A compact laundry is one of the smallest rooms in a villa or apartment, and also one of the easiest to get wrong. Machines have to fit, doors have to swing clear, water and drainage have to land where the cabinet expects them, and the joinery still has to look like the rest of the interior. Because so much depends on dimensions that only exist on your drawings, an enquiry that arrives without the right information usually comes back with more questions than answers.
If you are sourcing compact laundry solutions for a residential project, the preparation below is what turns a first email into a workable quotation and a buildable set of cabinets.
1. The dimensions that actually decide the layout
Send the room as a set of measured or drawing-derived numbers, not a photograph with a rough estimate. For each space, include:
- Clear width, height and depth at the intended location, including any skirting, cornice, pipework or ductwork that reduces the usable envelope.
- The position of the doorway, the direction it opens, and how much clearance is needed for a machine door to swing fully open.
- Ceiling height under any bulkhead, and whether the cabinet is expected to run floor to ceiling.
- Where the room sits relative to wet areas — bathroom, kitchen or laundry alcove — because that governs waterproofing and ventilation requirements.
Our Laundry Integration pieces are made to measure, with sizing, layout and finish specified per project. That flexibility only helps once we know the real envelope, so a dimensioned floor plan or a marked-up PDF of your drawing is far more useful than a standard catalogue size.
2. The appliance list, with model references
Tell us which machines are going into the space and, where possible, give the brand and model or at least the external dimensions. A washer and dryer of the same advertised capacity can differ by several centimetres in depth, and that difference decides whether a stacked laundry unit sits flush or protrudes past the surrounding wall.
It also helps to say which configuration you are considering:
| Configuration | What we need from you |
|---|---|
| Side-by-side machines with benchtop above | Combined width of both appliances, required bench height, and whether the tapware sits behind the bench. |
| Stacked laundry unit | Machine heights, ceiling clearance, and access for servicing the upper appliance. |
| Machines concealed in a cabinet or cupboard | Door type and swing, ventilation provision, and how deep the carcass can go. |
| Laundry combined with storage | What else has to live in the run — linen, cleaning supplies, ironing surface, hanging rail. |
If appliances have not been selected yet, say so plainly. We can design around a generic machine envelope, but you should then reserve tolerance for whichever model is finally purchased.
3. Services and site conditions
Joinery fails most often at the services interface. Please include on your drawing or in your enquiry:
- Cold and hot water supply locations, plus tapware type if already specified.
- Waste and overflow positions, drain diameter, and whether the trap is in-floor or in-wall.
- Power outlet positions for each appliance, and any dedicated circuit requirements from your electrician.
- Ventilation: existing window, exhaust fan, or a requirement to build a vented panel into the cabinetry.
- Floor finish and finished floor level, since a tiled laundry and a timber-floored alcove need different plinth and moisture detailing.
4. Storage and household workflow
A laundry is judged on whether it holds the things you actually use. Before contacting a supplier, list what has to be stored and how you want to reach it — this drives the internal fitout far more than aesthetics does. Typical items worth specifying:
- Sorting for washed and unwashed loads, handled by pull out laundry hampers set into a base cabinet.
- Bulk supplies such as detergent and bulk linen, which suit deep drawers or a multi function tall cabinet rather than open shelving.
- An ironing surface that folds away, or a fixed bench with seating for folding.
- A hanging rail for items that go straight from machine to wardrobe.
- Small hardware — pegs, stain treatment, shoe polish — which needs shallow drawers or door-mounted racks.
5. Finishes and how the room connects to the rest of the project
Compact laundries are rarely closed off; they read from a hallway, bedroom or kitchen. Tell us which finishes already exist in the adjoining spaces so the cabinetry can be matched rather than invented:
- Door and architrave finish, plus the wardrobe fronts in adjacent bedrooms — melamine, lacquer, acrylic, veneer or glass.
- Benchtop material and edge profile already used in the kitchen.
- Wall and floor tiles, and whether hardware is specified elsewhere as brushed metal, matte black or another finish.
If your project also includes built-in wardrobes or custom built-in kitchen cabinets, send those specifications together with the laundry enquiry. Same carcass material, matching edge banding and consistent hardware across all three rooms is much easier to achieve when they are quoted as one package.
6. Project context: quantities, programme, destination
For anyone ordering beyond a single apartment, add the commercial details up front:
- Quantity — one off, or repeated units across several dwellings in the same development.
- Whether layouts repeat or each unit differs; repeated layouts reduce both cost and error rate.
- Required delivery window on site and any storage constraints at the destination.
- Delivery address and who receives the goods, plus whether installation is by your trades or required from us.
- Any inspection, snagging or handover documentation your builder requires.
We supply furniture and building materials as a single package, so a laundry enquiry can sit alongside the rest of the fit-out rather than being tendered separately through several vendors.
7. What to expect back from a supplier
A competent response should include more than a price. Before you commit, check that the quotation states:
- Carcass material, panel thickness and edge treatment, and the finish applied to doors and drawer fronts.
- Confirmed machine clearances, including ventilation gaps rather than assumed ones.
- Hardware brand or grade for hinges, runners and handles, so replacements later are obtainable.
- Which dimensions you must confirm on site before production starts — this is the step that protects you from a finished floor level changing during tiling.
- What is included in delivery, what is not, and how damage claims are handled.
A short checklist to paste into your enquiry
- Measured plan of the space, with clearances and services marked.
- Appliance brands and models, or the envelope you are designing to.
- Preferred configuration: side-by-side, stacked, concealed, or combined with storage.
- Storage list and internal fitout preferences.
- Adjoining finishes for matching — cabinetry, benchtop, hardware, tiles.
- Quantities, delivery window, destination address, installation responsibility.
Send those six items with your enquiry and the first reply will be a specification you can act on, not a list of questions. If you are coordinating a laundry alongside wardrobes, kitchen cabinets or bathroom fit-out for the same project, we can price and produce them together — send us your drawings and appliance list to start.