A quotation for kitchen cabinetry only becomes comparable once every buyer and supplier are describing the same set of doors, carcasses and hardware. When the request is simply “wood grain melamine cabinets”, two factories can return very different prices for what look like identical kitchens on a rendering. The difference sits in the specification. Below is the field list we ask project owners, builders and joinery contractors to complete before they send an enquiry, using our Wood Grain Melamine Cabinets as the reference product.
Start with the room, not the finish
Send drawings before you send colour samples. A set of measured plans showing wall lengths, ceiling height, window sills, door swings, floor levels and the position of existing services tells us how many linear metres of base units, wall units and tall units the job actually needs, and where special corners appear. If a plan is unavailable, a site sketch with dimensions written on it is enough for a first pass.
At minimum, we need:
- Room dimensions with the datum you measured from, plus finished floor and ceiling levels
- A layout intent — straight run, L-shaped, U-shaped, or an island — and whether appliances are built in or freestanding
- Locations of water supply, waste, power points, rangehood ducting and any gas line
- Handover dates for the kitchen zone, because tall units and benchtops are usually installed after wet trades finish
Name the substrate, not just the surface
“Melamine” describes a decorative paper finish pressed onto a board core; it does not describe the core itself. Two panels with the same wood grain print can behave very differently in a humid kitchen or a coastal villa. In your specification, record the board type for doors and for carcasses separately, and say which parts sit near the sink, the dishwasher or an external wall.
Within our melamine range you can compare finishes across Matte Melamine Cabinets, High Gloss Melamine Cabinets and Textured Melamine Cabinets. If the design mixes a timber-look door with a solid colour, note that combination explicitly — a two-tone scheme changes the number of distinct door types and therefore the price. Where the brief calls for a different core material or a matched finish from another family, our Custom & OEM Service covers bespoke material finishes and textures, prototyping and made-to-measure production.
Specify the grain, not just the colour
Wood grain is where samples matter most. For each door type, state:
- Species and tone reference — oak, walnut, teak or an approved sample number
- Sheen: matte, textured or high gloss, and whether the same finish applies to wall units as well as base units
- Grain direction on each door and on drawer fronts, since a vertical grain on one elevation against a horizontal grain on another reads as an error on site
- Edge treatment: matching edge band or a contrasting reveal, plus the radius of the edge profile
- Whether the grain is matched across adjacent doors in a run, and whether book-matched or sequence-matched panels are required
Order a physical sample panel for approval rather than relying on a screen. Colour perception shifts with site lighting, and a sample also lets the client check how the grain reads at arm’s length.
Write down layout and internal fit-out
Made-to-measure sizing means the carcass follows the room, so specify each run rather than assuming standard widths. Record unit heights where a ceiling is not level, toe-kick depths, benchtop thickness and whether the benchtop is supplied with the cabinetry or by another trade.
For interiors, list what goes into each tall unit and corner: pull-out trays, corner carousel fittings, drawer banks, appliance towers, integrated bins and any lighting inside glass-front units. These items are usually quoted as options, so an incomplete internal list is the most common cause of variation between two quotations.
Lock hardware and tolerances
State handle or handleless profile choice, hinge type and soft-close requirement, drawer runner grade where the client has a preference, and door thickness. Also record site tolerances: out-of-plumb walls, floor deviation across the run, and whether scribes or filler panels are acceptable. Where the joinery must meet other finishes — tiled splashbacks, plaster returns, engineered timber flooring thresholds — name the interface detail so the site team is not solving it on installation day.
Add the delivery and handover terms
Close the specification with logistics details: destination address, access constraints for the drop-off, container or pallet preference, and who receives the goods. Our Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, shipment tracking and delivery to site, with installation and after-sales handled as a separate stage listed under Our Services. Confirm import terms, duties and delivery scope for each project in writing; transit arrangements are agreed case by case rather than quoted as a fixed service level.
A six-line checklist before you send the enquiry
- Drawings or measured sketch, with levels and services marked
- Board type stated separately for doors and carcasses, plus any wet-zone requirement
- Grain reference, sheen, edge band and grain direction per door type
- Internal fit-out list per unit, including appliance and lighting positions
- Hardware schedule and site tolerances or scribe rules
- Destination, access notes, handover sequence and the person receiving delivery
Send those six items with your enquiry and the quotation you receive can be compared line for line against any other supplier’s. If a specification is still taking shape, our team works through space planning, material selection and product specification as part of the One-stop Solution, so you can confirm dimensions and selected specifications before production starts.
To discuss a kitchen package for a villa, apartment or hospitality project, contact SANTERSON — phone / WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com, or use the Contact page.