows scale — a person, a doorway or a dimensioned elevation beside the motif.
- The motif density you want held at actual panel height, not as a thumbnail where any pattern looks suitably open.
- Whether the pattern repeats across panels or is composed as one continuous image across the whole run.
- Solid border width, if the design calls for a frame around the cut area.
- Anything that must line up with an existing site element — reception desk height, a logo, a handrail, a light fitting.
Where you supply a reference image rather than resolved artwork, we work from it and return proposals for approval. Sign off the cut layout before cutting begins; once a panel is cut, changing motif spacing means producing a new panel.
4. Material, thickness and finish
Stainless steel is the base material for these screens, chosen in high-traffic interiors for corrosion resistance and easy cleaning. Surface treatment is where design intent is either achieved or lost, so treat it as a decision settled on samples rather than a colour name on a specification sheet.
For gold-toned work two finishes behave very differently under lobby lighting: a mirror finish reflects the room and multiplies the pattern visually, while a brushed gold reads as a warm surface and keeps cut shapes legible. A gold mirror stainless steel screen with rose gold decorative accents combines both — mirrored ground with applied floral accents — and the accent elements need specifying separately from the cut pattern. Antique bronze and matte black are other treatments we work with.
Material, finish, thickness and size are all customizable on this product line. Approve the finish on a physical sample viewed in the actual room light, both by day and under artificial light. A gold tone photographed against a white studio background is not the same colour as that panel set against dark stone under downlights.
5. Structure behind the screen and fixing method
A decorative screen is still a vertical element in a public space, so the fixing method has to be settled before production: framed on all edges or fixed at head and sill; what substrate receives the fixings; whether the screen is freestanding between floor and ceiling; and whether an access panel is needed behind it. If the partition carries lighting or sits in front of services, say so at drawing stage — an opening added after cutting means a new panel.
Tell us the wall construction you intend to fix to. Steel, plasterboard on studs and masonry take different fixings, and that choice changes the profile detail drawn at the panel edges.
6. Delivery route and sequence with other trades
Screens are made to order, so the production slot belongs inside the project programme rather than after it. Two dates matter: when the approved drawing comes back to us, and when the opening is genuinely ready. Under our one-stop furniture and building materials supply, freight forwarding by sea, air and rail is arranged with customs paperwork, packaging and container loading through to door-to-door delivery, so screens travel with the rest of the fit-out package instead of arriving as an isolated late shipment.
Schedule installation after messy trades finish and before loose furniture arrives. Panels installed late still have to be carried through the lobby, and a mirror-finish panel without edge protection is the easiest item in the room to damage on the way in.
7. What to sign off before cutting starts
One consolidated approval sheet should carry: finished dimensions with tolerances, panel count and joint positions, cut layout at full height, finish sample reference, edge and fixing detail, and the delivery address with access notes. Every line on that sheet costs far less to change on paper than in steel.
Where a screen is being specified alongside other metalwork for the same project, our building and construction materials range covers the aluminium and stainless steel finishes we produce with screens, so related wall and ceiling items can be coordinated through one supplier and one shipment.
Send what you already have
A sketch marked up on a plan sheet, a photograph of the opening or an image of something you want reinterpreted is enough to start. We come back with panel layout and finish options for your project, and hold production until the approval sheet is confirmed.
Project enquiries — SANTERSON, PHILLIP · santerson@qq.com · Phone/WhatsApp +86-13928214007 · Contact us