A two tone melamine wardrobe is one of the fastest ways to anchor a bedroom scheme: a lighter field panel against a darker frame, or a wood-grain door paired with a solid-colour carcass, reads as designed joinery rather than off-the-shelf storage. Because the pieces are made to measure, the quality of your quote request decides how accurate the price is and how few surprises appear later. Below is the practical checklist we use when a buyer or project team sends us a wardrobe enquiry.

Start From the Room, Not the Catalogue

Our Two Tone Melamine Wardrobes are built-in wardrobe projects, so the first thing we need is the space itself. A catalogue image tells us the look you like; it does not tell us whether your wall is 2,100 mm or 2,750 mm wide, whether the ceiling is flat or sloped, or whether a skirting board, air-conditioning return or door swing will cut into the run. Send us:

  • a simple dimensioned sketch or the architectural room drawing, with overall width, height and depth noted
  • photographs of the wall from both ends, plus close-ups of corners, cornices and any obstruction
  • the floor finish, so we can allow for the correct plinth and door clearance
  • whether the wardrobe stops short of the ceiling or is planned as a full-height built-in with a top panel

Dimensions are confirmed per project before production, so an early sketch avoids the most common rework: doors ordered to a nominal size that no longer fits once plaster, tiles or flooring are in place.

Decide the Two-Tone Split Before Pricing

"Two tone" can mean several different builds, and each one prices differently. Tell us which split you have in mind:

Frame versus field. A darker or wood-grain frame around lighter door panels — the most common residential detail, and the closest match to a shaker-style joinery look. Doors versus carcass. One finish on the visible doors, a second inside the open compartments and shelves. This changes the exposed-edge detailing we quote. Vertical banding. Alternating full-height panels across a long run, often used to break up a wide wall in a master bedroom or dressing room.

If you are undecided, send the finish direction and we will show comparable options from the same collection: Matte Finish Melamine Wardrobes for soft, low-glare surfaces; Wood Grain Melamine Wardrobes when the second tone should read as timber; and Solid Color Melamine Wardrobes for a flat, uniform block of colour. Pairing one of these against another is usually the simplest way to land a two tone scheme.

Specify the Interior Layout You Actually Need

The carcass is only half of the job. Layout is tailored per project, so list how the wardrobe will be used: hanging length for long garments, shelf heights for folded stacks, drawer count, and whether you want an open section for daily items. Also note hardware preferences — soft-close hinges and drawer runners, integrated handles versus a handleless edge pull, internal lighting and its power feed — and any parts you would rather supply locally, such as a mirror panel or a specific handle finish.

For a bedroom where the wardrobe is the main storage wall, we can also work from your own layout drawing; if you do not have one, our design team can develop the internal configuration with you before the quotation is issued.

What a Complete Enquiry Looks Like

  • Room dimensions and drawings, plus photographs of the wall
  • Number of wardrobe runs or rooms covered by this enquiry
  • Preferred two tone split and candidate finishes from the collection
  • Door type: hinged, sliding or open — sliding doors need a track and overlap allowance that affects price
  • Internal layout list: hanging, shelves, drawers, open bays, lighting
  • Hardware and accessory preferences, and anything you will supply on site
  • Delivery destination, port or site address, and the preferred Incoterms
  • Programme dates: when drawings must be approved and when the goods are needed on site

For villa and apartment projects where wardrobes sit alongside cabinetry and other built-ins, send the full fixture schedule with the wardrobe enquiry. Bundling the joinery into one request usually makes freight consolidation and site sequencing simpler than ordering each item separately — see our custom built-in kitchen cabinets for the same project-based approach in kitchens.

How the Quote Comes Back to You

StageWhat happensWhat we need from you
Enquiry reviewWe check dimensions, finish direction and layout list, and flag anything missing.Drawings, photos, finish references.
Design and specificationLayout is developed or confirmed; material and finish options are matched to your scheme.Approval of the layout and selected finishes.
Quotation and detail confirmationPriced proposal with the confirmed specification, packaging and delivery basis.Written confirmation of details and quantities.
Production and shipmentManufacturing to the approved drawings, then logistics arranged to your destination.Delivery address, importer details, target dates.
Installation and follow-upSite guidance and after-sales support arranged for the project.Site access and trade coordination.

Scope, minimum order quantities and lead times are confirmed per project rather than quoted from a fixed table, so figures in the proposal always follow your drawings.

Questions We Are Often Asked Before Quoting

Can you match a sample I already have? Send the physical sample or the make and reference of the board you are matching. Finish and texture options are specified per project, and we confirm feasibility before committing it to the quotation.

Can one design carry through bedrooms of different sizes? Yes. Sizing is made to measure, so the same two tone language can be repeated across rooms with adjusted runs and door counts, which keeps a villa or apartment scheme consistent.

Do you supply only the wardrobe? We also supply interior fixtures and finishes for the same project, so wardrobes can be coordinated with wall panelling, cabinetry and other built-ins under one procurement package.

Send Your Enquiry

To request a quotation for two tone melamine wardrobes, send:

1. Dimensions or drawings for each wardrobe run

2. Your chosen two tone split and finish references

3. Internal layout and hardware list

4. Delivery destination and programme dates

We review the pack, come back with questions or a proposal, and confirm every detail before production starts.

Browse the full product range or go straight to our contact page to start an enquiry.