Floor-to-ceiling joinery looks simple on a drawing and complicated on site. A wall of shelving that reads as one line in a schedule is really a set of panels, shelves, doors, finishes, hardware and sometimes lighting, each with its own place in the production and delivery sequence. This guide walks through how we plan quantities and coordinate the related products for Santerson Floor to Ceiling Systems, so that the order you release is the order that fits on site.
Start with elevations, not a shelf count
The most common quantity error on a built-in wall project is counting metres of shelving instead of counting walls. Send us an elevation for every run you want fitted out — media wall in the living room, library wall in the study, wardrobe wall in the bedroom — with the finished floor level and the soffit or ceiling line marked. These systems are made to measure for each space, so a run that passes under a beam, returns around a column or stops short of a door reveal has to be dimensioned as its own segment.
For each elevation, mark three things: the overall width and height, any obstruction such as an air grille, light switch or skirting return, and what you want fixed versus adjustable. That last point changes the panel layout, so it is better settled at quotation stage than on installation day.
Choose the system before you split the quantities
Our wall systems sit in three related collections, and a project that combines them needs one coordinated schedule rather than three separate orders:
- Santerson Floor to Ceiling Systems — shelving-led wall systems for residential projects, with layout, dimensions, material and finish specified per project.
- Santerson Floor to Ceiling Modular Systems — living-room configurations where open display, closed storage and media zones share one module grid.
- Santerson Floor to Ceiling Bookshelves — bookshelf-led walls, usually the starting point for studies and library rooms.
Pick the collection room by room first. Then split each run into modules — open shelving bays, closed cabinet bays, drawer units, display niches — because quantities are reviewed module by module, not as a single wall total.
A practical quantity checklist
Confirm the following for every run before you sign off the order. Anything left open at this stage tends to become a variation later.
- Segments and dimensions. Width, height and depth of each segment, taken from site or from verified drawings, including where a run meets a wardrobe or wall panel.
- Module mix. How many open bays, closed bays, drawer units and display niches per segment, and which shelves are adjustable.
- Finish schedule. Body finish versus door or panel finish. A two-tone scheme needs each colour stated per module, not just per room.
- Hardware and lighting. Hinge type, slide type, handles or a handleless edge, and any built-in lighting — see Santerson Integrated Lighting Systems. Electrical specification and driver location should be agreed before production starts.
- Room context. Where the same finish continues into Wall Panel Systems, concealed doors or wardrobes, list those items on the same schedule so the batch is produced together.
Coordinate the products that share a wall
A floor-to-ceiling wall rarely stands alone. In villa and apartment work we usually group it with the joinery it touches: wardrobes on the same return, media or TV units below a display wall, storage in hallways, and the panelling that closes the gap between a unit and a ceiling. Ordering these as one package keeps finishes consistent and puts all of the panels in the same container.
Where a project spans several rooms, we build the schedule room by room but keep one finish reference list across the whole job. That is how a study library wall, a bedroom wardrobe and a hallway storage wall end up reading as one design instead of three separate purchases.
Sequence production, delivery and installation
Built-in joinery should arrive after the wet trades and surface finishes in that room are complete, but before loose furniture and soft furnishings. Our workflow follows six stages — consultation, design and planning, production, logistics, installation and after-sales — and for wall systems we agree the site-ready date at design stage so production is scheduled backwards from it.
On delivery, packing lists are marked by room and segment, which lets the crew open one wall at a time rather than unpacking the whole shipment at once. On larger projects we provide on-site guidance, so the first wall installed becomes the reference for the rest.
What to send us for an accurate quantity schedule
- Room elevations with dimensions in CAD or PDF, plus photographs of the walls involved.
- A short note per room on use: storage heavy, display heavy, media, books, or a mix.
- Your preferred finishes, and any existing joinery the new work has to match.
- The site completion date for each room, so production and delivery can be sequenced around it.
Send those across and we will return a module-by-module schedule with dimensions, finishes and a coordinated delivery plan for the whole wall package. If the same project also needs cabinetry, bathrooms or outdoor areas furnished, our Turnkey Interior Project Solutions cover the joinery alongside the rest of the fit-out.