A swim spa looks like a simple line item on a villa or resort schedule: one shell, one set of equipment, one delivery date. In practice the model that works on paper can fail on site over something as small as an access gate, an isolator rating or a coping overhang. That is why we treat Outdoor Swim Spa WS-S06CT-L as a project decision rather than a catalogue purchase, and why we ask buyers to send drawings before we quote.

The details that decide whether this model fits: the clear opening and route to the installation pad; the finished external dimensions against structural openings; what is included in the quoted configuration versus what is optional; and the electrical supply available at the position.

Start with the plan, not the specification sheet

The catalog entry for this model lists 6670 × 2380 × 1400 mm. Those numbers are useful as a first filter, but they are not what a builder installs to. Before anyone signs off on the position, ask the design team for three measurements taken from the construction drawings: the clear internal water length available for lap swimming, the width of the plant and access zone, and the height relationship between the finished pad level and any parapet, deck edge or pergola beam.

Where a spa sits inside a terrace, an internal pool room or a podium deck, the structural opening is usually smaller than it appears on the layout. A shell that fits the room can still fail to reach it. Send us the plan and section, and we will confirm whether the selected model can be delivered through the route shown, or whether the position needs to change.

What the catalog lists for this model

For a first comparison, this is what our product page shows. We publish it so buyers can line it up against their own brief, and we ask them to confirm every item again at quotation stage.

Item shown in the catalogValue on the product pageWhat a buyer should check on their side
External dimensions6670 × 2380 × 1400 mmCompare with the structural opening, the delivery route and the crane or lift capacity available.
Jet total31 pcsConfirm the jet layout against how the space is used — hydrotherapy seating positions differ from a straight lap lane.
Swim training system1 setCheck the swim lane length this produces against the training requirement in the brief.
Water pump / filter pump1 pcs / 1 pcConfirm filtration run hours and any expected bather load for a shared or hospitality setting.
LED lights4Agree colour, position and switching with the lighting designer before the deck is set out.
Total power8.35 kWGive your electrician this figure early; supply capacity and protection are project-side works.
Features shownWater jets, temperature setting, LED lighting, ozone, swim training systemConfirm which of these sit inside the quoted price for your configuration.

Figures above are transcribed from our published product page. The delivered specification is the one written on the signed quotation and drawing set — please confirm it before ordering.

Configuration options change both price and programme

This model belongs to a configurable swim and hydrotherapy range. Catalog-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option listed for one model is not automatically available on this one.

Two of these choices carry more weight than buyers expect:

  • Heat pump versus the standard heating arrangement. The heat pump changes the electrical load and the plant space, so it has to be decided before the electrical design is issued, not after.
  • Insulation. Where the spa sits outdoors and runs through a cold season, insulation affects running cost and how the shell is built into the deck detailing. Suitability for a given climate depends on your site conditions — we specify it from your project data.

Where a villa or hotel brief needs a different footprint — a curved end, an oval shell, a spa set into a terrace edge — our Customizable Shape Outdoor Spa covers square, round, oval and curved designs in an acrylic shell. We decide custom versus standard model from the drawings you send.

Site conditions we need from you before we quote

These are the questions our project team asks on every swim spa enquiry. Answering them in your first email usually saves one full round of correspondence.

  • Access and lifting. Truck size available at the site, gate and doorway widths, and whether a crane, hiab or forklift is on the programme.
  • Pad and structure. Reinforced slab or pedestal system, finished level, drainage falls, and — on an upper floor or podium — the engineer's allowance for a full shell of water.
  • Electrical. Supply capacity at the board, circuit and isolator provision, and who is responsible for the final connection. Equipment power shown in the catalog is the figure your electrician designs to.
  • Water and drainage. Fill source, drain or overflow route, and any local water-feature requirements handled by your consultant.
  • Surrounds. Deck material, coping detail, step arrangement and handrail positions, agreed with the interior or landscape designer.

We manufacture and supply to project scope. Civil works, local electrical connection and permits are carried out by your team, and we coordinate with them through drawings rather than assumptions.

Buying it inside a wider package

Swim spa orders often travel with a wider scope. On villa and resort work we supply them alongside outdoor furniture for the same terrace — loungers, dining sets and pergolas in coordinated frames and finishes — so the poolside reads as one design rather than several separate purchases. Grouping the scope also means one production window, one consolidated shipment and one coordination contact.

Our Turnkey Villa Furnishing service covers consultation, design and planning, production, logistics, installation and after-sales. For swim spa packages, we prepare the equipment schedule and handle packaging, container loading and door-to-door delivery to site.

A short checklist before you commit

1. Confirm the model against your drawings, not the brochure image — including the delivery route.

2. Get the electrical requirement confirmed in writing by your electrician, using the power figure for the agreed configuration.

3. Lock the option list early: heat pump, insulation, UV, sand filtration and steps all change plant space and load.

4. Agree coping, step and handrail details with the designer before the pad is poured.

5. Compare neighbouring models in the range on footprint and jet layout; a longer shell changes the plan, so check the swim lane it actually produces.

If you are weighing this model against another in the range, send us the plan and the usage brief. We will tell you which configuration actually suits the site — including when a shorter shell is the right answer.