A glass-front media unit looks simple on a drawing: a run of cabinetry, a lit display niche, a screen mounted above it. On site it is one of the hardest built-in items to get right, because glazing, hardware, cable routes and wall structure all have to agree before production starts. When that cabinetry is ordered from an overseas manufacturer, the margin for a late change shrinks further — corrections travel by container, not by van. This guide walks through how we specify and supply Santerson Glass Front Media Units for villa and residential projects, what a buyer needs to send us, and how the process runs from first drawing to handover.

What a glass-front media unit actually has to solve

Media joinery sits at the intersection of three jobs. It carries equipment, it displays objects, and it is the visual anchor of a living room. Glass fronts push all three at once: they expose whatever is behind them, so storage planning has to be honest about what will be on show.

In practice we design these units around four questions:

  • What sits behind the glass? Display pieces need shelf spacing sized to the objects. Equipment needs ventilation and a line of sight for remote control, which changes both shelf depth and whether the glazing is clear or tinted.
  • Where do cables go? Power, HDMI and antenna routes are cut into the carcass at production. Retrofitting them means drilling finished panels on site.
  • What does the wall carry? A wall-hung unit on a framed partition needs different fixing detail than one on solid masonry. We need to know this before we draw the batten frame.
  • How much light, and where from? Lit display niches are wired inside the carcass. The driver has to stay accessible, and the cable route has to be planned with the electrician, not after plastering.

Every one of these decisions is fixed at the factory. That is why the specification stage matters more on an imported unit than on one cut locally — and why we treat the drawing package, not the order form, as the real deliverable.

The product family: how our media units differ

Our TV cabinets and media units are configurable built-in furniture rather than fixed catalogue sizes. Finish, layout and dimensions are set per project, so a unit can be matched to the wall it belongs to and to the joinery running through the rest of the house. The main configurations we specify are:

ConfigurationWhere it is usedSpecification points to close before production
Glass Front Media UnitsDisplay-led living rooms, media walls with curated shelvingGlass type and tint, shelf spacing, door or lift-up mechanism, hinge and handle selection, internal lighting
Integrated LED Media UnitsNight-time ambience, hotel-style display nichesLight temperature, profile position, driver location and access, switching circuit
Open & Closed Combo UnitsFamily rooms where clutter has to disappearRatio of open to closed storage, drawer layout, equipment bays with doors
Freestanding TV CabinetsRented properties, rooms where the wall cannot be opened upOverall size, plinth or floating base, top detail, finish match to other case goods
Wall Mounted Media WallsFull-height feature walls, screen recessed into panellingSubstrate and batten frame, screen recess size, service void, panel joints
Floating TV UnitsCompact living rooms, seamless wall-to-cabinet detailingLoad path and fixing substrate, cantilever depth, cable concealment

Glass-front units are the ones we most often see under-specified at tender stage. A drawing will show a cabinet with a glazed door and stop there. Glass thickness, whether the pane is toughened, how it is edge-finished, whether the frame is aluminium or matched to the carcass material, and what hardware carries the weight of a glazed door — those details decide whether the unit arrives as intended.

What to send us before we quote

A precise quotation depends on a precise brief. For a media wall we normally ask project buyers, builders and designers for:

  • A dimensioned elevation of the wall, including ceiling height, skirting, and any recess or column that interrupts the run.
  • The screen size and its mounting method, plus whether it sits in front of the panelling or recessed into it.
  • A list of equipment to be housed, with dimensions for anything enclosed — console, soundbar, receiver, games hardware.
  • Your intent for each compartment: display, closed storage, or open. This drives shelf loading and whether adjustable shelves are needed.
  • Finish direction: a sample reference, paint code, or a photo of the flooring and wall panelling the unit has to sit against. Our media units can be matched to wider built-in furniture packages, so we coordinate the veneer, lacquer or laminate with the wardrobes and kitchen rather than treating the unit as a standalone purchase.
  • The electrical setting-out drawing if the wall is lit or the screen is recessed. If it does not exist yet, tell us — that is a coordination item, not a reason to delay.
One practical note on glazing. Glass specification, storage layout and hardware are confirmed per project before we produce anything. We do not publish a single fixed spec sheet for these units, because the right answer depends on what the compartment carries and how the unit is used day to day. Confirm those selections in writing at approval stage — that document, not the catalogue page, is what governs production.

How the process runs with an overseas manufacturer

SANTERSON has been manufacturing furniture and building materials in China since 2008, and we supply built-in furniture as part of wider fit-out packages rather than as isolated items. Buying from an overseas factory is not a risk if the sequence is disciplined. Ours runs like this:

1. Brief and design proposal

We start with your drawings and site photographs, then come back with a layout proposal and questions. This is where we flag problems before they cost anything: a floating unit on a wall that cannot take the load, a shelf directly behind a screen where heat will build, a glass door whose swing conflicts with the seating layout.

2. Quotation and detail confirmation

Pricing follows from the closed specification — materials, finishes, glass, hardware, lighting, packaging. At this stage we also confirm what is included in the price and what stays with the local trades: substrate preparation, electrical first fix, final connections on site.

3. Custom fabrication and prototyping

Where a project needs a bespoke profile, an unusual finish, or joinery that has to match samples already approved by the client, we work through custom and OEM service: 3D modelling, prototyping, material and finish trials, then production sign-off. Brand or project labelling for packaged components can be arranged here too.

4. Production and quality checks

Panels are cut, edged and finished in the factory, glazed doors assembled with the agreed hardware, and each unit pre-checked against the approved drawing before packing. Photographic inspection records go out to the buyer, so an approval can be given before the container is loaded.

5. Packing, freight and delivery

Built-in joinery is packed panel by panel with the fixing hardware, gaskets and hinges separated and labelled to drawing reference. We arrange sea, air or rail freight, prepare shipping paperwork, and deliver door to door — to a builder's yard, a project address, or a consolidation point if the media unit is travelling with engineered wood flooring, panelling and other finishes from the same order.

6. Installation and handover

Units arrive with setting-out dimensions and installation instructions so a local joiner can fix them, or we support the site directly. Snag items are inspected and closed out, and spare panels or hardware can be supplied later if the project needs them.

Why buyers group media units with the rest of the fit-out

A media wall ordered on its own is a small purchase. Ordered as part of a villa or apartment package, it becomes easier to control: the same drawing set governs wardrobes, kitchen cabinetry, panelling and flooring, so finishes match without anyone eyeballing two samples from different factories. Colour drift between veneers from separate suppliers is one of the most common snagging complaints on residential fit-outs, and it is a coordination failure rather than a manufacturing one.

That is how we work as a one-stop furniture and building materials supplier. The media unit, the wall panelling behind it, the storage running alongside and the floor in front of it come from one production programme, with one set of approved finishes and one delivery schedule. Fewer suppliers also means fewer gaps where a defect gets blamed on someone else.

A worked example: what the drawing package contains

For a glazed media wall in a residential living room, an approval pack we would issue typically covers:

  • Elevations of the full run with overall and module dimensions, and the screen recess marked.
  • Carcass sections showing panel thickness, shelf fixing method and the service void.
  • Door details: frame material, glass type and edge treatment, hinge type and load rating, handle position.
  • Lighting layout: profile positions, diffuser type, driver location and access panel.
  • Fixing detail: batten frame setting-out and the substrate it must be fixed to.
  • A finishes schedule naming each surface, edge and hardware item.

Every line in that pack is a decision the site team would otherwise improvise. When the pack is signed off, production follows it exactly — which is the whole point of ordering factory-made joinery instead of building it on site.

Questions buyers ask us most often

Can you match a finish we already have approved?

Yes, if we can see it. Send a physical sample, a manufacturer reference, or a paint code with the substrate noted. Veneers in particular need a sample rather than a photograph, because grain and sheen do not read reliably on camera.

What is the minimum order?

Media units are made to measure for individual projects, so a single unit can be produced. Where quantities matter is when the same detail repeats across apartments or villas — then tooling, packaging and freight consolidate, and we can hold the specification consistent across phases.

Who installs it?

Either way. Many builders use their own joiners with our setting-out drawings and instructions; where a project needs continuity, we coordinate installation support and follow up on snags. What matters is that the substrate and the electrical first fix are complete before the panels arrive.

What happens if a panel is damaged in transit?

Packing is designed for this, but damage does happen. Report it with photographs and the packing reference against the drawing number, and we produce a replacement panel to the same approved specification. This is why labelled, drawing-referenced packing matters — an unlabelled panel is very hard to identify.

Getting started

If you have drawings for a media wall or a set of rooms where built-in joinery still needs pricing, send us the elevation, the equipment list and your finish direction. We will come back with a layout proposal, the questions that need closing, and a quotation built on a specification you can approve before production starts. Reach our team through the contact page to start the process.