A dining cabinet that arrives "as discussed" is a risk on any residential fit-out. What protects the project is a written specification: dimensions, materials, finishes, internal layout and hardware recorded line by line, so the quotation, the production drawing and the delivered unit all describe the same piece of furniture. This guide shows procurement teams, designers and homeowners how to specify Santerson Decorative Dining Cabinets in a way that holds up on site.
Start from the product family, not a single photo
Dining cabinets and sideboards sit inside our built-in furniture range, and each item is configured per project rather than ordered off a shelf. Before you fix a finish, decide which member of the collection actually suits the wall you are working with:
- Decorative dining cabinets — made-to-measure sizing with selectable material and finish, used where the cabinet carries visual weight in the room.
- Glass front dining cabinets — for crockery, glassware and display storage, where glazing type and shelf spacing need to be stated.
- Tall dining cabinet — vertical storage for pantry and linen items, with project-tailored internal layouts.
- Wall mounted sideboards — where the floor is left clear or the wall build-up has to be confirmed first.
Naming the correct item in your enquiry prevents a quotation being written against the wrong reference. If a room needs two of them, specify each one separately.
The six fields every dining cabinet specification needs
- Location and function. Which room, which wall, and what the cabinet has to hold: tableware, bottles, linen or serving equipment. Storage intent drives internal layout more than appearance does.
- Dimensional envelope. Overall width, height and depth, plus clearances for door swing, skirting, architraves, switches and any wall recess. State finished-floor-to-finished-ceiling heights, not structural ones.
- Carcase and door material. Record the substrate, the surface type (veneer, lacquer, laminate or acrylic) and the edge treatment. Our custom furniture and interior products manufacturing covers bespoke finishes and textures, so write the exact finish name instead of "as sample".
- Internal layout. Shelf counts and spacings, drawer numbers and depths, adjustable versus fixed shelves, and any provision for glass shelving or lighting. Draw it; a sketch with dimensions beats a paragraph.
- Hardware and opening. Hinges, slides, handles or handleless profile, door direction, soft-close requirement. Specify whether the unit is freestanding, built-in or wall-hung, because fixing method follows from that.
- Interface conditions. Wall build-up for wall-hung units, floor covering thickness at the plinth, skirting treatment, and any electrical outlet the cabinet must clear or conceal.
How the specification moves through production
Santerson works as a one-stop furniture and building materials supplier, so the same document carries from enquiry to delivery. The sequence we follow is project brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. Each stage has a specific use for your specification:
- Quotation. Line items match your fields one-to-one, so alternative finishes can be priced side by side rather than quoted as one lump.
- Detail confirmation. You review production drawings and finish samples against the written specification before tooling starts. Changes are cheapest here.
- Production and quality control. The confirmed drawing is the inspection reference; deviations become visible at the factory instead of in your dining room.
- Delivery and installation. Packing lists reference the same item codes, and installation and after-sales support is booked against units that are already defined.
What to attach to your enquiry
A specification travels better with supporting material. Send the room elevation or a marked-up plan showing where the cabinet sits, a finish reference (sample code, photograph or physical swatch), and the quantity of each configuration. Where the project also needs matching pieces — kitchen cabinetry, wardrobes, wall panelling or display units — send them together as one package so materials and finishes are reconciled once, not room by room.
If your team does not yet have drawings, our interior design services cover space planning, furniture layouts and 3D visualisation, which turn a marked-up plan into the production documents described above.
Common specification gaps to avoid
- "Standard size." These cabinets are made to measure; there is no standard module to fall back on. Give real numbers.
- Finish named by colour only. Two "matte grey" surfaces in different materials read differently under site lighting. Name the material and the finish together.
- No internal layout. A cabinet specified only externally cannot be checked on delivery for what is inside it.
- Ignoring services. Sockets, switches, extraction and lighting feeds need to appear in the drawing before production.
- Late substitutions. Swapping hardware or glazing after detail confirmation changes price and lead time; raise it as a revision instead of an assumption.
Confirming the specification before you order
Treat the final document as a checklist: item reference, quantity, dimensions, materials and finishes, internal layout, hardware, fixing method, and the interface conditions for the wall and floor. When those fields are complete and signed off at the detail confirmation stage, the quotation you approved is the cabinet that arrives. Send your drawings and finish references to us and we will return a specification-based quotation for each dining cabinet in the package.